Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.5 LAccepted-Finance | ₹32.5 L | L1 | Accepted-Finance ok |
| 2 | L2₹39.4 L+₹6.9 L (21.1%)Accepted-Finance | ₹39.4 L+₹6.9 L (21.1%) | L2 | Accepted-Finance ok |
Tender Value
₹31.6 L
EMD Value
₹63,180
Closing Date
16 Sept 2026, 6:00 pmClosed
XEN GANGNAHAR OFD DIV-6 CAD SURATGARH
XEN GANGNAHAR OFD DIV-6 CAD SURATGARH
CONSTRUCTION OF LINED WATER COURSE IN CHAK 9 PTP (Balance Work BSR 2024 Risk AND Cost)
2026_CECAD_595495_1
NIT NO 02/2026-27
Open Tender
Civil Works
Percentage
180 days
CHAK 9 PTP
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
XEN GANGNAHAR OFD DIV-6 CAD SURATGARH/MD RISL
₹63,180
Yes
17 Sept 2026
7 Sept 2026
17 Sept 2026
7 Sept 2026
16 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work
(a) Earth work for water courses in ordinary soil with all leads and lifts, dressed as per specification. | 2,083.07 | Per 10 Cum. | 313 | ₹6,52,000.91 |
| 2 | (b) Ramming of Earth work in ordinary soils in layers by wooden or iron rammers as per specification. | 1,781.44 | Per 10 Cum. | 65 | ₹1,15,793.6 |
| 3 | Lining
(a) Watering ramming & dressing of Sub grade including removal of irregularities up to 15 cm depth. | 2,670.59 | Per 10 Sqm. | 95 | ₹2,53,706.05 |
| 4 | (b) Brick Masonary in Cement mortar (1:5) including cost of all materials including mechanical mixing of mortar with all leads & lifts and stacking etc. complete in all respect. | 445.29 | Per Cum. | 4,322 | ₹19,24,543.38 |
| 5 | (c) 10 mm thick cement plaster in cement mortar (1:4) as per design and specification including cost of all materials including mechanical mixing of mortar with all leads & lifts and stacking etc. with curing for specified period complete in all respect. | 4,555.71 | Per 10 Sqm. | 1,713 | ₹78,03,931.23 |
| 6 | Pucca Structures
(a) Earth work excavation in foundation trench in ordinary soil for structures and then refilling soil in 15 cm. Layers with all leads and lifts. | 512.99 | Per 10 Cum. | 293 | ₹1,50,306.07 |
| 7 | (b) Cement Concrete (1:4:8) including cost of all materials including using mechanical mixer with aggregate sixe 40 mm with all leads & lifts and stacking etc. complete in all respect. | 22.03 | Per Cum. | 3,153 | ₹69,460.59 |
| 8 | (c) Brick Masonary in cement mortar (1:6) including cost of all materials including mechanical mixing of mortar with all leads & lift and stacking etc. Complete in all respect. | 47.73 | Per Cum. | 4,304 | ₹2,05,429.92 |
| 9 | (d) 8 mm thick cement plaster in cement mortar (1:6) as per design and specification including cost of all materials including mechanical mixing of mortar with all leads & lifts and stacking etc. Complete in all respect. | 215.57 | Per 10 Sqm. | 1,544 | ₹3,32,840.08 |
| 11 | (e) Supply & Fixing of R.C.C. Nakka Frames | 33 | Each | 536 | ₹17,688 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_1056287.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .