Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAdmitted-Finance 7TH FLOOR FLAT NO 02 UNITY ENCLAVE BLOCK C MEDAVAKKAM ROAD MAMBAKKAM 600 127 | CHENGALPATTU | TAMIL NADU | 600127 | L1 | Admitted-Finance | |
| 2 | L2₹9.3 L+₹84,252 (10.0%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AGARTHI ENTERPRISES L1 | R.SATHIYANESAN L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the AC Screw compressor with oil separator, discharge valve, NRV, pressure sensors, temperature transducer assembly inspection of internal parts, checking the clearance in the gear assembly, operation checking of loading and unloading piston with Air pressure, renewal of Loading seals if necessary and cleaning of loading and unloading ports and all internals parts and cleaning by the use of Cleaning agent.Including cost of consumables and T & P's. | 4 | Nos | 1,39,302 ₹5,57,208 Lowest | 1,53,233 ₹6,12,932 |
| 2.00 | Final inspecton of the loading and unloading valves, outer casing cover assembly ensuring free rotation of gears,then assembled with oil separator checking the required clearance and checking the free rotation of total assembly. Assemply of discharge valve, NRV, loading and unloading valve with coil if nessary new casket to be provided. Including cost of consumables and T & P's. | 4 | Nos | 71,327 ₹2,85,308 Lowest | 78,459 ₹3,13,836 |
Tender Value
Refer Docs
EMD Value
₹8,500
Closing Date
24 Sept 2026, 2:00 pmClosed
Chief Engineer
Chief Engineer NCTPS II Ch-120
Overhauling of loading and unloading
2026_EB_703358_1
CE NCTPS II SE M II O M 04 26 27
Open Tender
Miscellaneous Works
Works
30 days
SE M II NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,500
Yes
28 Sept 2026
10 Sept 2026
25 Sept 2026
10 Sept 2026
24 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the AC Screw compressor with oil separator, discharge valve, NRV, pressure sensors, temperature transducer assembly inspection of internal parts, checking the clearance in the gear assembly, operation checking of loading and unloading piston with Air pressure, renewal of Loading seals if necessary and cleaning of loading and unloading ports and all internals parts and cleaning by the use of Cleaning agent.Including cost of consumables and T & P's. | 4 | Nos | - | - |
| 2 | Final inspecton of the loading and unloading valves, outer casing cover assembly ensuring free rotation of gears,then assembled with oil separator checking the required clearance and checking the free rotation of total assembly. Assemply of discharge valve, NRV, loading and unloading valve with coil if nessary new casket to be provided. Including cost of consumables and T & P's. | 4 | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_845443.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .