| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.2 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.2 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹6.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.7 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹6.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.8 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | BEEMJI ENTERPRISE L8 | S.Sathish kumar L12 | M/S SAI RAM ENTERPRISES L6 | DHANASEKARAN J L10 | SRI KRISHNA CONSTRUCTION L7 | Naresh kumar L11 | V.Sekaran L2 | M SATHIYANANTHAM L1 | PRATHEESH L3 | AKASH L9 | M/S R.K Constructions L5 | Panner selvam g L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Vellore District Construction of Community Sanitary Complex at Sembedu in Sembedu Panchayat of Gudiyatham Block SBM (G) AIP / 2026-2027 Package no 01 | |||||||||||||||
| 2.00Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | |||||||||||||||
| 3.00 | 1st Depth | 7.54 | cu.m | 320 ₹2,412.8 | 335.39 ₹2,528.84 | 300 ₹2,262 | 322 ₹2,427.88 | 303.97 ₹2,291.93 | 429 ₹3,234.66 | 262.59 ₹1,979.93 | 120 ₹904.8 Lowest | 263.32 ₹1,985.43 | 227 ₹1,711.58 | 289.76 ₹2,184.79 | 283.17 ₹2,135.1 |
| 4.00 | 2nd Depth | 3.93 | cu.m | 400 ₹1,572 | 414.03 ₹1,627.14 | 300 ₹1,179 | 400 ₹1,572 | 375.23 ₹1,474.65 | 506 ₹1,988.58 | 324.16 ₹1,273.95 | 120 ₹471.6 Lowest | 325.05 ₹1,277.45 | 242 ₹951.06 | 357.69 ₹1,405.72 | 349.56 ₹1,373.77 |
| 5.00 | 3rd Depth | 10.89 | cu.m | 500 ₹5,445 | 430.01 ₹4,682.81 | 300 ₹3,267 | 415 ₹4,519.35 | 389.72 ₹4,244.05 | 522 ₹5,684.58 | 336.67 ₹3,666.34 | 120 ₹1,306.8 Lowest | 337.6 ₹3,676.46 | 237 ₹2,580.93 | 371.5 ₹4,045.64 | 363.06 ₹3,953.72 |
| 6.00 | Filling with Gritty Gravel including cost and coveyance of all materials to work site and all labour charges etc. | 3.96 | cu.m | 1,800 ₹7,128 | 285.55 ₹1,130.78 | 750 ₹2,970 | 275 ₹1,089 | 258.8 ₹1,024.85 | 380 ₹1,504.8 | 223.57 ₹885.34 | 150 ₹594 Lowest | 224.19 ₹887.79 | 468 ₹1,853.28 | 246.7 ₹976.93 | 241.09 ₹954.72 |
| 7.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 4.81 | cu.m | 3,750 ₹18,037.5 Lowest | 5,601.22 ₹26,941.87 | 4,800 ₹23,088 | 5,390 ₹25,925.9 | 5,076.35 ₹24,417.24 | 5,498 ₹26,445.38 | 4,385.4 ₹21,093.77 | 4,500 ₹21,645 | 4,397.5 ₹21,151.98 | 5,266 ₹25,329.46 | 4,839.07 ₹23,275.93 | 4,729.09 ₹22,746.92 |
| 8.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS | 0.75 | Mts. | 71,000 ₹53,250 | 93,680.54 ₹70,260.41 | 95,000 ₹71,250 | 90,130 ₹67,597.5 | 84,902.01 ₹63,676.51 | 91,969 ₹68,976.75 | 73,346 ₹55,009.5 | 75,000 ₹56,250 | 73,548.33 ₹55,161.25 | 8,000 ₹6,000 Lowest | 80,933.51 ₹60,700.13 | 79,094.11 ₹59,320.58 |
| 9.00 | Reinforcement Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs | 9.22 | cu.m | 5,200 ₹47,944 Lowest | 9,422.65 ₹86,876.83 | 8,000 ₹73,760 | 9,065 ₹83,579.3 | 8,539.68 ₹78,735.85 | 9,250 ₹85,285 | 7,377.35 ₹68,019.17 | 5,200 ₹47,944 Lowest | 7,397.7 ₹68,206.79 | 7,500 ₹69,150 | 8,140.52 ₹75,055.59 | 7,955.51 ₹73,349.8 |
| 10.00 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., | 16.92 | sq.m | 320 ₹5,414.4 | 557.68 ₹9,435.95 | 400 ₹6,768 | 536 ₹9,069.12 | 505.42 ₹8,551.71 | 547.5 ₹9,263.7 | 436.63 ₹7,387.78 | 300 ₹5,076 Lowest | 437.84 ₹7,408.25 | 528 ₹8,933.76 | 481.8 ₹8,152.06 | 470.85 ₹7,966.78 |
Tender Value
Refer Docs
EMD Value
₹15,700
Closing Date
7 Aug 2026, 3:00 pmClosed
The Block Developement Office Gudiyatham
The Block Developement Office Gudiyatham
Vellore District Construction of Community Sanitary Complex at Sembedu in Sembedu Panchayat of Gudiyatham Block SBM (G) AIP / 2026-2027 Package no 01
2026_RDTN_686807_1
B4/51/2024
Open Tender
Civil Works
Item Rate
180 days
The Block Developement Office Gudiyatham
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹15,700
7 Aug 2026
18 Jul 2026
7 Aug 2026
18 Jul 2026
7 Aug 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Vellore District Construction of Community Sanitary Complex at Sembedu in Sembedu Panchayat of Gudiyatham Block SBM (G) AIP / 2026-2027 Package no 01 | - | - | - | - |
| 2 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | - | - | - | - |
| 3 | 1st Depth | 7.54 | cu.m | - | - |
| 4 | 2nd Depth | 3.93 | cu.m | - | - |
| 5 | 3rd Depth | 10.89 | cu.m | - | - |
| 6 | Filling with Gritty Gravel including cost and coveyance of all materials to work site and all labour charges etc. | 3.96 | cu.m | - | - |
| 7 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 4.81 | cu.m | - | - |
| 8 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS | - | Mts. | - | - |
| 9 | Reinforcement Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs | 9.22 | cu.m | - | - |
| 10 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., | 16.92 | sq.m | - | - |
stage.html
html • 0.04 MB
finance_825575.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Tendernotice_2.pdf
PDF • 0.37 MB
BOQ_825575.xls
BOQ • 0.26 MB
1notice.pdf
PDF • 0.46 MB
tnnoticenew.pdf
PDF • 1.61 MB
14gudiyathampp.pdf
PDF • 0.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].