Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.2 CrAccepted-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹3.2 Cr | L-1 | Accepted-Finance ADMITTED |
| 2 | L-2₹4.5 Cr+₹1.4 Cr (43.8%)Rejected-Finance NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | ₹4.5 Cr+₹1.4 Cr (43.8%) | L-2 | Rejected-Finance ADMITTED |
| 3 | L-3₹4.7 Cr+₹1.6 Cr (49.7%)Rejected-Finance | ₹4.7 Cr+₹1.6 Cr (49.7%) | L-3 | Rejected-Finance ADMITTED |
| 4 | L-4₹5.0 Cr+₹1.8 Cr (57.3%)Rejected-Finance GIJROLI DY LIKELY RELATED TO THE WORK LOCATION MENTIONED SPECIFIC ADDRESS NOT PROVIDED FOR THE CONTRACTOR | DAMAN | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396210 | ₹5.0 Cr+₹1.8 Cr (57.3%) | L-4 | Rejected-Finance ADMITTED |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | PURNAGIRI CONSTRUCTION CO. PVT. LTD. L3 | BHAMAR SINGH L1 | MEGHENDRA PAL SINGH CONTRECTOR L4 | M/S UNITE ENTERPRISES L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Supplying & Filling of old/used E.C. Bags with local earth from required lead by tractor trolly i/c sewing with sutli including all lead&lift, loding, unloading, labour, T&P and placing to worksite etc for proper completion of work as directed by engineer-in-charge. | 7,116 | Nos. | 19 ₹1,35,204 | 18 ₹1,28,088 Lowest | 21 ₹1,49,436 | 18.1 ₹1,28,799.6 |
| 2.00 | Providing & laying R.B.M for making coffer bund in down stream of barrage excluding cost of R.B.M including all lead&lift, loding, unloading, labour, T&P and placing to worksite etc for proper completion of work as directed by engineer-in-charge. | 6,661.75 | cum. | 392 ₹26,11,406 | 150 ₹9,99,262.5 Lowest | 425 ₹28,31,243.75 | 245.25 ₹16,33,794.19 |
| 3.00 | Dismantling old damaged cement concrete work of launching apron including stacking of all material with in a distance upto 60 m.as per direction of Engineer-in charge for proper complition of work . | 2,844.6 | cum. | 556 ₹15,81,597.6 | 400 ₹11,37,840 Lowest | 622 ₹17,69,341.2 | 475.1 ₹13,51,469.46 |
| 4.00 | Providing & Laying stone grit (10-20 mm size) in between jhiris/gaps of Conc. Blocks Rows including cost of all materials carriage up to site of work labour, T&P etc. required for proper completion of work as directed by engineer-in-charge. | 454.4 | cum. | 2,742 ₹12,45,964.8 | 1,800 ₹8,17,920 Lowest | 3,000 ₹13,63,200 | 2,445.5 ₹11,11,235.2 |
| 5.00 | Providing & laying hand packed boulder 40-60 Kg. wt. in scour/damaged floor portion including cost of all materials carriage up to site of work, labour T&P etc. required for proper completion of work as directed by engineer-in-charge. | 1,104.65 | cum. | 827 ₹9,13,545.55 | 550 ₹6,07,557.5 Lowest | 900 ₹9,94,185 | 745 ₹8,22,964.25 |
| 6.00 | Providing and laying packing boulder 20 to 40 Kg. wt. in 8 S.W.G. (4mm.) G.I.Wire crate (size 3.0x1.50x1.0 m.) 15cm.x15cm. mesh double Knot type including cost of all material, carriage up to site T&P lead and lift and labour required for proper completion of work as directed by engineer-in-charge. | 211 | Nos. | 6,391 ₹13,48,501 | 5,000 ₹10,55,000 Lowest | 7,000 ₹14,77,000 | 7,150 ₹15,08,650 |
| 7.00 | Centering & Shuttering for C. C.Blocks including cost of centering & shuttering all materials ,labour ,T&P etc. required for proper complition of work as directed by engineer-in-charge . | 4,652.3 | sqm. | 617 ₹28,70,469.1 | 380 ₹17,67,874 | 600 ₹27,91,380 | 295 ₹13,72,428.5 Lowest |
| 8.00 | Providing & laying cement conc. In M25 (1:1:2 -cement:Coarse sand:shingle/Grit 12-20 mm.size) including cost of all materials , Labour and T&P etc. required for proper completion of work as directed by engineer-in-charge. | 2,217.85 | cum. | 8,240 ₹1,82,75,084 | 4,800 ₹1,06,45,680 Lowest | 9,000 ₹1,99,60,650 | 8,810 ₹1,95,39,258.5 |
| 9.00 | Hiring of diesel pumps 5 H.P. including operater and POL for surface dewatering with cost of labour all T&P etc. required for proper complition of work as directed by engineer-in-charge. | 5,250 | Hour. | 147 ₹7,71,750 | 100 ₹5,25,000 | 150 ₹7,87,500 | 45 ₹2,36,250 Lowest |
| 10.00 | Disposal of dismantaled material in scour portion of D/S right marginal bund launching apron carraige up to 1.00 km by tractor trolly including cost of labour and T&P etc. required for proper complition of work as directed by engineer-in-charge. | 2,844.6 | cum. | 251 ₹7,13,994.6 | 180 ₹5,12,028 | 270 ₹7,68,042 | 175 ₹4,97,805 Lowest |
Tender Value
₹5.3 Cr
EMD Value
₹10.6 L
Closing Date
3 Aug 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
SE VTH CIRCLE IW BAREILLY
Janpad Champawat main sharda barrage banbasa ke gate sankhya 05 se 10 ke upstream va downstream main chaigrast flour buffle block va dented sill evam launching appron ki punarsthapna ka karye.
2026_UPIDC_1169736_1
02/SE/2026-27
Open Tender
Civil Works
Item Rate
540 days
BANBASA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
Yes
₹10.6 L
Yes
29 Aug 2026
18 Jul 2026
3 Aug 2026
18 Jul 2026
3 Aug 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying & Filling of old/used E.C. Bags with local earth from required lead by tractor trolly i/c sewing with sutli including all lead&lift, loding, unloading, labour, T&P and placing to worksite etc for proper completion of work as directed by engineer-in-charge. | 7,116 | Nos. | - | - |
| 2 | Providing & laying R.B.M for making coffer bund in down stream of barrage excluding cost of R.B.M including all lead&lift, loding, unloading, labour, T&P and placing to worksite etc for proper completion of work as directed by engineer-in-charge. | 6,661.75 | cum. | - | - |
| 3 | Dismantling old damaged cement concrete work of launching apron including stacking of all material with in a distance upto 60 m.as per direction of Engineer-in charge for proper complition of work . | 2,844.6 | cum. | - | - |
| 4 | Providing & Laying stone grit (10-20 mm size) in between jhiris/gaps of Conc. Blocks Rows including cost of all materials carriage up to site of work labour, T&P etc. required for proper completion of work as directed by engineer-in-charge. | 454.4 | cum. | - | - |
| 5 | Providing & laying hand packed boulder 40-60 Kg. wt. in scour/damaged floor portion including cost of all materials carriage up to site of work, labour T&P etc. required for proper completion of work as directed by engineer-in-charge. | 1,104.65 | cum. | - | - |
| 6 | Providing and laying packing boulder 20 to 40 Kg. wt. in 8 S.W.G. (4mm.) G.I.Wire crate (size 3.0x1.50x1.0 m.) 15cm.x15cm. mesh double Knot type including cost of all material, carriage up to site T&P lead and lift and labour required for proper completion of work as directed by engineer-in-charge. | 211 | Nos. | - | - |
| 7 | Centering & Shuttering for C. C.Blocks including cost of centering & shuttering all materials ,labour ,T&P etc. required for proper complition of work as directed by engineer-in-charge . | 4,652.3 | sqm. | - | - |
| 8 | Providing & laying cement conc. In M25 (1:1:2 -cement:Coarse sand:shingle/Grit 12-20 mm.size) including cost of all materials , Labour and T&P etc. required for proper completion of work as directed by engineer-in-charge. | 2,217.85 | cum. | - | - |
| 9 | Hiring of diesel pumps 5 H.P. including operater and POL for surface dewatering with cost of labour all T&P etc. required for proper complition of work as directed by engineer-in-charge. | 5,250 | Hour. | - | - |
| 10 | Disposal of dismantaled material in scour portion of D/S right marginal bund launching apron carraige up to 1.00 km by tractor trolly including cost of labour and T&P etc. required for proper complition of work as directed by engineer-in-charge. | 2,844.6 | cum. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
LOT06.pdf
Tender Documents • 2.44 MB
BOQ_2194892.xls
BOQ • 0.29 MB
RETENDERLOT0230072026.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .