| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76.6 LAccepted-AOC GRAM KANETHU BUJURG PO BARGADWA BASTI UTTAR PRADESH 272194 | BASTI | UTTAR PRADESH | 272194 | ₹76.6 L | L1 | Accepted-AOC AS UPLOADED |
| 2 | L2₹80.7 LRejected-AOC | ₹80.7 L | L2 | Rejected-AOC AS UPLOADED |
| 3 | L3₹85.3 LRejected-AOC BARAINI KACHHAWAN MIRZAPUR | MIRZAPUR | MIRZAPUR | UTTAR PRADESH | 231001 | ₹85.3 L | L3 | Rejected-AOC AS UPLOADED |
| 4 | L4₹86.8 LRejected-AOC 864 JAWAHAR NAGAR GORAKHPUR UTTAR PRADESH | ₹86.8 L | L4 | Rejected-AOC AS UPLOADED |
| 5 | L5₹1.0 CrRejected-AOC | ₹1.0 Cr | L5 | Rejected-AOC AS UPLOADED |
| Sl No | Description | Qty | Unit | Pratap Narayan Mishra L1 | YASHWANT SINGH L4 | M/S RAM LAKHAN L2 | M/s Reena Singh L6 | M/S SANTOSH KUMAR SINGH L3 | SHIVENDRA CNSTRUCTION L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Earth work in cutting for making proper slope and profile with dressing including cost of all lead and lift, labour, T&P etc. complete with proper disposal of earth required for proper completion of work as per drawing in direction of Engineer in charge. | 7,718.34 | m3 | 45.5 ₹3,51,184.47 | 20 ₹1,54,366.8 | 35.4 ₹2,73,229.24 | 48.5 ₹3,74,339.49 | 39 ₹3,01,015.26 | 46 ₹3,55,043.64 |
| 1.02 | Earth work in filling with complete dressing and manual compaction over geobag pitching for protection U/V rays and sunlight including lift upto 1.5m and lead upto 30m cost of all material, earth ,labour T&P etc required for proper completion of work as per drawing in direction of Engineer in charge. | 582.93 | m3 | 41.3 ₹24,075.01 | 40 ₹23,317.2 | 41.1 ₹23,958.42 | 55.29 ₹32,230.2 | 44.6 ₹25,998.68 | 52.44 ₹30,568.85 |
| 1.03 | Providing & laying hdpe woven bag filled with silt/sandy soil in nylon crate of size 1.00mX1.00mX1.00m with mesh size 20cm X20cm and weight not less than 165 gram per no. in construciton of base of launching apron including cost of all matterial ,labour ,carriage T&P etc required for proper completion of work complete as per drawing in direction of Engineer in charge. | 2,898.25 | m3 | 585.9 ₹16,98,084.68 | 700 ₹20,28,775 | 636 ₹18,43,287 | 836.62 ₹24,24,733.92 | 672.7 ₹19,49,652.78 | 797.81 ₹23,12,252.83 |
| 1.04 | Providing filling and placing of Geotextile tube of size 3.00 m dia , 20m long made of 80KN bi-axial strength multifilament woven geotextile as confirming is code 16393:2015 (technofab, Garware, Geofab etc) with sand by mud pump at design slope of affected reach upto 500 m as per drawing in direction of Engineer in charge. | 42 | Nos | 45,360 ₹19,05,120 | 50,000 ₹21,00,000 | 46,645.2 ₹19,59,098.4 | 61,110 ₹25,66,620 | 49,140 ₹20,63,880 | 57,645 ₹24,21,090 |
| 1.05 | Providing filling and placing of Geotextile tube of size 3.00 m dia , 10m long made of 80KN bi-axial strength multifilament woven geotextile as confirming is code 16393:2015 (technofab, Garware, Geofab etc) with sand by mud pump at design slope of affected reach upto 500 m as per drawing in direction of Engineer in charge. | 6 | Nos | 28,764 ₹1,72,584 | 40,000 ₹2,40,000 | 31,318.92 ₹1,87,913.52 | 41,031 ₹2,46,186 | 32,994 ₹1,97,964 | 38,916 ₹2,33,496 |
| 1.06 | Providing & laying Geo textile Bag 200 gsm woven polypropylene Geotextile in size (1.00x0.75)M filled with local earth including cost of all material, earth, labour, T&P etc required for proper completion of work as per drawing in direction of Engineer in charge. | 13,766.4 | m2 | 254.85 ₹35,08,367.04 | 300 ₹41,29,920 | 275 ₹37,85,760 | 361 ₹49,69,670.4 | 290 ₹39,92,256 | 344.64 ₹47,44,452.1 |
Tender Value
Refer Docs
EMD Value
₹2.2 L
Closing Date
13 Mar 2026, 2:00 pmClosed
SUPERINTENDING ENGINEER
GANDAK IRRIGATION WORKS CIRCLE-2, GORAKHPUR(U.P)
Anti-Erosion Work Between Km 2.800 To Km 3.100 Of Anantpur Badhara Bund On Left Bank Of River Rohin In District Maharajganj
2026_UPIDC_1122376_25
05/SE/2025-26
Open Tender
Civil Works
60 days
Maharajganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,449
₹2.2 L
GORAKHPUR
9 Apr 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
7 Mar 2026
Earth work in cutting for making proper slope and profile with dressing including cost of all lead and lift, labour, T&P etc. complete with proper disposal of earth required for proper completion of work as per drawing in direction of Engineer in charge.
Earth work in filling with complete dressing and manual compaction over geobag pitching for protection U/V rays and sunlight including lift upto 1.5m and lead upto 30m cost of all material, earth ,labour T&P etc required for proper completion of work as per drawing in direction of Engineer in charge.
Providing & laying hdpe woven bag filled with silt/sandy soil in nylon crate of size 1.00mX1.00mX1.00m with mesh size 20cm X20cm and weight not less than 165 gram per no. in construciton of base of launching apron including cost of all matterial ,labour ,carriage T&P etc required for proper completion of work complete as per drawing in direction of Engineer in charge.
Providing filling and placing of Geotextile tube of size 3.00 m dia , 20m long made of 80KN bi-axial strength multifilament woven geotextile as confirming is code 16393:2015 (technofab, Garware, Geofab etc) with sand by mud pump at design slope of affected reach upto 500 m as per drawing in direction of Engineer in charge.
Providing filling and placing of Geotextile tube of size 3.00 m dia , 10m long made of 80KN bi-axial strength multifilament woven geotextile as confirming is code 16393:2015 (technofab, Garware, Geofab etc) with sand by mud pump at design slope of affected reach upto 500 m as per drawing in direction of Engineer in charge.
Providing & laying Geo textile Bag 200 gsm woven polypropylene Geotextile in size (1.00x0.75)M filled with local earth including cost of all material, earth, labour, T&P etc required for proper completion of work as per drawing in direction of Engineer in charge.
stage.html
html • 0.05 MB
techsummary_2089977.pdf
BOQ Comparative Chart
xlsx
finsummary_2089977.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
25.pdf
Tender Documents • 1.87 MB
BOQ_2089977.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid