Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance GRAM DERE RRAJA POST PANAPUR TEHSIL GAUSPUR DISTRICT BARABANKI UTTAR PRADESH | GAUSPUR | BARABANKI | UTTAR PRADESH | L1 | Accepted-Finance Due to L1 | |
| 2 | L2₹1.1 Cr+₹7.9 L (7.47%)Rejected-Finance 494A RAILWAY COLONY 829104 KARGALI BERMO BOKARO JHARKHAND 829104 INDIA | BOKARO | JHARKHAND | 829104 | L2 | Rejected-Finance Due to L2 | |
| 3 | L3₹1.2 Cr+₹9.3 L (8.73%)Rejected-Finance | L3 | Rejected-Finance Due to L3 | |
| 4 | L4₹1.2 Cr+₹11.4 L (10.7%)Rejected-Finance GRAM BHARATPUR UGAPUR ORAI JANPAD BHADOHI | L4 | Rejected-Finance Due to L4 | |
| 5 | L5₹1.2 Cr+₹15.7 L (14.8%)Rejected-Finance CHURK SONEBHADRA U P | SONBHADRA | UTTAR PRADESH | 231206 | L5 | Rejected-Finance Due to L5 |
| Sl No | Description | Qty | Unit | Maa Mundheshwari Construction L5 | M/S DHRUWA KUMAR SINGH L3 | ANIL KUMAR SINGH L2 | MAMTA SHARMA CONTRACTOR CO BARABANKI L1 | VIRAT BANDHU CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling stone work in lime or cement mortar including stacking of materials as directed by Engineer-in-charge within a distance of 60 M. | 31.24 | Cum. | 298.39 ₹9,321.7 | 276 ₹8,622.24 | 303.6 ₹9,484.46 | 219 ₹6,841.56 Lowest | 288.08 ₹8,999.62 |
| 2.00 | E/W in Excavation of Foundation in ordinary soil/sandy loam, clay or sand,soil mixed with boulder/set slush in canal section including lift upto 1.5 m. & lead upto 30 m with disposal of surplus earth as directed by Engg-in-charge. | 3,048.55 | Cum. | 82.17 ₹2,50,499.35 | 75 ₹2,28,641.25 | 68.4 ₹2,08,520.82 Lowest | 69.9 ₹2,13,093.65 | 79.33 ₹2,41,841.47 |
| 3.00 | Preparation of subgrade for lining work excuding cost of earth work including cost of all material, labour, T&P, etc. required for proper completion of work. | 2,915 | Sqm. | 10.64 ₹31,015.6 | 9 ₹26,235 Lowest | 10.82 ₹31,540.3 | 9 ₹26,235 Lowest | 10.27 ₹29,937.05 |
| 4.00 | P/L Local sand in foundation including cost of all material, labour, T&P, etc required for proper completion of work. | 229.9 | Cum. | 1,408.58 ₹3,23,832.54 | 1,318 ₹3,03,008.2 | 1,172.59 ₹2,69,578.44 Lowest | 1,290 ₹2,96,571 | 1,359.38 ₹3,12,521.46 |
| 5.00 | Laying C.C. (1:3:6) in foundation with cement, coarse sand and hard stone ballast including cost of all material, labour, T&P, etc. required for proper completion of work. | 514.37 | Cum. | 3,997.74 ₹20,56,317.52 | 3,599 ₹18,51,217.63 Lowest | 3,882.65 ₹19,97,118.68 | 3,682 ₹18,93,910.34 | 3,863.71 ₹19,87,376.51 |
| 6.00 | Centring and shuttering for R.C.C work including cost of all material, labour, T&P, etc. required for proper completion of work. | 740.18 | Sqm. | 602.84 ₹4,46,210.11 | 557 ₹4,12,280.26 | 543.66 ₹4,02,406.26 | 499 ₹3,69,349.82 Lowest | 581.99 ₹4,30,777.36 |
| 7.00 | Shuttering work for cement concrete including cost of all material, labour, T&P, fixing and removal etc. required for proper completion of work. | 124.68 | Sqm. | 194.6 ₹24,262.73 | 182 ₹22,691.76 | 193.5 ₹24,125.58 | 179 ₹22,317.72 Lowest | 187.87 ₹23,423.63 |
| 8.00 | Laying RCC M25 (1:1:2 ) for raft, slab Abutment &Peir work with cement, coarse sand FM not less than 2.0 and hard stone grit 4.75 to 20 mm including cost of all material, labour, T&P, etc. required for proper completion of work. | 376.12 | Cum. | 7,144.89 ₹26,87,336.03 | 6,608 ₹24,85,400.96 | 6,773.97 ₹25,47,825.6 | 6,290 ₹23,65,794.8 Lowest | 6,897.88 ₹25,94,430.63 |
| 9.00 | Bending, Binding ,Cutting & placing of reinforcement including cost of all material, labour, T&P, etc., required for proper completion of work. | 27.19 | MT | 78,677.36 ₹21,39,237.42 | 72,101 ₹19,60,426.19 Lowest | 72,773.6 ₹19,78,714.18 | 79,900 ₹21,72,481 | 75,957 ₹20,65,270.83 |
| 10.00 | Laying RCC M20 (1:1.5:3 ) for wing wall , with cement, coarse sand FM not less than 2.0 and hard stone grit 4.75 to 20 mm including cost of all material, labour, T&P, etc. required for proper completion of work. | 97.14 | Cum. | 6,228.66 ₹6,05,052.03 | 5,832 ₹5,66,520.48 | 5,545.23 ₹5,38,663.64 Lowest | 5,990 ₹5,81,868.6 | 6,013 ₹5,84,102.82 |
Tender Value
Refer Docs
EMD Value
₹2.8 L
Closing Date
25 Sept 2026, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE IWC MIRZAPUR
SE IWC IRRIGATION COLONY FATHA MIRZAPUR
Reconstruction of VRB At km 37.400 of Ghaghar Main Canal
2026_UPIDC_1186919_1
04/SE/2026-27
Open Tender
Civil Works
Item Wise
270 days
Robertsganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹2.8 L
28 Oct 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling stone work in lime or cement mortar including stacking of materials as directed by Engineer-in-charge within a distance of 60 M. | 31.24 | Cum. | - | - |
| 2 | E/W in Excavation of Foundation in ordinary soil/sandy loam, clay or sand,soil mixed with boulder/set slush in canal section including lift upto 1.5 m. & lead upto 30 m with disposal of surplus earth as directed by Engg-in-charge. | 3,048.55 | Cum. | - | - |
| 3 | Preparation of subgrade for lining work excuding cost of earth work including cost of all material, labour, T&P, etc. required for proper completion of work. | 2,915 | Sqm. | - | - |
| 4 | P/L Local sand in foundation including cost of all material, labour, T&P, etc required for proper completion of work. | 229.9 | Cum. | - | - |
| 5 | Laying C.C. (1:3:6) in foundation with cement, coarse sand and hard stone ballast including cost of all material, labour, T&P, etc. required for proper completion of work. | 514.37 | Cum. | - | - |
| 6 | Centring and shuttering for R.C.C work including cost of all material, labour, T&P, etc. required for proper completion of work. | 740.18 | Sqm. | - | - |
| 7 | Shuttering work for cement concrete including cost of all material, labour, T&P, fixing and removal etc. required for proper completion of work. | 124.68 | Sqm. | - | - |
| 8 | Laying RCC M25 (1:1:2 ) for raft, slab Abutment &Peir work with cement, coarse sand FM not less than 2.0 and hard stone grit 4.75 to 20 mm including cost of all material, labour, T&P, etc. required for proper completion of work. | 376.12 | Cum. | - | - |
| 9 | Bending, Binding ,Cutting & placing of reinforcement including cost of all material, labour, T&P, etc., required for proper completion of work. | 27.19 | MT | - | - |
| 10 | Laying RCC M20 (1:1.5:3 ) for wing wall , with cement, coarse sand FM not less than 2.0 and hard stone grit 4.75 to 20 mm including cost of all material, labour, T&P, etc. required for proper completion of work. | 97.14 | Cum. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.91 MB
TDLNIT04LOT01.pdf
Tender Documents • 1.63 MB
BOQ_2234510.xls
BOQ • 0.35 MB
corrigendumNIT04Termsandcondition.pdf
PDF • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .