Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
₹3 L
Closing Date
30 Jun 2021, 3:00 pmClosed
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Construction of Water Tank at Copra in Pyt. Mahore-A Block Mahore, District Reasi (2nd Call
2021_RDPR_126925_1
e-NIT No. 28 REW REASI of 2021 Dated 10-06-2021
Open Tender
Civil Works
Item Rate
60 days
Mahore-A
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI
Exempted
8 Jul 2021
11 Jun 2021
30 Jun 2021
11 Jun 2021
30 Jun 2021
11 Jun 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : Including all leads, lift and carriage complete
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: Ordinary Rock : Including all leads, lift and carriage complete
Providing and laying in position cement concrete 1 Cement: 5 fine sand: 10 graded stone aggregate 40 mm nominal sizeexcluding the cost of centering and shuttering - All work up to plinth level
Providing and laying in position cement concrete in 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centering and shuttering - All work up to plinth level
Providing and laying in position specified grade of reinforced cement concrete 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . Including all leads, lift and carriage complete
12 mm cement plaster of mix : 1:4 ( 1 cement : 4 fine sand ) Including all leads, lift and carriage complete
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form work for ; Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form work for; Suspended floors, roofs, landings, balconies and access platforms.
Centering and shuttering including strutting, propping etc. and removal of form work for; Edges of slabs and breaks in floors and walls Under 20 cm wide
ROBINA BANO
MOHD SHERIF
Rayaiz Ahmed
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .