Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81,274.80Accepted-Finance | ₹81,274.80 | L1 | Accepted-Finance LOW |
| 2 | L2₹87,043.40Accepted-Finance | ₹87,043.40 | L2 | Accepted-Finance HIGH |
| 3 | L3₹90,225.90Accepted-Finance | ₹90,225.90 | L3 | Accepted-Finance HIGH |
| Sl No | Description | Qty | Unit | M/s zha & sons L1 | K. M. Gandhi L3 | A J Enterprises L2 |
|---|---|---|---|---|---|---|
| 0.00Items : | ||||||
| 1.00 | ACC Cement 53 Gred ( I.S.I.) | 1 | Per Bag | 300 ₹354 | 320 ₹377.60 | 310 ₹365.80 |
| 2.00 | ULTRATECH Cement 53 Gred ( I.S.I.) | 1 | Per Bag | 330 ₹389.40 | 350 ₹413 | 340 ₹401.20 |
| 3.00 | Ambuja Cement 53 Gred ( I.S.I.) | 1 | Per Bag | 340 ₹401.20 | 360 ₹424.80 | 350 ₹413 |
| 4.00 | Bricks (Red) | 1 | Per Thousand | 8,000 ₹8,400 | 9,000 ₹9,450 | 8,500 ₹8,925 |
| 5.00 | Bricks (ASH) | 1 | Per Thousand | 7,000 ₹7,350 | 8,000 ₹8,400 | 7,500 ₹7,875 |
| 6.00 | Bricks (Cement) | 1 | Per Thousand | 15,000 ₹15,750 | 16,500 ₹17,325 | 16,000 ₹16,800 |
| 7.00 | GI Sheet | 1 | Per Sq.Mtr | 850 ₹1,003 | 950 ₹1,121 | 900 ₹1,062 |
| 8.00 | Sand Kanhan | 1 | Per Cu.Mtr | 1,900 ₹1,995 | 2,000 ₹2,100 | 1,950 ₹2,047.50 |
| 9.00 | Sand Black | 1 | Per Cu.Mtr | 2,200 ₹2,310 | 2,300 ₹2,415 | 2,250 ₹2,362.50 |
Tender Value
Refer Docs
Closing Date
27 Apr 2026, 3:40 pmClosed
SARPANCH/SACHIV
AT POST-GP-DAHEGAON(R), TA- SAONER, DIST-NAGPUR
SUPPLY OF CONSTRUCTION MATERIAL AT GP/DAHEGAON R/ZP/NGP/TENDER NO1/2026-27/1st CALL
2026_NAGPU_1296919_1
ZP/NGP/GP/DAHEGAON(R)/SUPPLY OF CON MATERIAL/TENDER/ NO1/2026-27
Open Tender
Consumables
7 days
GP-DAHEGAON(R)
PLEASE REFER THE NIT DOCUMENT
3 documents required · 3 mandatory
₹0
Yes
GP-DAHEGAON(R)
28 Apr 2026
21 Apr 2026
28 Apr 2026
21 Apr 2026
27 Apr 2026
21 Apr 2026
21 Apr 2026
Select, Excess (+), Less (-)
Tender Inviting Authority: Sarpanch/Gramsevak Grampanchayat Dahegaon(R), Panchayat Samiti Saoner, Dist Nagpur
Name of Work: Supply Of Construction Material For All Scheme At GP Dahegaon(R), Ta Saoner, Dist Nagpur
Contract No: ZP/NGP/GP/DAHEGAON(R)/SUPPLY OF CONSTRUCTION MATERIAL FOR ALL SCHEME /TENDER/ NO1/2026-27
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder in Rs. P Excise Duty Amount in INR Rs. P GST Amount in INR Rs. P Freight Charges ( Unloading & Stacking) in Rs. P Any Other Taxes in Rs. P Any Other Duties/Levies in Rs. P IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1 ACC Cement 53 Gred ( I.S.I.) Item 1 Per Bag Excess(+) Full Conversion INR
2 ULTRATECH Cement 53 Gred ( I.S.I.) Item 2 Per Bag Excess(+) Full Conversion INR
3 Ambuja Cement 53 Gred ( I.S.I.) Item 3 Per Bag Excess(+) Full Conversion INR
4 Bricks (Red) Item 4 Per Thousand Excess(+) Full Conversion INR
5 Bricks (ASH) Item 5 Per Thousand Excess(+) Full Conversion INR
6 Bricks (Cement) Item 6 Per Thousand Excess(+) Full Conversion INR
7 GI Sheet Item 7 Per Sq.Mtr Excess(+) Full Conversion INR
8 Sand Kanhan Item 8 Per Cu.Mtr Excess(+) Full Conversion INR
9 Sand Black Item 9 Per Cu.Mtr Excess(+) Full Conversion INR
10 Soft Murum Item 10 Per Cu.Mtr Excess(+) Full Conversion INR
11 Hard Murum Item 11 Per Cu.Mtr Excess(+) Full Conversion INR
12 Soil (Red) Item 12 Per Cu.Mtr Excess(+) Full Conversion INR
13 Soil (Black) Item 13 Per Cu.Mtr Excess(+) Full Conversion INR
14 Dust Item 14 Per Cu.Mtr Excess(+) Full Conversion INR
15 Metal 10 mm Item 15 Per Cu.Mtr Excess(+) Full Conversion INR
16 Metal 20 mm Item 16 Per Cu.Mtr Excess(+) Full Conversion INR
17 Metal 40 mm Item 17 Per Cu.Mtr Excess(+) Full Conversion INR
18 Metal 60 mm Item 18 Per Cu.Mtr Excess(+) Full Conversion INR
19 Metal 80 mm Item 19 Per Cu.Mtr Excess(+) Full Conversion INR
20 Steel 6 mm Item 20 Per Kg Excess(+) Full Conversion INR
21 Steel 8 mm TMT Fe 500 Item 21 Per Kg Excess(+) Full Conversion INR
22 Steel 10 mm TMT Fe 500 Item 22 Per Kg Excess(+) Full Conversion INR
23 Steel 12 mm TMT Fe 500 Item 23 Per Kg Excess(+) Full Conversion INR
24 Steel 16 mm TMT Fe 500 Item 24 Per Kg Excess(+) Full Conversion INR
25 Steel Gril Work Item 25 Per Kg Excess(+) Full Conversion INR
26 Kota Stone Item 26 Per Sq.mtr Excess(+) Full Conversion INR
27 Tiles Vetryfide (2*2 Fit) Item 27 Per Sq.Mtr Excess(+) Full Conversion INR
28 Pelving Block Hydrolick Mode Item 28 Per Sq.Mtr Excess(+) Full Conversion INR
29 Pelving Block Rubber Mode Item 29 Per Sq.Mtr Excess(+) Full Conversion INR
30 Cement Paver Blocks 60 mm Item 30 Per Sq.fit Excess(+) Full Conversion INR
31 RCC Cement Pipe 250 mm Item 31 Runing Meter Excess(+) Full Conversion INR
32 RCC Cement Pipe 300 mm Item 32 Runing Meter Excess(+) Full Conversion INR
33 RCC Cement Pipe 450 mm Item 33 Runing Meter Excess(+) Full Conversion INR
34 RCC Cement Pipe 600 mm Item 34 Runing Meter Excess(+) Full Conversion INR
35 RCC Cement Pipe 900 mm Item 35 Runing Meter Excess(+) Full Conversion INR
36 Centring Tar Item 36 Per Kg Excess(+) Full Conversion INR
37 Mixure Machine Item 37 Per Day Excess(+) Full Conversion INR
38 Vibratar Item 38 Per Day Excess(+) Full Conversion INR
39 Roller Item 39 Per Day Excess(+) Full Conversion INR
40 JCB Item 40 Per Hour Excess(+) Full Conversion INR
41 Water Tanker 6000 Ltr Item 41 Per Trip Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select %
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_2227946.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid