Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.8 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹22.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹22.8 LAdmitted-Fee/PreQual/Technical/Finance AT WARD NO 8 KANTABANJI PO KANTABANJI NAC DIST BALANGIR PIN 767039 | BALANGIR | ODISHA | 767039 | -0.10% | ₹22.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹23.3 LAdmitted-Fee/PreQual/Technical/Finance | +2.00% | ₹23.3 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹22.9 L
EMD Value
₹22,859
Closing Date
9 Jun 2026, 5:00 pmClosed
BDO Titilagarh
BLOCK OFFICE TITLAGARH
CIVIL WORKS
2026_PRBTL_129703_1
04/GPLF/2026-27/Titilagarh
Open Tender
Civil Works - Buildings
Percentage
180 days
MANIGAON
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
BDO TITILAGARH
₹22,859
Yes
16 Jun 2026
26 May 2026
10 Jun 2026
28 May 2026
9 Jun 2026
28 May 2026
28 May 2026 - 31 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of hard soil within initial lead and lift including rough dressing and levelling the bed for foundation etc complete. | - | cum | 1 | - |
| 2Sand filling in foundation and plinth including watering and hand ramming etc all complete. | |||||
| 3 | P.C.C. (1:3:6) using 40 mm size hbg metal including all cost, conveyance, royalty etc all complete. | 1 | cum | - | - |
| 4 | Brick work with FLY ASH bricks having crushing strength between 35 kg/cm² to 149 kg/cm² in Cement Mortar (1:6) in foundation and plinth, including cost, carriage and royalty, etc., complete. | 1 | cum | 1 | ₹1 |
| 5 | Brick work with FLY ASH bricks having crushing strength between 35 kg/cm² to 149 kg/cm² in Cement Mortar (1:6) in superstructure, including cost, carriage and royalty, etc., complete. | - | cum | 1 | - |
| 6 | R.C.C M20 using 20mm and down graded hard graint crusher broken chips, etc. | - | cum | 1 | - |
| 7.1 | Rigid and smooth centering and shuttering for R.C.C. work including false works and dismantling after casting – Foundation & Plinth Beam | - | sqm | - | - |
| 7.2 | Rigid and smooth centering and shuttering for R.C.C. work including false works and dismantling after casting – Lintel. | 1 | sqm | 1 | ₹1 |
| 7.3 | Rigid and smooth centering and shuttering for R.C.C. work including false works and dismantling after casting – Beams & Columns | 1 | sqm | 1 | ₹1 |
| 7.4 | Rigid and smooth centering and shuttering for R.C.C. work including false works and dismantling after casting – Slab & Chajja | - | sqm | 1 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
DTCN9.pdf
Tender Documents • 2.11 MB
BOQ_592362.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].