| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-AOC SAROJA CONTRACTOR SENJI TAMIL NADU TN | ₹20.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹20.0 LRejected-AOC KRISHNAGIRI | TAMIL NADU | 635001 | ₹20.0 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | R RAJENDIRAN L2 | Saroja L1 |
|---|---|---|---|---|---|
| 1.00Reneval BT Road Athiyur Ananthapuram road to Melarungunam road 0/0-1/320 | |||||
| 1.01Clearing the scrub jungles including all labour charges for all labour charges etc complete. | |||||
| 1.02 | Km 0/0 - 0/1320 | 939.6 | m2 | 6.36 ₹5,975.86 | 6.36 ₹5,975.86 |
| 1.03Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal | |||||
| 1.04 | Km 0/0 - 0/1320 | 10.11 | m2 | 4,454.8 ₹45,038.03 | 4,454.8 ₹45,038.03 |
| 1.05Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | |||||
| 1.06 | Km 0/0 - 0/1320 | 4,893.75 | m2 | 34.36 ₹1.7 L | 34.36 ₹1.7 L |
| 1.07BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | |||||
| 1.08 | Km 0/0 - 0/1320 | 122.34 | m3 | 12,010 ₹14.7 L | 11,994 ₹14.7 L |
| 1.09 | Provision for KM stone of size | 1 | Nos | 2,197 ₹2,197 | 2,197 ₹2,197 |
Tender Value
₹20.2 L
EMD Value
₹20,190
Closing Date
5 Feb 2026, 3:00 pmClosed
BDO BP
Block Development Office, Gingee
Reneval BT Road Athiyur Ananthapuram road to Melarungunam road 0/0-1/320 at Athiyur
2026_RDTN_649000_2
Gingee RRM SFC GRANT 202526 (Pack1)
Open Tender
Civil Works
60 days
Gingee
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,190
Yes
1 Mar 2026
30 Jan 2026
5 Feb 2026
30 Jan 2026
5 Feb 2026
30 Jan 2026
Reneval BT Road Athiyur Ananthapuram road to Melarungunam road 0/0-1/320
Clearing the scrub jungles including all labour charges for all labour charges etc complete.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for KM stone of size
Provision for HM stone of size 73x23x10cm
Provision for Citizen board cum name board charges
Provision for photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_778114.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid