| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.5 CrAdmitted-Finance | -14.99% | ₹17.5 Cr | L1 | Admitted-Finance |
| 2 | L1₹17.5 CrAdmitted-Finance | -14.99% | ₹17.5 Cr | L1 | Admitted-Finance |
| 3 | L2₹18.5 CrAdmitted-Finance | -9.99% | ₹18.5 Cr | L2 | Admitted-Finance |
| 4 | L3₹21.4 CrAdmitted-Finance NOT SPECIFIED IN THE DOCUMENT | +3.98% | ₹21.4 Cr | L3 | Admitted-Finance |
Tender Value
₹20.6 Cr
EMD Value
₹20.6 L
Closing Date
11 Dec 2025, 5:00 pmClosed
CE AND BM MB BURLA
Office of the Chief Engineer and Basin Manager Mahanadi Basin Burla At Po Burla Dist Sambalpur Pin 768017
Renovation of Canal System of Hirakud Dam Project of Barkarley Canal Section Barpali Irrigation Division Barpali
2025_CEBBU_121680_1
CE AND BM MB 30-2025-2026(Online)
Open Tender
Civil Works - Canal
730 days
At Bisalpali Block Binka Dist Subarnapur
As per DTCN
2 documents required · 2 mandatory
₹10,000
₹20.6 L
6 Mar 2026
21 Nov 2025
12 Dec 2025
21 Nov 2025
11 Dec 2025
21 Nov 2025
21 Nov 2025 - 11 Dec 2025
Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area with all leads, lifts, sundries, T&P required for the work etc. complete as per the direction of Engineer-in-charge.
Earthwork excavation in all kind of soil including dressing and levelling the bed and depositing the excavted materials away from worksite with all leads, lifts, sundries, T&P required for the work etc. complete as directed by the Engineer-in-charge.
Filling in foundation and plinth with sand including cost, conveyance & royalty of all materials to the work site including watering & ramming with all leads, lifts, sundries & T&P etc . complete, as per direction of Engineer-in-Charge.
Cement concrete M-15 using 40 mm & down graded H.G.C.B. Chips free from weathered skin surface including cost, carriage royalty and taxes of all materials to the work site mixing and laying of concrete in position and compacted properly with all leads, lifts, sundries, T & P required for the work etc. complete as per the direction of the Engineer in charge.
Cement concrete M-20 with hard granite coarse aggregates of maximum nominal size 20mm and down graded free from weathered skin including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per the direction of Engineer-in-charge.
Rigid smooth centering & shuttering for cement concrete works including false work & dismantling after casting and clearing the debries from worksite with all leads,lifts, sundries including cost ,conveyance labour T&P etc. complete as directed by Engineer-in-charge .
Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification including cost, convenyance and royality of all materials to site, T&P sundries, etc. complete as per direction of Engineer- in- charge.
Filling in foundation and Plinth with excavated materials incluiding watering ,ramming etc. complete as per direction of Engineer in charge.
Excavation of any type of soil in approved borrow area by mechanical means loading into & transportation by mechanical means & unloading the soil with all lead on properly prepared surface including breaking clods to maximum 5cm to 7cm & laying in layers not exceeding 22.5 cm with all leads,lifts, sundries including cost , conveyance labour T&P etc. complete as directed by Engineer-in-charge.
Laying and fixing in position R.C.C. spun pipe with colar jointed with cement mortar 1:3 complete excluding cost of hume pipe and colar etc.complete as per direction of Engineer-in-charge.
R.C.C. work of M-25 down hard granite crusher broken chips incluinding cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per the direction of Engineer-in-charge.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.52 MB
DTCNBarkarley.pdf
Tender Documents • 7.46 MB
BOQ_566124.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid