| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-Finance | L1 | Accepted-Finance The bidder is L1 | |
| 2 | L2₹10.0 L+₹760.64 (0.08%)Rejected-Finance | L2 | Rejected-Finance The bidder is L2 | |
| 3 | L3₹10.0 L+₹761.04 (0.08%)Rejected-Finance | L3 | Rejected-Finance The bidder is L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical As per the recommendation of works committee the bidder is technically disqualified. |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
7 Jan 2025, 1:00 pmClosed
Director ICAR RCER Patna
ICAR Parisar ICAR-RCER P.O. Bihar Veterinary College, Patna- 800014
Construction of Mist Chamber at FSRCHPR, Ranchi
2024_DARE_841181_1
RC-Ranchi/23-24/Pur-102/ Const. of Coal/ C-349101
Open Tender
Civil Works - Others
Works
30 days
Plandu
Please refer Tender documents.
12 documents required · 12 mandatory
₹1,000
Yes
ICAR Unit ICAR-RCER Patna
₹20,000
Yes
7 Mar 2025
24 Dec 2024
8 Jan 2025
24 Dec 2024
7 Jan 2025
24 Dec 2024
Amount
Sub Heading 1
Surface dressing of ground include removle of Vegetation and inequalities not exceeding 15cm depth and disposal of rubbish, lead upto 50m and lift upto1.5m. Total Area = (15mx16m)+(2.9x3.2) = 9.28m2.
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil Total=(3’x2’x2’)x18no.s+(47.7+71+5.4+3)x0.61x.61=53.4cum=
Providing and laying in position specified grade of reinforced concrete, excluding the cost of centring,shuttering, finishing,and reinforcement –al l work upto plinth level 1:2:4 (1 cement: 2 coarse sand(zone-III)derived from natural source :4 graded stone aggregate 20mm nominal size derived from natural source) Base =2.57cum Tie beam=2.56 cum Column=0.88 Total=6.01cum
Reinforced cement concrete M20 work in wall columns etc up to floor five level excluding reinforcement ,shuttering ,all complete job Gr.floor column=0.59cum Total =0.59cum
Reinforcement( TMT C-500) for RCC works including straitening,cutting, bending,binding,placing in position 6.6m³x100kg/cum=~660kg-=660kg
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, Column=23.21sqmsqm Tie beam=47.13sqm Total=70.34sqm
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. Total =(0.3mx16mx15m)+(8’x10’x1’)= 79.43cum
Brick work with common burnt clay F.P.S modular brick of class designation 7.5 in foundation and plinth in:Cement mortar 1:4(1 cement : 4 sand ) =36.76cum+.84cum=
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1:4 (1 cement :4 coarse sand) Total=2x(16m+15m)+2x(2.9+3.2)x0.9-5.4=61.38 sqm.
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.40 mm thick with 20 mm nominal size stone aggregate. Total Area =0.69sqm+240sqm+7.43=248.12sqm
12 mm cement plaster of mix 1:6 (1 cement: 6 fine sand) Total=2(15+16)+2(2.9+3.2)x0..9-5.4sqm+6.7sqm=68.08
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes Totalweight=123.98kg+427.78kg+161.88kg=713.64kg
Providing, supplying and fixing clear 6mm polycarbonated glazing,flashing sheet. Total=2(15+16)x2.1m+((7.65+.3)x2)x16.6= 394.14sqm
Goods and Service Tax @ 18%
Jitu Kumar (BID ID -3149523)
Bharat Ratan Pandey (BID ID -3149490)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .