Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.8 L
EMD Value
₹8,800
Closing Date
6 Apr 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD complex Budgam
Construction of Protection bund from house of Mohammad Yousuf Dar to house of Hassan Parra and others at Mahwara
2026_RDPR_306975_2
NIT_160_REW_Budgam
Open Tender
Civil Works
Percentage
30 days
Budgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Yes
Executive Engineer REW Budgam
₹8,800
7 Apr 2026
30 Mar 2026
7 Apr 2026
30 Mar 2026
6 Apr 2026
30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth,1 m in width as well as 10 m 2 on plan) including disposal of excavated earth lead upto 1 meters and lift upto 1.5 m | - | Cum | - | - |
| 0_) | Providing and laying charges for laying of stone solling duly hand packed in trenches including carriage | - | Cum | - | - |
| 0_) | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form for Retaining walls etc. | - | Sqm | - | - |
| 0_) | 12 mm thick cement mortar pluster in 1:6 mix | - | Sqm | - | - |
| 0_) | Carraige of by mechanical transport from source to site i/c loading unloading, taxes royalties etc: Stone Agg. for an average lead of 20 Km | 16.89 | Cum | - | - |
| 0_) | Carraige of by mechanical transport from source to site i/c loading unloading, taxes royalties etc:Sand Agg. for an average lead of 10 Km | 8.45 | Cum | - | - |
| 0_) | Add cost of sign board photography,clearence of site BWO removal of roots of trees and carriage of cement and other unforeseen items | - | job | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_996265.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .