Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹5.1 L+₹27,018.67 (5.64%)Rejected-Finance IN FRONT OF SBI BANK KHARGONE ROAD SANAWAD DIST KHARGONE SANAWAD KHARGONE WEST NIMAR MADHYA PRADESH 451111 | KHARGONE | MADHYA PRADESH | 451111 | L2 | Rejected-Finance L2 Bidder | |
| 3 | L3₹5.3 L+₹50,458.97 (10.5%)Rejected-Finance WARD NO 2 21 GRAM PANCHAYAT SAILANI NEAR PIPAL TREE SIDDHWARKUT DISTT KHANDWA 450554 M P | EAST NIMAR | MADHYA PRADESH | 450554 | L3 | Rejected-Finance L3 Bidder | |
| 4 | L4₹5.7 L+₹93,897.57 (19.6%)Rejected-Finance | L4 | Rejected-Finance L4 Bidder | |
| 5 | L5₹5.7 L+₹95,676.47 (20.0%)Rejected-Finance | L5 | Rejected-Finance L5 Bidder |
Tender Value
₹8.5 L
Closing Date
4 Feb 2021, 3:00 pmClosed
DGM CandP, CandP Division
CandP division, Admin Block, Omkreshwar Project, Siddhwarkut, Khandwa 450554
Repair works of Protection RR wall along the external Boundary wall at Urja Vihar Parisar
2021_NHDC_609614_1
NHDC/3/C/098/NIT- 503/21/091 Dated12-01-2021
Open Tender
Civil Works
Works
90 days
Omkreshwar Project, Siddhwarkut, Khandwa
Please refer Tender documents.
9 documents required · 9 mandatory
₹590
Yes
NHDC Ltd
Exempted
3 Aug 2021
14 Jan 2021
11 Feb 2021
14 Jan 2021
4 Feb 2021
14 Jan 2021
14 Jan 2021 - 29 Jan 2021
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Random rubble masonry with available hard stone in in foundation and plinth including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like. Cement mortar 1:6 (1 cement : 6 coarse sand).
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)
Centering and shuttering including strutting, propping etc. and removal of form for :Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing : 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size).
Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) : Flush/ Ruled pointing
SIKANDAR TRADING COMPANY
MAA REVA CONSTRUCTION COMPANY
HI-TECK
VERMA ENGINEER
ANITA SONI
KRISHNA ENGINEERING CONSTRUCTION COMPANY
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .