Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.8 LQualified Make: OEM
Model: FFU FORWARD BOTTOM ASSEMBLY JIG & Walkway
Title: OSTOOL- MANUFACTURE & INSTALLATION OF PRE JIG2-FFU FORWARD BOTTOM ASSEMBLY JIG & Walkway, Package/Se | Make: OEM
Model: FFU FORWARD BOTTOM ASSEMBLY JIG & Walkway
Title: OSTOOL- MANUFACTURE & INSTALLATION OF PRE JIG2-FFU FORWARD BOTTOM ASSEMBLY JIG & Walkway, Package/Se | L1 | Qualified MSE, MII, Category: General | |
| 2 | L2₹20.0 L+₹22,457.63 (1.14%)Qualified Make: NA
Model: H/D/TL/25/3/1
Title: OSTOOL- MANUFACTURE & INSTALLATION OF PRE JIG2-FFU FORWARD BOTTOM ASSEMBLY JIG & Walkway, Package/Se GAT NO 565 AT POST VELU BEHIND NAMO MARBLE TIMBERS TAL BHOR PUNE MAHARASHTRA 412205 | PUNE | MAHARASHTRA | 412205 | Make: NA
Model: H/D/TL/25/3/1
Title: OSTOOL- MANUFACTURE & INSTALLATION OF PRE JIG2-FFU FORWARD BOTTOM ASSEMBLY JIG & Walkway, Package/Se | L2 | Qualified MSE, MII, Category: General | |
| 3 | L3₹25.0 L+₹5.2 L (26.5%)Qualified Make: METROLAB
Model: MANUFACTURE & INSTALLATION OF PRE JIG2-FFU FORWARD
Title: OSTOOL- MANUFACTURE & INSTALLATION OF PRE JIG2-FFU FORWARD BOTTOM ASSEMBLY JIG & Walkway, Package/Se PLOT NO 1A 9 SECTOR NO 10 PCNTDA BHOSARI PUNE 411026 METROLAB ENGINEERING PVT LTD BHOSARI BHOASRI PUNE 411026 INDIA PUNE CHINCHWAD BHOSARI AREA | PUNE | MAHARASHTRA | 411026 | Make: METROLAB
Model: MANUFACTURE & INSTALLATION OF PRE JIG2-FFU FORWARD
Title: OSTOOL- MANUFACTURE & INSTALLATION OF PRE JIG2-FFU FORWARD BOTTOM ASSEMBLY JIG & Walkway, Package/Se | L3 | Qualified MSE, MII, Category: General | |
| 4 | L4₹62.9 L+₹43.1 L (218.3%)Qualified Make: ASSEMBLY
Model: FFU FORWARD BOTTOM ASSEMBLY JIG
Title: OSTOOL- MANUFACTURE & INSTALLATION OF PRE JIG2-FFU FORWARD BOTTOM ASSEMBLY JIG & Walkway, Package/Se | Make: ASSEMBLY
Model: FFU FORWARD BOTTOM ASSEMBLY JIG
Title: OSTOOL- MANUFACTURE & INSTALLATION OF PRE JIG2-FFU FORWARD BOTTOM ASSEMBLY JIG & Walkway, Package/Se | L4 | Qualified MSE, MII, Category: General | |
| 5 | Qualified Make: OEM
Model: PRE JIG2-FFU FORWARD BOTTOM ASSEMBLY JIG & Walkway
Title: OSTOOL- MANUFACTURE & INSTALLATION OF PRE JIG2-FFU FORWARD BOTTOM ASSEMBLY JIG & Walkway, Package/Se | Make: OEM
Model: PRE JIG2-FFU FORWARD BOTTOM ASSEMBLY JIG & Walkway
Title: OSTOOL- MANUFACTURE & INSTALLATION OF PRE JIG2-FFU FORWARD BOTTOM ASSEMBLY JIG & Walkway, Package/Se | - | Qualified MSE, MII, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
16 Jun 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
OSTOOL- MANUFACTURE & INSTALLATION OF PRE JIG2-FFU FORWARD BOTTOM ASSEMBLY JIG & Walkway
Package/Se
7888775
GEM/2025/B/6274610
Two Packet Bid
OSTOOL- MANUFACTURE & INSTALLATION OF PRE JIG2-FFU FORWARD BOTTOM ASSEMBLY JIG & Walkway
120 days
Nashik
Total value wise evaluation
PRODUCT_CUSTOM
1 document required · 1 mandatory
Exempted
16 Jun 2025
26 May 2025
16 Jun 2025
OSTOOL- MANUFACTURE & INSTALLATION OF PRE JIG2-FFU FORWARD BOTTOM ASSEMBLY JIG & Walkway
OSTOOL- MANUFACTURE & INSTALLATION OF PRE JIG2-FFU FORWARD BOTTOM ASSEMBLY JIG & Walkway
Package/Set of 02 lines
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7888775.pdf
GEM_BID
buyer_specification_2524_h_d_tl_25_3_2025-05-26-11-24-51_1347747a534a966980eadde8293afec2.pdf
SPECIFICATION
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .