Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 494A RAILWAY COLONY 829104 KARGALI BERMO BOKARO JHARKHAND 829104 INDIA | BOKARO | JHARKHAND | 829104 | Accepted-Technical All documents Uploaded |
| 2 | Accepted-Technical | Accepted-Technical All documents Uploaded |
| 3 | Accepted-Technical CHURK SONEBHADRA U P | SONBHADRA | UTTAR PRADESH | 231206 | Accepted-Technical All documents Uploaded |
| 4 | Accepted-Technical GRAM DERE RRAJA POST PANAPUR TEHSIL GAUSPUR DISTRICT BARABANKI UTTAR PRADESH | GAUSPUR | BARABANKI | UTTAR PRADESH | Accepted-Technical All documents Uploaded |
| 5 | Accepted-Technical GRAM BHARATPUR UGAPUR ORAI JANPAD BHADOHI | Accepted-Technical All documents Uploaded |
Tender Value
Refer Docs
EMD Value
₹2.8 L
Closing Date
25 Sept 2026, 2:30 pmClosed
SE IWC MIRZAPUR
SE IWC IRRIGATION COLONY FATHA MIRZAPUR
Reconstruction of VRB At km 37.400 of Ghaghar Main Canal
2026_UPIDC_1186919_1
04/SE/2026-27
Open Tender
Civil Works
Item Wise
270 days
Robertsganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹2.8 L
9 Oct 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling stone work in lime or cement mortar including stacking of materials as directed by Engineer-in-charge within a distance of 60 M. | 31.24 | Cum. | - | - |
| 2 | E/W in Excavation of Foundation in ordinary soil/sandy loam, clay or sand,soil mixed with boulder/set slush in canal section including lift upto 1.5 m. & lead upto 30 m with disposal of surplus earth as directed by Engg-in-charge. | 3,048.55 | Cum. | - | - |
| 3 | Preparation of subgrade for lining work excuding cost of earth work including cost of all material, labour, T&P, etc. required for proper completion of work. | 2,915 | Sqm. | - | - |
| 4 | P/L Local sand in foundation including cost of all material, labour, T&P, etc required for proper completion of work. | 229.9 | Cum. | - | - |
| 5 | Laying C.C. (1:3:6) in foundation with cement, coarse sand and hard stone ballast including cost of all material, labour, T&P, etc. required for proper completion of work. | 514.37 | Cum. | - | - |
| 6 | Centring and shuttering for R.C.C work including cost of all material, labour, T&P, etc. required for proper completion of work. | 740.18 | Sqm. | - | - |
| 7 | Shuttering work for cement concrete including cost of all material, labour, T&P, fixing and removal etc. required for proper completion of work. | 124.68 | Sqm. | - | - |
| 8 | Laying RCC M25 (1:1:2 ) for raft, slab Abutment &Peir work with cement, coarse sand FM not less than 2.0 and hard stone grit 4.75 to 20 mm including cost of all material, labour, T&P, etc. required for proper completion of work. | 376.12 | Cum. | - | - |
| 9 | Bending, Binding ,Cutting & placing of reinforcement including cost of all material, labour, T&P, etc., required for proper completion of work. | 27.19 | MT | - | - |
| 10 | Laying RCC M20 (1:1.5:3 ) for wing wall , with cement, coarse sand FM not less than 2.0 and hard stone grit 4.75 to 20 mm including cost of all material, labour, T&P, etc. required for proper completion of work. | 97.14 | Cum. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.91 MB
TDLNIT04LOT01.pdf
Tender Documents • 1.63 MB
BOQ_2234510.xls
BOQ • 0.35 MB
corrigendumNIT04Termsandcondition.pdf
PDF • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .