Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹26.9 CrAdmitted-Finance AT BELGAON PO BELGAON PS SAINTALA DIST BALANGIR | BELGAON | BALANGIR | ODISHA | L1 | Admitted-Finance | ||
| 2 | L1₹26.9 CrAdmitted-Finance 289 SUNDAR NAGAR BEHIND CSEB OFFICE NEAR MOTHER S PRIDE SCHOOL AAROHI TANKER STREET RAIPUR CHATTISGARH 492013 | RAIPUR | RAIPUR | CHHATTISGARH | 492013 | L1 | Admitted-Finance | ||
| 3 | Rejected-Technical AT BELGAON SAINTALA BALANGIR 767032 | BALANGIR | BALANGIR | ODISHA | 767032 | - | Rejected-Technical Non Responsive- does Not Meet Clause 112(g) but meets Schedule(C) and Annexure-I, and bidder has submitted incomplete affidavit for schedule F. | ||
| 4 | Rejected-Technical | - | Rejected-Technical Non Responsive- does Not Meet Clause 112(g) but meets Schedule(C) and Annexure-I | ||
| 5 | Rejected-Technical | - | Rejected-Technical Non Responsive- does Not Meet Clause 112(g) but meets Schedule(C) and Annexure-I |
Tender Value
₹29.9 Cr
Closing Date
28 Sept 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CGM (PC)
OIIDC IDCO Towers,Janpath, Bhubaneswar
Construction of 1000 Persons Workers Hostel (G plus 2) at Bolangir, Odisha.
2022_IDCO_81590_1
PC/EST/E-67/2022-23
National Competitive Bid
Civil Works - Buildings
Percentage
540 days
Bolangir
Pleased refer to Tender Documents
3 documents required · 3 mandatory
₹11,800
Exempted
OIIDC IDCO Towers,Janpath, Bhubaneswar
17 Nov 2022
20 Sept 2022
29 Sept 2022
20 Sept 2022
28 Sept 2022
20 Sept 2022
20 Sept 2022 - 27 Sept 2022
26 Sept 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Work | |||||
| 2Earthwork in excavation of foundation trenches for columns, basement, tie beams, walls and steps in All Kind of soil including moorum, hard stony earth, earth mixed with boulders, Laterite rocks etc but not requiring blasting with initial leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, design including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge. | |||||
| 3 | 1.5 m initial lift. | 8,772.97 | Cum | 215.2 | ₹18,87,943.14 |
| 4 | Filling in foundation and plinth with excavated materials, moorum including watering and ramming as directed by the Engineer-in-charge of earth work. | 6,784.04 | Cum | 119.5 | ₹8,10,692.78 |
| 5 | Supplying, & filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyance, royalties, , of all materials and cost of all labour with T&P, sundries required for the work etc., complete (Measurement will be taken on finished compacted section) as per specification and direction of Engineer-in-charge. | 1,611.99 | Cum | 279.5 | ₹4,50,551.21 |
| 6 | Supplying, diluting and preparing chemical emulsion like CHLORPYRIPHOS or other chemicals approved by Central Insecticides Board or as directed by the manufacturer and spraying the mixture uniformly by sprayer as pre-constructional anti termite treatment and creating a chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of walls and floors along with external perimeter of the building, expansion joints, surrounding the pipes and conduits etc. complete at the rate of 7.5 liters (or as directed by the manufacturer) per sqm on vertical and 5.0 litres per sqm on horizontal surfaces, 50% of the emulsion to be filled in the holes made in trenches at 150mm center to center etc.complete as per IS:6313/1981(Part-II) and as per the direction of the Engineer-in-charge including cost of all materials, labour, ,, etc. complete.
.( The payment shall be made on the basis of actual plinth area of the building at ground floor )
Note- The contractor shall have to furnish ten years guarantee from the authorized agency who will execute the work. | 4,099.3 | Sqm | 95.2 | ₹3,90,253.36 |
| 7 | Plain Cement concrete (1:4:8)in foundation and floors using 4cm(1½”) size hard crusher broken granite stone metal of approved quality and from approved quarry including lowering, laying concrete, watering, curing etc, complete to required levels laid in layers not exceeding 0’-6” thick in each layer including cost, conveyances, royalties, , of all materials and cost of all labour with T&P required for the work etc, complete as per specification & direction of the Engineer-in-charge. | 1,334.88 | Cum | 4,190.7 | ₹55,94,081.62 |
| 8Providing ,Lifting, Hoisting & Laying Reinforced Cement Concrete of M-30 Grade in all type of Concrete works( i.e footing, Plinth Band, Lintels, Chajja, Shelf fins, Roof slabs, Balconies, Staircase, Column, Beam Parapets, Window sills, RCC Wall, Railings etc. ) of approved designs and drawings having a minimum compressive strength ( in work test) 30 N/mm2 in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using screened & washed sharp river sand for mortar and 10 mm. to 20 mm. size black hard crusher broken granite stone chips of approved quality from approved quarry, washed and cleaned to be mixed in concrete mixture with approved quality of cement including hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days, including cost of required steel centering and shuttering there after dismantling and removing the debrises away from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading,stacking, royalties of all materials, cost of all labours, scaffolding, sundries, T&P required for the work etc. complete in all respect but the excluding cost & conveyance of M.S. rods or Tor Steel and Binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or Tor steel and binding wires and tying the grills and placing in proper position excluding GST as directed by the Engineer-in-charge. | |||||
| 9In Foundation | |||||
| 9.01 | a) Column footing, Pedestal , Pile Cap etc | 1,859.62 | Cum | 5,127.6 | ₹95,35,387.51 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_411099.xls
BOQ • 6.95 MB
DRAWINGS.pdf
Additional Documents • 21.32 MB
LISTOFMAKES.pdf
Additional Documents • 0.04 MB
BID.pdf
Tender Documents • 0.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .