| Sl No | Description | Qty | Unit | LASYA ENGINEERING PROJECTS L2 | DK ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Improvement works | |||||
| 1.01 | Dismantling the IWC and surki around the closet and clearing the site and disposing the debris 1 Km away including the cost of all labour, lead, lift, T&P etc complete. | 3 | Nos | 1,581.8 ₹4,745.4 | 950 ₹2,850 |
| 1.02 | Dismantling of existing Damaged Brick in cement mortar walls under 3m high including cost of all materials, hire charges for tools and plants, clearing the debris away, needed safety arrangements, all leads, lifts etc complete. | 0.12 | cum | 2,750 ₹330 | 335 ₹40.2 |
| 1.03 | Dismantling of existing damaged floor & wall tiles without any damage to the existing structure including cost of labour, T & P safety arrangements, cleaning the site,lead,lift etc complete. | 74 | sqm | 181.5 ₹13,431 | 280 ₹20,720 |
| 1.04 | Dismantling and removal of existing PCC without any damage to the existing structure including cost of labour, T & P safety arrangements, cleaning the site,lead,lift etc complete. | 2.5 | cum | 3,850 ₹9,625 | 575 ₹1,437.5 |
| 1.05 | Chipping of the roof concrete and roughening the surface the cost including clearing the debris up to a distance of 1KM away from the site, all labourers, Hire charges for tools needed safety arrangements all leads, lifts etc. Complete. | 1 | sqm | 198 ₹198 | 50 ₹50 |
| 1.06 | Clean removal of cement plaster from existing inner wall sides and removing of cement plaster wastages from premises as directed by the site engineer including cost of all labours, materials, lead, lift, etc., complete. | 10.5 | sqm | 121 ₹1,270.5 | 12 ₹126 |
| 1.07 | Dismantling Stone Masonry in cement mortar walls under 3m high including cost of all materials, hire charges for tools and plants, clearing the debris away, needed safety arrangements, all leads, lifts etc complete. | 0.24 | cum | 4,620 ₹1,108.8 | 335 ₹80.4 |
| 1.08 | Earth work excavation for foundation ( HGS 20 B ) and depositing on bank with an initial lead of 10 m & lift of 2 m in Hard stiff clay , stiff black cotton, hard red earth , shales murram. gravel, stoney earth and earth mixed with small size boulders SS 20 B, including cost of tools and plants etc, complete. | 0.73 | cum | 495 ₹361.35 | 500 ₹365 |
| 1.09 | Supplying and filling M-sand for foundation, with well watering and consolidation as per the standard specification etc, complete | 0.36 | cum | 1,926 ₹693.36 | 600 ₹216 |
Tender Value
Refer Docs
EMD Value
₹1,934
Closing Date
2 Jun 2026, 2:00 pmClosed
SE/MEDC/METRO/MADURAI
TNEB Complex, Race Course Road, K.Pudur, Madurai
Improvement works by upgrading the old dilapidated existing IWC (Indian Water Closet), floor tiles, Dadooing tiles by providing new IWC, Antiskid tiles, Dadooing tiles with allied Civil works in the First Floor Central Wing Ladies Toilet at TNPDCL
2026_EB_677330_1
SE/MEDC/METRO/MDU - 002/2026 - 27
Open Tender
Civil Works
Madurai
as in specification
2 documents required · 2 mandatory
₹0
₹1,934
Yes
9 Jul 2026
16 May 2026
3 Jun 2026
16 May 2026
2 Jun 2026
16 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Improvement works | |||||
| 1.01 | Dismantling the IWC and surki around the closet and clearing the site and disposing the debris 1 Km away including the cost of all labour, lead, lift, T&P etc complete. | 3 | Nos | - | - |
| 1.02 | Dismantling of existing Damaged Brick in cement mortar walls under 3m high including cost of all materials, hire charges for tools and plants, clearing the debris away, needed safety arrangements, all leads, lifts etc complete. | 0.12 | cum | - | - |
| 1.03 | Dismantling of existing damaged floor & wall tiles without any damage to the existing structure including cost of labour, T & P safety arrangements, cleaning the site,lead,lift etc complete. | 74 | sqm | - | - |
| 1.04 | Dismantling and removal of existing PCC without any damage to the existing structure including cost of labour, T & P safety arrangements, cleaning the site,lead,lift etc complete. | 2.5 | cum | - | - |
| 1.05 | Chipping of the roof concrete and roughening the surface the cost including clearing the debris up to a distance of 1KM away from the site, all labourers, Hire charges for tools needed safety arrangements all leads, lifts etc. Complete. | 1 | sqm | - | - |
| 1.06 | Clean removal of cement plaster from existing inner wall sides and removing of cement plaster wastages from premises as directed by the site engineer including cost of all labours, materials, lead, lift, etc., complete. | 10.5 | sqm | - | - |
| 1.07 | Dismantling Stone Masonry in cement mortar walls under 3m high including cost of all materials, hire charges for tools and plants, clearing the debris away, needed safety arrangements, all leads, lifts etc complete. | 0.24 | cum | - | - |
| 1.08 | Earth work excavation for foundation ( HGS 20 B ) and depositing on bank with an initial lead of 10 m & lift of 2 m in Hard stiff clay , stiff black cotton, hard red earth , shales murram. gravel, stoney earth and earth mixed with small size boulders SS 20 B, including cost of tools and plants etc, complete. | 0.73 | cum | - | - |
| 1.09 | Supplying and filling M-sand for foundation, with well watering and consolidation as per the standard specification etc, complete | 0.36 | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_813851.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid