Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.0 LAdmitted-Technical NO 10A 50 REDDY PALAYAM ATHIPATTU CHENNAI 600 120 | CHENNAI | CHENNAI | TAMIL NADU | 600120 | L1 | Admitted-Technical BQR SATISFIED | |
| 2 | L2₹18.0 L+₹1,309.80 (0.07%)Admitted-Technical | L2 | Admitted-Technical BQR SATISFIED | |
| 3 | L3₹18.9 L+₹94,783.50 (5.27%)Admitted-Technical | L3 | Admitted-Technical BQR SATISFIED | |
| 4 | L4₹20.4 L+₹2.4 L (13.6%)Admitted-Technical 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | PUDUKKOTTAI | TAMIL NADU | 621308 | L4 | Admitted-Technical BQR SATISFIED | |
| 5 | L5₹20.4 L+₹2.5 L (13.7%)Admitted-Technical | L5 | Admitted-Technical BQR SATISFIED |
| Sl No | Description | Qty | Unit | V P MUNIRAMAN L6 | S S AND CO L4 | K DHINAKARAN L8 | S and G CONSTRUCTION L3 | J SABARI L5 | K RAJARAM L1 | JD ENTERPRISES L7 | Dillibabu L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil and depositing on bank with initial lead of 10m and lift of 2m etc., complete. | 180 | Cum | 80 ₹14,400 | 60 ₹10,800 Lowest | 250 ₹45,000 | 100 ₹18,000 | 100 ₹18,000 | 70 ₹12,600 | 200 ₹36,000 | 100 ₹18,000 |
| 2.00 | Sand filling including cost of sand, filling charges, labour for watering and consolidation leads and lift etc., complete. | 11.5 | Cum | 500 ₹5,750 | 700 ₹8,050 | 1,250 ₹14,375 | 750 ₹8,625 | 400 ₹4,600 | 500 ₹5,750 | 100 ₹1,150 Lowest | 300 ₹3,450 |
| 3.00 | Plain cement concrete 1:3:6using 20mm HBG Stone without form work including cost of all materials lead and lift etc., complete. | 11.5 | Cum | 4,500 ₹51,750 | 4,000 ₹46,000 | 6,000 ₹69,000 | 4,500 ₹51,750 | 4,000 ₹46,000 | 4,500 ₹51,750 | 4,500 ₹51,750 | 3,000 ₹34,500 Lowest |
| 4.00 | R:C:C 1:1:5:3 using 12 to 20mm metal without form work for Raft including cost of all materials, curing, labour, lead, etc., complete. | 24 | Cum | 6,500 ₹1,56,000 | 5,000 ₹1,20,000 Lowest | 6,500 ₹1,56,000 | 6,000 ₹1,44,000 | 5,999 ₹1,43,976 | 6,000 ₹1,44,000 | 6,000 ₹1,44,000 | 5,000 ₹1,20,000 Lowest |
| 5.00 | RCC 1:1.5:3, with 20mm HBG m/c metal with form work for grade beam, RCC Column, RCC wall and including cost of all materials, all labour, lead, lift, form work, all T&P's etc. complete (But excluding the cost of steel reinforcement) | 44 | Cum | 8,000 ₹3,52,000 | 11,000 ₹4,84,000 | 6,500 ₹2,86,000 Lowest | 7,500 ₹3,30,000 | 6,999 ₹3,07,956 | 6,500 ₹2,86,000 Lowest | 12,000 ₹5,28,000 | 10,000 ₹4,40,000 |
| 6.00 | Supplying, fabricating and placing in position of steel reinforcements including cost of steel, binding wire, labour, lead, lift etc., complete. | 4.8 | MT | 50,000 ₹2,40,000 | 50,000 ₹2,40,000 | 42,000 ₹2,01,600 | 45,000 ₹2,16,000 | 55,000 ₹2,64,000 | 50,000 ₹2,40,000 | 30,000 ₹1,44,000 Lowest | 40,000 ₹1,92,000 |
| 7.00 | Fabrication & Assembling of template in position including the cost of materials labour, lead, lift, all T&P's etc complete and as directed by the engineer at site etc., complete. | 12 | Nos | 500 ₹6,000 | 300 ₹3,600 | 450 ₹5,400 | 1,000 ₹12,000 | 500 ₹6,000 | 200 ₹2,400 Lowest | 1,001 ₹12,012 | 500 ₹6,000 |
| 8.00 | Fabricating supply and fixing in position of 20/16 mm dia bolt & nut for equipment plinth 16 mm dia bolt of 0.75 m length. | 60 | Nos. | 500 ₹30,000 | 200 ₹12,000 | 450 ₹27,000 | 200 ₹12,000 | 150 ₹9,000 | 120 ₹7,200 Lowest | 500 ₹30,000 | 150 ₹9,000 |
| 9.00 | Providing grout holles for equipment structure including the cost of all materials form work labour all T&P, lead, lift etc., complete | 8 | Nos | 100 ₹800 | 100 ₹800 | 100 ₹800 | 50 ₹400 Lowest | 100 ₹800 | 100 ₹800 | 100.5 ₹804 | 50 ₹400 Lowest |
| 10.00 | Supply and Fixing of 90 lbs Rail section for Transformer Plinth to fixing in correct alignment and level including cost of all materials, labour, lead lift, all T&P's etc complete. and as directed by the engineer at site etc., complete. | 357 | Kg | 100 ₹35,700 | 70 ₹24,990 | 100 ₹35,700 | 100 ₹35,700 | 190 ₹67,830 | 70 ₹24,990 | 100 ₹35,700 | 60 ₹21,420 Lowest |
Tender Value
Refer Docs
EMD Value
₹20,200
Closing Date
19 Jan 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, GCC II ,230 KV CMRL GIS S
Superintending Engineer, GCC II ,230 KV CMRL GIS SS , Alandur, chennai 16.
As per NIT
2021_EB_190619_1
OT -46/2020-21 of SE/GCC-II/CNI -16.
Open Tender
Civil Works
Works
120 days
Tidel Park
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,200
Yes
27 Jan 2021
8 Jan 2021
20 Jan 2021
8 Jan 2021
19 Jan 2021
9 Jan 2021
90 days
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .