Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-AOC 36 151 E 25 PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 02 | SALEM | TAMIL NADU | 621011 | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.4 L+₹18,525 (2.01%)Rejected-Finance 19 M G WORKS S BLOCK NEAR PONDY ENGINEERS PONDICHERRY | PONDICHERRY | PUDUCHERRY | 605001 | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | TAM AND CO L1 | JS ENGINEERING WORKS L2 |
|---|---|---|---|---|---|
| 1.00 | Shifting and Commissioning of reconditioned Alfa Laval make MAB-206 oil Centrifuge in Main oil tank:
Charges for dismantling the oil centrifuge 'A' motor & pump, suction lines, discharge lines and its accessories, shifting the reconditioned centrifuge from repair bay to MOT area and placing the centrifuge, assembling the centrifuge motor, suction lines, discharge lines and its accessories all in sequence and checking the trial run including the cost of consumables, T&P charges. | 1 | No. | 54,000 ₹54,000 Lowest | 56,000 ₹56,000 |
| 2.00 | Inspection and Cleaning of TDBFP ‘A&B’ MOT & HP/LP Bypass oil tank:
Charges for cleaning of oil vapor stripper separator filter elements dismantling of both fan discharge NRVs outlet pipes unto stripper inlet flange by removing all the bolts and nuts on the NRVs, stripper, stripper flange and providing proper supports to the stripper, cleaning filter elements stripper internals, NRV flaps, bolts & nuts etc., reassembling NRVs with new ‘O’ rings, stripper top flange gasket in proper sequence. | 3 | Nos. | 37,100 ₹1,11,300 Lowest | 38,000 ₹1,14,000 |
| 3.00 | Overhauling of TDBFP A&B EOPs, and EH Oil Recirculation Pumps:
Charges for decoupling the motor from pump, Dismantling the coupling hub, Removing the pump from tank, Dismantling ,repairing, cleaning of internal parts, replacement of bearing and pin bush coupling bolts if necessary and reassembling of the pump including the cost of consumables and T&P’s.
(TDBFP – A&B EOPs – 2 Nos., EH oil R.C Pump - 2 Nos) | 4 | Nos. | 26,300 ₹1,05,200 Lowest | 27,500 ₹1,10,000 |
| 4.00 | Overhauling of Oil Vapour Extraction Fan:
Charges for overhauling of Oil Vapour Extraction Fan (OVEF) after Isolation of the fan, by removing the Inlet butterfly valve and inlet spool piece, dismantling the fan end cover ,impeller shaft center bolt ,radial bolts, axial bolt, removing the shaft key and impeller, cleaning the fan internals, impeller, casing and end cover etc.., check the conditions of impeller bush clearance, repair/replacement of damaged components, replacing of fanned cover gasket and reassembling of all the parts in the correct sequence. | 4 | Nos. | 33,600 ₹1,34,400 Lowest | 34,500 ₹1,38,000 |
| 5.00 | Cleaning of oil vapour stripper separator filter elements in Main Turbine Lube oil
system:
Charges for cleaning of oil vapor stripper separator filter elements dismantling of both fan discharge NRVs outlet pipes unto stripper inlet flange by removing all the bolts and nuts on the NRVs, stripper, stripper flange and providing proper supports to the stripper, cleaning filter elements stripper internals, NRV flaps, bolts & nuts etc., reassembling NRVs with new ‘O’ rings, stripper top flange gasket in proper sequence. | 1 | No. | 13,050 ₹13,050 Lowest | 13,500 ₹13,500 |
| 6.00 | Inspection of various equipments by opening of manhole doors:
Charges for Opening of various manhole doors, Inspection & cleaning inside the equipment, removing existing gasket, cleaning the studs & seating area, cutting new gasket as per requirement, fixing the gasket and closing the manhole doors properly as per the direction of engineer in charge. | 11 | Nos. | 6,425 ₹70,675 Lowest | 6,500 ₹71,500 |
| 7.00 | a.Inspection, renewal of worn out parts and overhauling of BFP's voith hydraulic coupling:
Decoupling the Voith from pump and motor – drain the oil- removing the AOP motor and unbolt the actuator and cam control from machine – opening the top cover – Removal of the input shaft, primary & secondary wheel assembly, AOP &main oil pump – disassemble the primary & secondary wheel assembly parts, main oil pump parts and AOP pump parts –complete cleaning and inspection of all parts & bearings –renewal of worn out parts / bearings if any- cleaning the oil sump. | 1 | No. | 2,21,500 ₹2,21,500 Lowest | 2,23,000 ₹2,23,000 |
| 8.00 | b. Overhauling and reassembling of AOP & main oil pump, input shaft and primary & secondary wheel assembly in the Voith – set the secondary wheel float – overhauling and reassembling of control valve and scoop tube assembly -checking all the thrust and journal bearings, correct the oil clearances and interference – closing the top cover and tightening- checking the manual scoop operation – centrifuging the drained oil and top up , starting of AOP and checking the oil flow to all bearings the oil sump. | 1 | No. | 1,78,500 ₹1,78,500 Lowest | 1,80,000 ₹1,80,000 |
| 9.00 | c.Aligning the Boiler feed pump motor with Voith coupling –Couple the motor with Hydraulic (Voith) coupling providing coupling guard – charging and commissioning:
Alignment of MDFBFP motor with Voith make hydraulic coupling | 1 | No | 21,500 ₹21,500 Lowest | 22,000 ₹22,000 |
| 10.00 | d.Aligning the Boiler feed pump with Voith coupling – couple the pump – providing coupling guard – charging and commissioning the BFP:
Alignment of BFP with hydraulic coupling | 1 | No | 11,350 ₹11,350 Lowest | 12,000 ₹12,000 |
Tender Value
Refer Docs
EMD Value
₹11,000
Closing Date
18 Aug 2025, 2:00 pmClosed
CE / MTPS - II
O/o CE / MTPS - II
TGMCA Division Shifting and Commissioning of reconditioned Alfa Laval make MAB206 oil Centrifuge in Main oil tank Inspection and Cleaning of TDBFP ABHP LP Bypass Oil Tank Overhauling of MDBFP Hydraulic VOITH Coupling Overhauling of
2025_EB_587793_1
OT 46/25-26
Open Tender
Maintenance Works
Works
30 days
SEESMTPSII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹11,000
Yes
12 Nov 2025
1 Aug 2025
19 Aug 2025
1 Aug 2025
18 Aug 2025
1 Aug 2025
Amount
Shifting and Commissioning of reconditioned Alfa Laval make MAB-206 oil Centrifuge in Main oil tank: Charges for dismantling the oil centrifuge 'A' motor & pump, suction lines, discharge lines and its accessories, shifting the reconditioned centrifuge from repair bay to MOT area and placing the centrifuge, assembling the centrifuge motor, suction lines, discharge lines and its accessories all in sequence and checking the trial run including the cost of consumables, T&P charges.
Inspection and Cleaning of TDBFP ‘A&B’ MOT & HP/LP Bypass oil tank: Charges for cleaning of oil vapor stripper separator filter elements dismantling of both fan discharge NRVs outlet pipes unto stripper inlet flange by removing all the bolts and nuts on the NRVs, stripper, stripper flange and providing proper supports to the stripper, cleaning filter elements stripper internals, NRV flaps, bolts & nuts etc., reassembling NRVs with new ‘O’ rings, stripper top flange gasket in proper sequence.
Overhauling of TDBFP A&B EOPs, and EH Oil Recirculation Pumps: Charges for decoupling the motor from pump, Dismantling the coupling hub, Removing the pump from tank, Dismantling ,repairing, cleaning of internal parts, replacement of bearing and pin bush coupling bolts if necessary and reassembling of the pump including the cost of consumables and T&P’s. (TDBFP – A&B EOPs – 2 Nos., EH oil R.C Pump - 2 Nos)
Overhauling of Oil Vapour Extraction Fan: Charges for overhauling of Oil Vapour Extraction Fan (OVEF) after Isolation of the fan, by removing the Inlet butterfly valve and inlet spool piece, dismantling the fan end cover ,impeller shaft center bolt ,radial bolts, axial bolt, removing the shaft key and impeller, cleaning the fan internals, impeller, casing and end cover etc.., check the conditions of impeller bush clearance, repair/replacement of damaged components, replacing of fanned cover gasket and reassembling of all the parts in the correct sequence.
Cleaning of oil vapour stripper separator filter elements in Main Turbine Lube oil system: Charges for cleaning of oil vapor stripper separator filter elements dismantling of both fan discharge NRVs outlet pipes unto stripper inlet flange by removing all the bolts and nuts on the NRVs, stripper, stripper flange and providing proper supports to the stripper, cleaning filter elements stripper internals, NRV flaps, bolts & nuts etc., reassembling NRVs with new ‘O’ rings, stripper top flange gasket in proper sequence.
Inspection of various equipments by opening of manhole doors: Charges for Opening of various manhole doors, Inspection & cleaning inside the equipment, removing existing gasket, cleaning the studs & seating area, cutting new gasket as per requirement, fixing the gasket and closing the manhole doors properly as per the direction of engineer in charge.
a.Inspection, renewal of worn out parts and overhauling of BFP's voith hydraulic coupling: Decoupling the Voith from pump and motor – drain the oil- removing the AOP motor and unbolt the actuator and cam control from machine – opening the top cover – Removal of the input shaft, primary & secondary wheel assembly, AOP &main oil pump – disassemble the primary & secondary wheel assembly parts, main oil pump parts and AOP pump parts –complete cleaning and inspection of all parts & bearings –renewal of worn out parts / bearings if any- cleaning the oil sump.
b. Overhauling and reassembling of AOP & main oil pump, input shaft and primary & secondary wheel assembly in the Voith – set the secondary wheel float – overhauling and reassembling of control valve and scoop tube assembly -checking all the thrust and journal bearings, correct the oil clearances and interference – closing the top cover and tightening- checking the manual scoop operation – centrifuging the drained oil and top up , starting of AOP and checking the oil flow to all bearings the oil sump.
c.Aligning the Boiler feed pump motor with Voith coupling –Couple the motor with Hydraulic (Voith) coupling providing coupling guard – charging and commissioning: Alignment of MDFBFP motor with Voith make hydraulic coupling
d.Aligning the Boiler feed pump with Voith coupling – couple the pump – providing coupling guard – charging and commissioning the BFP: Alignment of BFP with hydraulic coupling
JS ENGINEERING WORKS (BID ID -1428279)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .