Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAccepted-Finance | ₹3.3 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹3.4 Cr+₹10.0 L (3.00%)Accepted-Finance 208 L MODEL TOWN LUDHIANA | LUDHIANA | LUDHIANA | PUNJAB | ₹3.4 Cr+₹10.0 L (3.00%) | L2 | Accepted-Finance Accepted |
Tender Value
Refer Docs
EMD Value
₹6.8 L
Closing Date
25 Mar 2026, 1:00 pmClosed
Executive Engineer
Executive Engineer Const Divn PWD B and R, near old sabji Mandi Barnala
Construction of 03 Permanent Courtrooms on the4th Floor in Judicial Court Complex District Barnala
2026_CEPW_163205_1
Bid 36 Dated 10.03.2026 (Construction of 03 Permanent Courtrooms on the 4th Floor in JCC BNL
Open Tender
Civil Works - Buildings
Percentage
240 days
Barnala
please Refer Tender Documents
10 documents required · 10 mandatory
₹20,000
₹6.8 L
Yes
16 Apr 2026
11 Mar 2026
25 Mar 2026
11 Mar 2026
25 Mar 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS | - | - | - | - |
| 2 | Construction of Main Buildings 4th Floor | - | - | - | - |
| 3 | Reinforced cement concrete M-25 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in supersturcture. | 418.47 | Cum | 7,206.73 | ₹30,15,800.3 |
| 4 | Extra Rate For Fourth Floor | 392.25 | Cum | 762.73 | ₹2,99,180.84 |
| 5 | Extra Rate For Fifth Floor | 26.22 | Cum | 953.42 | ₹24,998.67 |
| 6 | Extra for using computerised concrete batch mixing plant including carriage by transit mixer within 1 km lead (note: where concrete mixer is already included in the rate the same shall be deducted ) | 418.47 | Cum | 358.19 | ₹1,49,891.77 |
| 7 | Extra for pumping charges of Batch Mix Concrete / Ready mix conrete work (RMC) | 418.47 | Cum | 92.71 | ₹38,796.35 |
| 8 | Extra rate for enhancement in pumping power, addition of pipe length, scaffolding for handling the pipe arrangement for pumping of concrete in subsequent storey above the below storey up to height of 4 meters or part there of up to the roof top level of that storey | - | - | - | - |
| 9 | Fourth Floor | 392.25 | Cum | 92.71 | ₹36,365.5 |
| 10 | Fifth Floor | 26.22 | Cum | 115.89 | ₹3,038.64 |
stage.html
html • 0.04 MB
technical_330645.pdf
techsummary_330645.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
SBD.pdf
Tender Documents • 26.58 MB
cond.pdf
Additional Documents • 16.65 MB
BOQ_330645.xls
BOQ • 0.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .