Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-Finance 86 MOULI JAGRAN COMPLEX CHANDIGARH | CHANDIGARH | CHANDIGARH | CHANDIGARH | ₹9.2 L | L1 | Accepted-Finance Lowest Bid |
| 2 | L2₹9.7 LRejected-Finance CHANDIGARH | ₹9.7 L | L2 | Rejected-Finance Highest Bid |
| Sl No | Description | Qty | Unit | A.H.A CONSTRUCTIONS L1 | G.S HR SOLUTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means(Hydraulic excavator) / manual means I foudation trenches or drains(not exceeding 1.5 m in width or 10sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kind of soil. as per DNIT | 73 | Cum | 250 ₹18,250 | 295 ₹21,535 |
| 2.00 | Demolishing concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineer in charge. Nominal concrete 1:3:6 or richer mix ( i/c equivalent design mix) as per DNIT | 27 | Cum | 2,365 ₹63,855 | 2,430 ₹65,610 |
| 3.00 | Dismantling old plaster or skirting out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. as per DNIT | 306 | Sqm | 65 ₹19,890 | 70 ₹21,420 |
| 4.00 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar as per DNIT | 44 | Cum | 2,000 ₹88,000 | 2,135 ₹93,940 |
| 5.00 | Recovery of bricks as per Market Rates as per DNIT | 8,448 | Nos. | 3 -₹25,344 | 2.5 -₹21,120 |
| 6.00 | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): From brick work in cement mortar as per DNIT | 17.6 | Cum | 6,700 ₹1.2 L | 6,815 ₹1.2 L |
| 7.00 | Disposal moorum/building rubbish/malba/similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved Muncipal dumping ground for lead up to 5 km for all lifts, complete as per directions of Engineer -in- charge. as per DNIT | 34 | Cum | 500 ₹17,000 | 525 ₹17,850 |
| 8.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - -All work up to plinth level: ( 1 Cement: 8 coarse sand : 16 graded stone aggregate 40 mm nominal size) as per DNIT | 27 | Cum | 5,100 ₹1.4 L | 5,189 ₹1.4 L |
| 9.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) as per DNIT | 44 | Cum | 7,100 ₹3.1 L | 7,225 ₹3.2 L |
| 10.00 | Providing and Laying 12 mm cement plaster :1:4 ( 1 cement concrete 4 Fine sand) as per DNIT | 490 | sqm | 350 ₹1.7 L | 395 ₹1.9 L |
Tender Value
₹9.0 L
EMD Value
₹18,000
Closing Date
29 Dec 2025, 5:00 pmClosed
Administrator, Market Committee, Chandigarh
Market Committee, Sector-26, Chandigarh
Re-tender for the work of Maintenance of Vegetable and Onion/Potato auction platform in subzi mandi, Sector-26, Chandigarh
2025_CHD_89617_1
MCC/2025/1822-1823
Open Tender
Civil Works
60 days
Subzi Mandi, Sector-26
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,000
16 Jan 2026
18 Dec 2025
30 Dec 2025
18 Dec 2025
29 Dec 2025
18 Dec 2025
Amount
Earth work in excavation by mechanical means(Hydraulic excavator) / manual means I foudation trenches or drains(not exceeding 1.5 m in width or 10sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kind of soil. as per DNIT
Demolishing concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineer in charge. Nominal concrete 1:3:6 or richer mix ( i/c equivalent design mix) as per DNIT
Dismantling old plaster or skirting out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. as per DNIT
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar as per DNIT
Recovery of bricks as per Market Rates as per DNIT
Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): From brick work in cement mortar as per DNIT
Disposal moorum/building rubbish/malba/similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved Muncipal dumping ground for lead up to 5 km for all lifts, complete as per directions of Engineer -in- charge. as per DNIT
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - -All work up to plinth level: ( 1 Cement: 8 coarse sand : 16 graded stone aggregate 40 mm nominal size) as per DNIT
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) as per DNIT
Providing and Laying 12 mm cement plaster :1:4 ( 1 cement concrete 4 Fine sand) as per DNIT
G.S HR SOLUTIONS (BID ID -305051)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.42 MB
BOQ_109604.xls
BOQ • 0.28 MB
Tendernotiice.pdf
Tender Documents • 6.40 MB
Download all tender documents and submit your bid