Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.9 LAccepted-AOC SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | ₹48.9 L Quoted ₹49.8 L | L1 | Accepted-AOC Being lowest |
| 2 | L2₹50.1 L+₹32,890 (0.66%)Rejected-Finance SWAGAT CO OP HSG SOCIETY LTD 22 303 CHAITANYA SHIVAJI RAJE COMPLEX MHADA COMPLEX OPP EKA NAGAR KANDIVALI W MUMBAI 400 067 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | ₹50.1 L+₹32,890 (0.66%) | L2 | Rejected-Finance OTHER THAN LOWEST |
| 3 | L3₹59.3 L+₹9.5 L (19.1%)Rejected-Finance | ₹59.3 L+₹9.5 L (19.1%) | L3 | Rejected-Finance OTHER THAN LOWEST |
Tender Value
₹85 L
EMD Value
₹1.5 L
Closing Date
5 Feb 2024, 6:00 pmClosed
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
COMPREHENSIVE MAINT AND REPAIR REPLACEMENT OF CENTRAL AC PLANT, VRV VRF SYSTEM FIRE FIGHTING SYSTEM INSTALLED AT HQ WNC COMMAND POST, BLDG. AT NAVAL DOCKYARD INCLUDING MANNING AND OPERATION UNDER GE NW KUNJALI, COLABA, MUMBAI
2024_MES_635236_1
8580/CWE (NW) Mumbai/E8
Open Tender
Civil Works
Item Rate
330 days
GE (NW) Kunjali
Class C
Category c (i) and d (v)
7 documents required · 7 mandatory
₹1,000
Yes
GE (NW) Kunjali
₹1.5 L
Yes
26 Mar 2024
2 Jan 2024
7 Feb 2024
2 Jan 2024
5 Feb 2024
23 Jan 2024
2 Jan 2024 - 20 Jan 2024
Amount
SCHEDULE 'A' PART-I . Manning and operation of electrical receiving sub station 6.6 KV/433 volts at HQ WNC Mumbai Office complex by deploying (Skilled) Electrician - 01 No per shift (in three shifts per day,round the clock) including Sundays and Holidays:- Note: Shift timings are as under:- (a) First shift : 0600 hr to 1400 hr (b) Second shift: 1400 hr to 2200 hr (c) Third shift : 2200 hr to 0600 hr
Manning and operation of electrically operated 08 passenger capacity lifts (02 No.), serving any number of floors (G+5) in two shifts per day complete all as directed for the HQ WNC building by deploying Lift Operator (Skilled ) : 01 No per shift (in two shifts per day) including Sundays and holidays :- Note: Shift timings are as under:- (a) First shift: 0600 hr to 1400 hr (b) Second shift: 1400 hr to 2200 hr
Manning and operation for water supply installation/ fire fighting pump installation at HQ WNC building Area in two shifts per day (Each shift comprising of 08 hr) including Sundays & Holiday by deploying FGM (mate semi-skilled) - 01 No per shift (in two shifts per day) :- Note: Shift timings are as under:- (a) First shift : 0600 hr to 1400 hr (b) Second shift: 1400 hr to 2200 hr
Manning and operation of AC Plant at WNC building 200 TR capacity, air-cooled type chiller package, with reciprocating compressor, open type (2 Working + 1 Standby), comprising of following by deploying undermentioned manpower in two shifts per day including Sundays and holidays :- Chiller unit comprising of Reciprocating compressor, Condenser, Expansion valve Evaporator of capacity 100 TR - 03 Nos. (02 working + 01 standby) Mono block Centrifugal pump set, Capacity 15 HP - 03 Nos (02 working + 01 standby) Ceiling suspended AHUs as given below:- (i) Capacity 8000 cfm : 01 No. (ii) Capacity 7500 cfm : 01 No. (iii) Capacity 6500 cfm : 02 Nos. (iv) Capacity 6000 cfm : 05 Nos. (v) Capacity 5500 cfm : 01 No. (vi) Capacity 5000 cfm : 04 Nos. (vii) Capacity 4500 cfm : 02 Nos. (viii) Capacity 4000 cfm : 03 Nos. (ix) Capacity 3500 cfm : 02 Nos. (x) Capacity 3000 cfm : 01 No. Toilet exhaust units as given below:- (i) Capacity 4500 cfm : 01 No. (ii) Capacity 3500 cfm : 01 No. (iii) Capacity 1500 cfm : 01 No. (iv) Capacity 500 cfm : 01 No. Fresh air units as given below:- (i) Capacity 6500 cfm : 01 No. (ii) Capacity 1500 cfm : 06 Nos. Ducting for supply air with VCDs and SA/RAdiffusers - 01 set Chilled water piping : 01 Set. Drain water piping : 01 Set Adapter panel for chiller : 03 Nos.Ventilation fan starter panels : 07 Nos.Toilet exhaust fan starter panels : 04 Nos AHU starter panels : 22 Nos. Chiller pump starter panels : 03 Nos Refrigeration mechanic (SK) : 01 No Per shift Note :- For two shift from 0600hrs to 1400hrs and from 1400hrs to 2200hrs per shift per day Mech/Ref or A/C Operator (Skilled) -01 No per shift.
Note for Sch. Item No 1.00 to 4.00 :- (i) Contractor shall submit ID proof, residential proof, bank A/C details to department and obtain approval of Engineer-in-Charge before employing a person as operator. (ii) Plant operator shall be available as per the shift timings specified in the tender and he will report to JE E/M in-Charge In case of emergency he will function according to their direction. If he is found absent or move without intimating to in-Charge or JE E/M he will be treated as absent for the said shift and recovery of Rs 1500/- per shift shall be affected. (iii) Payment as per quoted rate shall also be deducted in addition to the penalty as specified above. (iv) Contractor shall submit the labour licence & Copy of GST Regn registered number issued by concerned authority. (v) The payment shall be made to employees on or before 10th of every calender month. Payment to employees shall be done by crossed cheque / RTGS / NEFT / IMPS through Aadhar card linked Bank Account only and it shall not be less than minumum fair wages and statutory requiments such EPF and ESI as per Act in vogue. (vi) The rate quoted by the contractor shall be inclusive of life insurance for the tradesmen employed by him in case of untoward incident such as injuries fracture or casualty while on duty (vii) Surprise check will be carried out by department representative and if any employes is not available at his working place, he will be treated as absent. (viii) Contractor has to submit the list of employees including reserve alongwith police verification, Aadhar card, Aadhar card linked Bank Account No and relevant documents as mentioned in PS to the Engineer-in-Charge alongwith performance security before issue work order.
(ix) Contractor has to submit proof of payment of EPF and ESI subscription made by his alongwith RAR failing which RAR will not be progressed for payment (x) Contractor has to employ the number of labours per day as intimated by the Engineer-in-Charge for which he has to make alternative arrangement. (xi) The rates quoted by the contractor shall be deemed to be included provision of all latest labour laws / regulations including all relevant taxes as applicable. (xii) Contractor shall quote the rates considering their monthly leaves, releiver etc as per labour laws and nothing extra shall be paid on account of the above. In case of absence of staff/tradesman from duty, payment of that day will not be paid. In addition to that a penalty of Rs 1500/- per day per person will be recovered from contractors dues. Also in case of long absence (more than one week) of staff/tradesman, the penalty shall be recovered including Sundays & Holidays if any. The contractor shall have no claim on this account. (xiii) Contractor has to supply two sets of Tools and Plants (as applicable) to the labours employed by him and should be placed with the safe custody of department. Rates quoted shall be deemed shall be included as part of contractors profit.
(xiv) The bidders shall not quote rate less than minimum fair wages including other statutory requirement such EPF and ESI including GST as given at para 19 of Sch A Notes. If the quoted amount is less than the estimated cost, the lowest bidder will have to deposit FDR/BGB as elaborated herein after in favour of Accepting Officer within 07 days of opening of financial bid. (xv) The deposited amount shall be the difference between estimated cost and amount quoted by lowest bidder for respective item. FDR/BGB shall be released only after satisfactory completion of work. If the contractor fails to pay minimum wages to employees and other statutory requirments like EPF and ESI, the department shall have right to withhold the said amount which will be verified and confirmed by GE. The decision of Accepting Officer regarding amount to be withhold shall be final and binding. The withhold amount will be utilised by GE for payment to employees if contractor fails to pay minimum wages and balance amount if any shall only be released. If the lowest bidder fails to deposit the amount as stated above within 07 working days, it shall be treated as willful negligence of the bidder with ulterior motives and such tenderer shall be banned from bidding for a period of six months commencing from the date of opening of Financial Bid . The contractor shall sumbit 03 Nos of BGBs/FDRs of equal amount as mentioned above. The BGBs/FDRs validity shall be 04 months, 08 month & 12 months respectively for the purpose of encashment/ release as the case may be. (xvi) The rates quoted shall be inclusive of suitable reliver wherever sundays & holidays are mentioned for working (xvii) Quoted rates should include Stationary,Uniform,Shoes,log book and all safety equipments/ Harness which shall be included as part of contractors profit.
SCHEDULE 'A' PART-II Comprehensive maintenance of central air conditioning plant 200 TR capacity opening/checking/clening of air conditioner's filters if required replace the filters, including the type of filter match with existing, cleaning of coils, and fins as per regular maintenance schdule for smooth effectively functioning of AC Plants. Checking the motor, blower, drain line, coils, operating pressures and temperatures, the return and supply lines, refrigerant levels, and connections also clean the coils during a routine maintenance visit filter should be changed depends on a variety of factors, including the type of filter match with existing at HQ WNC building comprising of equipment mentioned at item No 4.00 of Sch 'A' Part I all as specified and directed by Engineer-in-Charge. The maintenace schdule shall be as under:- (a) Check driving coupling of compressor shaft and motor for level and tightness, check oil level in compressure crank case, check pressure guage, if gas leak is suspected, test circuit with test lamp or leak detector, also check compressure and motor for unuseal noise, vibration and over heating of bearings. (b) Cleaning of AHU unit filters with pressure if required rinse with clean with fresh water and dry before replacing. (c) Remove starter cover below of all and clean dust & the contacts with pressure, CTC/ alcohal/sprit and adjust the tensin of the contacts. testing of low pressure lubrication oil cutout laid down also measure insulation of all motors and record readings. sufficient lubricants of all motors/compressor motors and chillling water pump motor etc.
Comprehensive maintenance of VRV/VRF system at roof top of HQ WNC building comprising of following equipment all as specified and directed by Engineer-in-Charge including dismantling of out door unit covers of VRV/VRF unit of any capacity completely by disconnecting/ covering all electric/electronic boards and wiring and servicing condensor coils and compressor, reservoir areas completly wet servicing by using approved chemicals by OEM and re-assembling setting all parameters by using softwares by an OEM Engineer, testing of indoor unit and Dismantling of four way high wall indoor unit covers of VRV/VRFunit of any capacity completely by disconnecting/ covering all electronic boards and wiring and servicing cooling coils, expansion valves, indoor drainage pumps, drainage lines completely wet servicing by using approved chemicals by OEM manufacturer by using tray jackets including cleaning the surface after servicing testing all as directed by Engineer-in-Charge. Note :- Test report shall be kept on record duly signed by Engineer-in-Charge :- Out door units (Make: Daikin) of capacity mentioned below:- (a) 12 HP : 02 Nos. (Model No. RXYQ 12 PAY6) (b) 16 HP : 02 Nos. (Model No. RXYQ 16 PAY6) (c) 18 HP : 02 Nos. (Model No. RXYQ 18 PAY6) Indoor units (Make: Daikin) of capacity mentioned below:- (a) 6.54 TR: 04 Nos. (Ductable units) (b) 1.33 TR: 08 Nos.(c) 1.65 TR: 03 Nos. (d) 3.3 TR: 08 Nos. (e) 4.12 TR: 02 Nos. Copper piping for flow of refrigerant : 01 set Drain water piping (PVC pipes): 01 set, Supply air Ducting: 01 set Remote controls: 25 Nos.
Comprehensive maintenance of fire alarm system including minor consumeable electric / electonic spares for smooth functioning of AFDS of HQ WNC building comprising of equipment mentioned as under all as specified and directed by Engineer-in-Charge :- Addressable Multisensor detector (Photo + Thermal) with base with galvanised steel, back box, and all mounting Accessories : 440 Nos. (Make: Siemens) Analogue Addressable Heat detector : 03 Nos. (Make: Siemens) Addressable Dual Action Manual Pull Stations including MS box of suitable size for concealing the MCP in the wall : 49 Nos. (Make: Siemens) Addressable Monitor Modules : 04 Nos. (Make: Siemens) Addressable Control Modules with 230V 2A relay : 14 Nos. (Make: Siemens) Addressable Control Module For Hooter : 11 Nos. (Make: Siemens) Electronic Hooter : 49 Nos. (Make: Siemens) Fault Isolator Module : 25 Nos. (Make: Siemens) Response Indicator consisting of Red LED : 183 Nos. (Make: Siemens)
Comprehensive maintenance of fire fighting and sprinkling system at HQ WNC building comprising of following equipements all as specified and directed by Engineer-in-Charge :- Fire fighting hydrant pumps 75 HP each - 02 Nos. Sprinkler pump 50 HP - 01 No. Quartzoid sprinklers - 900 Nos. Fire hoses with boxes - 21 Nos. MS ERW piping and GI tubing Jockey pumps 05 HP each - 02 Nos.
SCHEDULE PART-III Supply and charging of fresh gas R-410 for VRF unit complete all as sepcified and directed Engr-in-Charge.
Supply and fixing Noise filter for out door units of VRF 12 to 18 HP cap unit suitable for Out Door Unit as per existing model and make at site including testing complete all as sepcified and directed Engr-in-Charge.
Supply and fixing Fan board as per existing model and make at site for out door units of VRF 12 to 18 HP unit suitable for out door as per existing model and make at site including testing complete all as sepcified and directed Engr-in-Charge.
Supply and fixing Condensor coil for Out door units of VRF Unit suitable for Out Door Unit as per existing model and make at site including leak testing by using nitrogen gas complete all as per OEM instructions and directed by Engineer-in-Charge
Supply and fixing PCB for four way casette/hiwall type indoor units of VRF Unit suitable for INDOOR UNIT as per existing model and make at site including testing complete all as sepcified and directed Engr-in-Charge.
Supply and fixing blower motor for four way casette/hiwall type indoor units of VRF unit suitable for INDOOR UNIT as per existing model and make at site including testing complete all as sepcified and directed Engr-in-Charge.
Supply and fixing drain pump for four way casette/hiwall type indoor units of VRF unit suitable for existing INDOOR UNIT including testing complete all as sepcified and directed Engr-in-Charge.
Supply and fixing invertor board, for out door units of VRF 12 to 18 HP unit suitable for Out Door Unit as per existing model and make at site including testing complete all as sepcified and directed Engr-in-Charge.
Supply and fixing control board , for out door units of VRF 12 to 18 HP unit suitable for Out Door Unit as per existing model and make at site including testing complete all as sepcified and directed Engr-in-Charge.
Supply and fixing remote controller for four way casette/hiwall type indoor units of VRF unit suitable for INDOOR UNIT as per existing model and make at site including testing complete all as sepcified and directed Engr-in-Charge.
Supply and fixing compressor power three phase Voltage 380 - 440 Volt & frequency 50 Hz & Ref- R- 410 A for out door units of VRF 12 to 18 HP unit Unit as per existing model and make at site including testing complete all as sepcified and directed Engr-in-Charge.
Dismantling the leaking condenser from 100TR capacity AC plant replacing with the new air cooled condenser of size 198cm x 112cm x4 row made out of copper tube and aluminium fines. Reconnecting the condenser including brazing/welding inlet and outlet connections. Leak test, pressure test with nitrogen. Vaccumizing & gas charging with F22 refrigerant & testing on load complete as per manufacturers instrutions
Supply and install, testing and commissioning Expansion valve as per existing model and make at site including taking down unserviceable valve complete all as specified and directed by Engineer-in-Charge at Command Post building including testing complete all as sepcified and directed Engr-in-Charge.
Material & labour for pumping down the plant to preserve the existing refrigerant gas & leak testing of plant by charging of Nitrogen gas in to entire plant & monitoring for 24 hrs to find out the leakages rectification of leakage by brazing & replacement of necessary gasket packing as wherever required including copper tubes of suitable size vacuumising of the plant by vacuum pump & keeping 24 hrs for testing including rectification of leakages if any and finally recharging of existing refrigerant gas to the plant and and topping up of refrigerant if required to maintain the standard back pressure complete testing of the plant for smooth functioning complete all as specified & as directed by Engineer-in-Charge.
Supply & charge refrigerant (R - 22) gas for AC Plant complete all as specified & as directed by Engineer-in-Charge.
Supply of fresh compressor oil for replacement of compressor oil suitable for existing compressors complete all as sepcified and directed Engr-in-Charge.
Supply and fixing in repair Delivery/Liquid line valve, 40 mm dia, suitable for Unit as per existing model and make at site complete all as specified & directed by Engineer-in-Charge.
Supply and fixing in repairs power contactors, three phase, 415V as per existing model and make at site complete all as sepcified and directed Engr-in-Charge.
Supply and fixing in repairs power contactors, three phase, 415V as per existing model and make at site complete all as sepcified and directed Engr-in-Charge.
Supply and fixing in repairs power contactors, three phase, 415V as per existing model and make at site all as specified and directed by Engineer-in-Charge
Supply and fixing in repairs oil seal assembly suitable for as per existing model and make at siteall as specified and directed by Engineer-in-Charge.
Supply and fixing in repairs of unserviceable AHU pre-filters 10 microns , suitable for AHUs all as specified and directed by Engineer-in-Charge.
Rewinding of unserviceable electric motor 3 phase 50 Hz, 415volt of following capacity pump set motor complete comprises as under :- (a) Disconnecting & removing the electric motor from installed position including, loading, unloading and transporting to approved workshop. (b) Taking out the existing burnt winding from the motor including rewinding complete with super enameled copper winding wire of existing gauge including all insulating material such as insulation paper, sleeves, tape, varnish etc. complete for class 'F' insulation. (c) Transporting the motor back to the location, reinstalling in original position including leveling and alignment, electrical & water connection, commissioning and testing for 08 hours continuously to check the RPM etc. to the satisfactory performance etc. complete. NOTE: Any damage caused during handling will be made good by contractor without any extra cost to department
50HP Fire Fighting Pump Motor
20 HP Condenser Pump Motor
15 HP Pump Motor
5 HP AHU Blower Motor
Over hauling of Monoblock pump set after removing from the base plate, disconnecting from pipe line, dismantling the pump set, replacing unserviceable gland packing, gun metal bush bearing water seal applying grease etc. complete and reassembling the pump set connecting with pipe line reconnection of electric supply, including buts bolts, gaskets etc. complete testing of pumps for smooth functioning with following capacity of pumps and motors:-
50HP Fire Fighting Pump
20 HP Condenser Pump
15 HP Pump
Supply and fixing in repair of AHU blower motor V belts, size A 36 to A 40 as per existing model and make at site all as specified and directed by Engineer-in-Charge .
Supply and fixing in repair of AHU blower motor V belts, size A 43 all as specified and directed by Engineer-in-Charge as per sizes A 41 to A 45 Make: As per sample/or as existing at site
Taking down old unserviceable/deteriorated insulation from duct, cleaning the duct surface with steel wire brush to remove dirt, dust and make it free of scale, greases and foreign matter etc and supply and fix nitrile rubber insulation one layer of 19mm thickness sticking on surface of duct / pipe line by using best quality adhesive and sealing the joints by weather proof tape complete all as directed by Engineer- in- Charge.
Supply and fixing in repairs of LP/HP cutout switch sensor all as specified and directed by Engineer-in-Charge
Supply and fixing in repairs pressure gauge of capacity 0 to 30 Kg / square centimeter complete with necessary accessories all as specified & directed by Engineer-in-Charge
Supply and fixi ng in repairs air /return air of aluminium rectangular grills complete with wooden frame work made out of II nd class hard wood, volume control damper including gasket and connected accessories complete all as directed by Engineer-in-Charge.
Material and labour for Cleaning of Air handling ducts (GI/Al) internally by using special T&P like robortic arm, air compressor, air jet nozzles, flipper, vaccum pump and a suction blower with hepa filter and check before and after the cleaning complete all as specified and directed
Material and labour for repair/overhauling including replacement of unserviceable spares of 200 TR capacity, air-cooled type chiller package, with reciprocating compressor AC Plant by dismantling complete assembly, after pumping down refrigerant R-22, checking of all spares and segregate of serviceable and unserviceable spares overhauling the compressor including replacement of unserviceable spares, also including machining of crank shaft bearing, polishing, replacing of gaskets packing, reassembling complete and recharging of pumped down Refrigerant, also charging of additional refrigerant upto the required pressure & topping up if required to maintain the required standing charged pressure of compressor oil and gas, testing for smooth functioning etc, complete all as specified and directed. Location : HQ WNC (Note: Cost of all the elements (material cost as well as labour cost) for making the compressors completely functional except the following shall be deemed to be included in the quoted rates : (a) Supply only spares for compressor reciprocating type included under item Nos 40.01 to 40.20 here-in-after. (b) Supply only additonal refrigerant required for recharging of pumped down refrigerant, if required and paid under relevent item here-in-after. (c) Charging fesh compressor oil upto level, measured and paid under relevent item here-in-after as Supply only.
Crank shaft Model No 5H120
Piston Part No 02-B
Oil scraper rings Part No 02-D
Main bearing & sealing bearing (Set of two) Part No 03-C
Liner assembly set Part No 03-D
Oil pump assembly Part No 03-E
Rocker Arm Part No 04-B
Loader/unloader spring Part No 05-C
Piston pin, Part No 11-Y/2
Suction valve reeds Part No 11-E&F
Discharge valve reeds Part No 11-C
Oil filter Part No 05-D
Suction strainer Cat Part No 07-B
Oil pressure regulating valve set Part No 08-A
Connecting rod Part No 08-B
Half section bushing for connecting rod Part No 09-B
Gasket set Part No 09E
Compressor safety valve/Bypass Valve Part No 10-A To G
Shaft seal assembly Part No 10-A To G
Piston rings Part No 10-A To G
SCHEDULE A PART-IV Supplying , installation, Testing & Commissioning of Addressable 3 Loop Fire Alarm Panel expandable upto 5 loop the control panel shall support up to five analogue addressable loops with the capability to control 495 analogue sensors and 495 addressable modules, giving the maximum capacity of 990 addresses,The panel shall have 14 general panel status LED’s. An alphanumeric liquid crystal display shall give 80 charactersof information on a 2-line display. The display will be illuminated to aid viewing under dim ambient light conditions. 20 number zonal fire indicators(LED’s) and 20 number zonal fault/test/disabled (LED’s) shall be provided.An on- board hanumeric keypad with 17 keys shall allow the complete control and configuration of the system. Alternatively the panel shall be programmedusing PC based upload/download software. Four separate pushbuttons shallprovide control of Sound Alarms (Evacuate), Silence/Resound, Mute/Accept and Reset, and shall be located adjacent to the main LED indication. UL listed FM networkable with existing pannel complete all as specified and as directed.
Supply and fix rubberized fabric reinforced rubber lined fire hose (RRL Hose) including gunmetal male and female instantaneous type of coupling hose confirming to IS 636 type II and coupling confirming IS 903-1975 in all respect 15 mtr long including taking out unserviceable item complete all as specified and as directed by Engineer-in-Charge
Supply and fixing in repairs Branch pipe nozzle gun metal 63mm instantaneous inlet, made threaded outlet complete all as specified and as directed by Engineer-in-Charge
Supply and fixing in repairs Fire Hydrant valve double headed gun metal suitable for 100 mm pipe sections complete all as specified and as directed by Engineer-in-Charge
Supply and fixing in repairs Fire Hydrant valve single headed gun metal suitable for 100 mm pipe sections complete all as specified and as directed by Engineer-in-Charge
Supply and fix in repairs wall mounted 18 gauge thick powder coated with post office red colour M.S cabinet of size 800mm x 600mm x 250mm for housing 02 Nos in lengths of 15mt long each canvass hoses and branch pipes with glass and locking arrangement complete all as specified and as directed by Engineer-in-Charge
Supply and fixing in repairs damaged glass panes 6 mm thick suitable for existing fire cabinet indoor type complete all as specified and as directed by Engineer-in-Charge.
Supply and fixing in repairs Fire Brigade inlet connection 2 way complete all as specified and as directed by Engineer-in-Charge
Supply and fixing in repairs Gun metal cover assembly of fire hydrent valve complete all as specified and as directed by Engineer-in-Charge
Supply and fixing in repairs gun metal spindle for 63mm size fire hydrent valve with washes, bush, check nuts etc for complete all as specified and as directed by Engineer-in-Charge
Supply and fixing in repairs mouth washers for 63 mm size fire hydrent complete all as specified and as directed by Engineer-in-Charge
Supply and fixing in repairs Addressable Multisensor detector ( Photo + Thermal) with base with galvanised steel, back box, and all mounting accessories all as specified and directed by Engineer-in-Charge.
Supply and fixing in repairs Addressable Control Modules with 230V 2A relay with junction box and all mounting accessories all as specified and directed by Engineer-in-Charge.
Supply and fixing in repairs Addressable Manual call point (MCP) with back box and all mounting accessories all as specified and directed by Engineer-in-Charge.
Supply and fixing in repairs Addressable Hooter cum strobe and all mounting accessories all as specified and directed by Engineer-in-Charge.
Supply and fixing in repairs Addressable Fault isolator module and all mounting accessories all as specified and directed by Engineer-in-Charge.
Supply and fixing in repairs Battery of capacity 42 / 26 AH ,12 Volts suitable for fire fighting system panel complete all as specified and as directed by Engineer-in-Charge
Supply and laying in repairs copper conductor multi strand armoured cable 2 core 1.5 sqmm Red colour complete all as specified and as directed by Engineer-in-Charge
Supply and fixing in repairs drum type wall mounted hose reels, swinging 180 degrees conforming to IS:884 with ISI mark consisting of 20mm dia x 30 mtr long, branded rubber hose pipe with 6.3 mm dia bronze shut off type jet nozzle, making connection to the vertical riser by cutting welding, including providing 20mm dia shut off valve, fixing the hose reel with necessary anchor fastners by drilling holes in walls /RCC, making good the damaged surfaces matching with existing complete all as per direction of the Engineer-in-Charge.
cooltech engineering services
BRITE INDUSTRIES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .