18 Dec 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PR & CC
MECHANICAL WORKS AT BARHI
20000711-HD-10157
20000711-HD-10157
Open Tender
Two Bid
Balod, Chhattisgarh
₹0
Exempted
18 Dec 2020
27 Nov 2020
18 Dec 2020
18 Dec 2020
28 Nov 2020 - 8 Dec 2020
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 361 | SITC of Air Filter Regulator | SITC of Air Filter Regulator — REGULATOR,FILTER; TYPE:AIR/COMBINED; MATERIAL,BODY:DIE CAST ALUMINIUM ALLOY; PRESSURE,INLET:4 TO 6 KG/CM2; PRESSURE,OUTLET:0.7 TO 4.2 KG/CM2; SIZE,INLET/OUTLET:1/4 IN FEMALE NPT; SIZE,FILTER ELEMENT:5 MICRON; MAX PRESSURE RATING:18 KG/CM2,1.REGULATION TYPE:COMBINED FILTER AND REGULATOR WITH BUILT IN DRAIN,COCK AND 50 MM DIAL OUTPUT GAUGE;SELF REGULATING,SPRING AND DIAPHRAGM,INTERMITTENT BLEED,2.SERVICE:INSTRUMENT AIR,3.MAX AIR SUPPLY PRESSURE:18 KG/CM2 TO 21 KG/CM2,OUTLET PRESSURE:10 TO 60 PSIG,ADJUSTING RANGE:0.7 TO 4.2 KG/CM2/10 TO 60 PSIG,OUTPUT GAUGE SIZE:40 TO 50 MM,RANGE OF OUTPUT GAUGE:0 TO 4 KG/CM2/0 TO 60 PSIG,DUAL SCALE,OUTER DIAL MARKING KG/CM2 AND INNER DIAL,MARKING PSIG 9.RANGE ADJUSTMENT : HAND WHEEL WITH LOCK NUT,DRAIN COCK:REQUIRED,(INPUT AND OUTPUT PORT CONNECTIONS),ENCLOSURE:WEATHER PROOF TO IP-65,END CONNECTIONS:ONE INLET,ONE OUTLET AND ONE PRESSURE GAUGE PORT,BOWL AND CAPACITY:METALLIC AND CAPACITY 130CC(APPROX),AMBIENT TEMPERATURE:80 DEG C AND MAX 180 DEG C,ADJUSTMENT KNOB WITH NUT:UNBREAKABLE PLASTIC MOULDED ON C.S STEM,SPRING CASE AND FILTER BOWL:DIE CAST ALUMINIUM ALLOY,FILTER MATERIAL:SINTERED BRONZE,MAIN VALVE:NEOPRENE MOULDED ON SS STEM,DRAIN VALVE:BRASS-MANUAL,MAIN VALVE SPRING (INNER VALVE ASSEMBLY):SS,DIAPHRAGM:NYLON REINFORCED NEOPRENE/BUNA N NYLON INSERTION,MAIN SPRING:SPRING STEEL,ACCURACY:+ OR 5% FSD (OR) LOWER,REGULATION AND FLOW CHARACTERISTICS:VENDORS STANDARD,MOUNTING BRACKETS WITH U CLAMPS,BOLTS,NUT ETC,SUITABLE FOR 2 INCH PIPE MOUNTING SHALL BE SUPPLIED FOR EACH AIR FILTER REGULATOR,NOTES:1.AIR FILTER REGULATOR SHALL BE SUITABLE FOR 2 INCH PIPE MOUNTING,2.OUTPUT GAUGE 40 TO 50 MM DIAL SIZE WITH DUAL SCALE MARKINGS,0 TO 4 KG/CM2/0 TO 60 PSIG.OUTER SCALE IN KG/CM2 AND INNER SCALE IN PSIG.OUTPUT GAUGE SHOULD BE INTEGRAL WITH THE AIR FILTER REGULATOR AND SHOULD BE FIXED ON THE AIR FILTER REGULATOR.3.MINIATURE(SMALL SIZE) AIR FILTER REGULATORS ARE NOT ACCEPTABLE | - | Each |
| 362 | S&I 6"GLY SS PRE.GAUGE 0- | S&I 6"GLY SS PRE.GAUGE 0- — GAUGE,PRESSURE; MOUNTING:FLUSH PANEL; RANGE:0-16 KG/CM2; SIZE,DIAL:150 MM; TYPE,SENSING ELEMENT:BOURDON; CONNECTION,PROCESS:1/2 INCH MALE NPT; MAT,CASE:CAST ALUMINIUM; WEATHER PROOF,SENSING ELEMENT MATERIAL:STAINLESS STEEL 316,MOVEMENT ELEMENT MATERIAL:STAINLESS STEEL 304,ACCURACY:+/- 0.5% OF SCALE RANGE | - | Each |
| 363 | S&I 6" GLY SS PRE.GAUGE 0- | S&I 6" GLY SS PRE.GAUGE 0- — GAUGE,PRESSURE; TYPE:DIAPHRAGM SEALED; MOUNTING:DIRECT,BOTTOM ENTRY; RANGE:0-25 KG/CM2; SIZE,DIAL:150 MM; TYPE,SENSING ELEMENT:BOURDON; CONNECTION,PROCESS:3/4 INCH FEMALE NPT; MAT,WETTED PARTS:STAINLESS STEEL 316; ACCURACY:+/-1% OF FSD,DIAL MATERIAL:LAMINATED PLASTIC,DIAL COLOUR:WHITE BACKGROUND WITH BLACK NUMERALS,SENSING ELEMENT MATERIAL:AISI STAINLESS STEEL 316,DIAPHRAGM MATERIAL:AISI STAINLESS STEEL 316,DIAPHRAGM MOVEMENT MATERIAL:AISI STAINLESS STEEL 304,END CONNECTION MATERIAL:AISI STAINLESS STEEL 316,UPPER FLANGE MATERIAL:AISI STAINLESS STEEL 304,LOWER FLANGE MATERIAL:AISI STAINLESS STEEL 316,BEZEL:WEATHER PROOF HOUSING STOVE ENAMELLED BLACK FINISH,WINDOW MATERIAL:SHATTER PROOF GLASS(TOUGHENED),MAXIMUM TEMPERATURE:250 DEG.C,OTHER REQUIREMENTS:(1)ZERO ADJUSTMENT SCREW:MICROMETER POINTER,BLOW OFF DISC:YES,JOINTS:ARGON ARC WELDED,STRESS RELIEVING:ALL BOURDON TUBES ARE HEAT TREATED FOR STRESS RELIEVING,STRESS RELIEVING CERTIFICATE TO BE FURNISHED | - | Each |
| 364 | S&I 6" GLY SS PRE.GAUGE 0- | S&I 6" GLY SS PRE.GAUGE 0- — GAUGE,PRESSURE; TYPE:THREADED; MOUNTING:N/A; RANGE:UP TO 10 KG; SIZE,DIAL:4 IN; CONNECTION,PROCESS:N/A; LIQUID FILLING:GLYCERINE; NEEDLE VALVE-AIR BLOCK REMOVAL, PRESSURE GAUGE CALIBRATION NOZZLE, CALIBRATED PRESSURE GAUGE, 120% PRESSURE WITHSTAND CAPACITY, | - | Each |
| 365 | S&I 4" GLY SS PRE.GAUGE 0- | S&I 4" GLY SS PRE.GAUGE 0- — GAUGE,PRESSURE; TYPE:DIAPHRAGM SEALED; MOUNTING:DIRECT,BOTTOM ENTRY; RANGE:0-40 KG/CM2; SIZE,DIAL:150 MM; TYPE,SENSING ELEMENT:BOURDON; CONNECTION,PROCESS:3/4 INCH FEMALE NPT; MAT,WETTED PARTS:STAINLESS STEEL 316; ACCURACY:+/-1% OF FSD,DIAL MATERIAL:LAMINATED PLASTIC,DIAL COLOUR:WHITE BACKGROUND WITH BLACK NUMERALS,SENSING ELEMENT MATERIAL:AISI STAINLESS STEEL 316,DIAPHRAGM MATERIAL:AISI STAINLESS STEEL 316,DIAPHRAGM MOVEMENT MATERIAL:AISI STAINLESS STEEL 304,END CONNECTION MATERIAL:AISI STAINLESS STEEL 316,UPPER FLANGE MATERIAL:AISI STAINLESS STEEL 304,LOWER FLANGE MATERIAL:AISI STAINLESS STEEL 316,BEZEL:WEATHER PROOF HOUSING STOVE ENAMELLED BLACK FINISH,WINDOW MATERIAL:SHATTER PROOF GLASS(TOUGHENED),MAXIMUM TEMPERATURE:250 DEG.C,OTHER REQUIREMENTS:(1)ZERO ADJUSTMENT SCREW:MICROMETER POINTER,BLOW OFF DISC:YES,JOINTS:ARGON ARC WELDED,STRESS RELIEVING:ALL BOURDON TUBES ARE HEAT TREATED FOR STRESS RELIEVING,STRESS RELIEVING CERTIFICATE TO BE FURNISHED | - | Each |
| 366 | S&I 4" GLY SS PRE.GAUGE 0- | S&I 4" GLY SS PRE.GAUGE 0- — GAUGE,PRESSURE; TYPE:DIAPHRAGM SEALED; MOUNTING:DIRECT,BOTTOM ENTRY; RANGE:0-16 KG/CM2; SIZE,DIAL:150 MM; TYPE,SENSING ELEMENT:BOURDON; CONNECTION,PROCESS:3/4 INCH FEMALE NPT; MAT,WETTED PARTS:STAINLESS STEEL 316; MAT,CASE:CAST ALUMINIUM; ACCURACY:+/-1% OF FSD,DIAL MATERIAL:LAMINATED PLASTIC,DIAL COLOUR:WHITE BACKGROUND WITH BLACK NUMERALS,SENSING ELEMENT MATERIAL:AISI STAINLESS STEEL 316,DIAPHRAGM MATERIAL:AISI STAINLESS STEEL 316,DIAPHRAGM MOVEMENT MATERIAL:AISI STAINLESS STEEL 304,END CONNECTION MATERIAL:AISI STAINLESS STEEL 316,UPPER FLANGE MATERIAL:AISI STAINLESS STEEL 304,LOWER FLANGE MATERIAL:AISI STAINLESS STEEL 316,BEZEL:WEATHER PROOF HOUSING STOVE ENAMELLED BLACK FINISH,WINDOW MATERIAL:SHATTER PROOF GLASS(TOUGHENED),MAXIMUM TEMPERATURE:250 DEG.C,OTHER REQUIREMENTS:(1)ZERO ADJUSTMENT SCREW:MICROMETER POINTER,BLOW OFF DISC:YES,JOINTS:ARGON ARC WELDED,STRESS RELIEVING:ALL BOURDON TUBES ARE HEAT TREATED FOR STRESS RELIEVING,STRESS RELIEVING CERTIFICATE TO BE FURNISHED | - | Each |
| 367 | S&I 4" GLY SS PRE.GAUGE 0- | S&I 4" GLY SS PRE.GAUGE 0- — GAUGE,PRESSURE; TYPE:CAPILLARY; RANGE:0-16 KG/CM2; SIZE,DIAL:150 MM; TYPE,SENSING ELEMENT:BOURDON; CONNECTION,PROCESS:2 INCH NPT; MAT,WETTED PARTS:STAINLESS STEEL 316; MAT,CASE:ALUMINIUM; STOVED ENAMELLED-BLACK-WEATHER PROOF, BEZEL:ALUMINIUM,WINDOW:SHATTER PROOF-GLASS,ACCURACY:+/- 1.0%,PRESSURE DESIGNATION: CLASS 300,FACING FLANGE:RAISED FACE,DESIGN SPEC:B 16.5,FLANGE MATERIAL:STAINLESS STEEL 316,CAPILLARY WITH ARMOUR LENGTH:2000MM WITH DIAPHRAGM SEAL,OVER RANGE PROTECTION:130% 368 Fab Erect Air Station with Ins 42662- Each 15 998732 Yes AIR LINE PIPING FABRICATION AND INSTALLATION 1 INCH SIZE CS AND GI PIPESCOPE OR WORK:A) CUTTING THE PIPE AND THREADING IF REQUIRED IS IN SCOPE OF JOB.B) PROPER SUPPORTS TO BE PROVIDED WHEREVER REQUIRED. MATERIAL IN HPCL SCOPE.C) TRANSPORTATION TO AND FROM WORKSHOP OR ANY OTHER UNIT IN PLANT PREMISES 369 SI Copper strip 42662- Kilograms 300 998736 Yes SUPPLY AND INSTALLATION OF COPPER BUS BAR TINTED, HALF HARD, FLAT,COPPER CONTENT 99.90 % , WIDTH 50MM AND THICKNESS 10MM. 370 STRUCTURAL STEEL 42662- Metric Ton 25 995455 Yes STRUCTURAL STEEL-SUPPLY, FABRICATION, WELDING AND ERECTION AND PAINTING OF STRUCTURAL STEEL IS:2062 E 250 (FE 410 W) OR HIGHER GRADE A/B COLUMNS/BEAMS, PURLINS, TIES, RAFTERS, PLATFORMS/WALKWAYS/CROSS OVERS/PIPE SUPPORTS/INSERTS /DOWEL BARS OF 32 MM INCLUDING PREPARATION OF ALL NECESSARY FABRICATION DRAWINGS INCLUDING BILL OF MATERIALS; SUPPLY OF STRUCTURAL STEEL CONSISTING OF NON-BQ PLATES, ROLLED STEEL JOISTS, CHANNELS, ANGLES, FLATS, BEAMS, ETC. FIXING OF INSERT PLATES IN RCC/BRICKWORK, STRAIGHTENING OF RAW STEEL IF REQUIRED, PREPARATION OF SUPPLEMENTARY SKETCHES, SUPPLY OF BOLTS, NUTS, WASHERS, SHIMS, PACKS, GAS, WELDING ELECTRODES AND ALL OTHER CONSUMABLES, AS REQUIRED ALL COMPLETE. THE SCOPE INCLUDES LOADING, TRANSPORTATION, UNLOADING AND DELIVERY AT ERECTION SITE OF ALL FABRICATED STRUCTURES, ERECTION, ALIGNMENT AND WELDING OF ALL STRUCTURES TRUE TO LINE, LEVEL, PLUMB AND DIMENSION, INCLUDING RECTIFICATION IF ANY, SPLICING, SITE ASSEMBLY ALL AS PER TECHNICAL SPECIFICATIONS AND DRAWINGS, USE OF ALL SAFETY EQUIPMENTS, HYDRA CRANE, CHAIN PULLEY BLOCKS ETC; CARRYING OUT WELDING PROCEDURE/WELDER QUALIFICATION TESTS; PUG CUTTING/GAS CUTTING; DRILLING HOLES OF SUITABLE SIZE; SUPPLYING AND PROVIDING ERECTION AND PERMANENT BOLTS WITH NUTS AND WASHERS ALL COMPLETE AS PER DRAWINGS AND INSTRUCTIONS OF ENGINEER-IN-CHARGE. UNIT WT WILL BE CONSIDERED AS PER BIS ONLY. IN CASE ACTUAL WT IS LESS THAN WT AS PER BIS, THEN ACTUAL WT WILL BE CONSIDERED FOR MEASUREMENT. SURFACE PREPARATION (EXPOSED AREA OF STEEL MEMBERS AND ATTACHMENTS) BY SAND BLASTING TO SA 2.5 GRADE, PAINTING WITH 2 COATS OF EPOXY PRIMER (TOTAL DFT-75 MICRONS) AND 2 COATS OF APPROVED QUALITY AND SHED EPOXY PAINT (TOTAL DFT-40 MICRONS) OF APPROVED MAKE. APPROVED MFRS OF STRUCTURAL STEEL, CONTRACTOR WILL BE PERMITTED TO CARRY OUT FABRICATION AT AN APPROVED WORKSHOP OUTSIDE HPCL PREMISES AND TRANSPORT SAME. HOWEVER, ALL THE APPLICABLE TAXES AND DUTIES WOULD BE BORNE BY CONTRACTOR AND JOB SHALL BE CARRIED OUT UNDER SUPERVISION OF HPCL/APPROVED TPI. QUOTED RATES ARE DEEMED TO INCLUDE THE ENTIRE SCOPE AS PER ITEM AS DESCRIBED HEREIN ABOVE. 371 HAND RAILS 42662- Metric Ton 3 995477 Yes TUBULAR STEEL HAND RAILING-SUPPLY, FABRICATION, WELDING AND ERECTION OF 40 NOMINAL BORE HEAVY SECTION (4.37 KG/M OR MORE) OR HIGHER PIPE SECTION HAND RAILS FOR STAIRWAYS,LANDING PLATFORMS, ETC ALL COMPLETE AS PER SPECIFICATIONS. THE PIPE HAND RAILS SHALL BE OF STRUCTURAL QUALITY AS PER IS: 1239. PAINTING IS ALSO IN THE SCOPE OF THE ITEM AS PER FOLLOWING SPECIFICATIONS. SURFACE PREPARATION (EXPOSED AREA OF STEEL MEMBERS AND ATTACHMENTS) BY SAND BLASTING TO SA 2.5 GRADE, PAINTING WITH 2 COATS OF EPOXY PRIMER (TOTAL DFT-75 MICRONS) AND 2 COATS OF APPROVED QUALITY AND SHED EPOXY PAINT (TOTAL DFT-40 MICRONS) OF APPROVED MAKE. 372 Supply fabrication GI Gratings 42662- Metric Ton 4 995455 Yes PROVIDING, TRANSPORTING AND FABRICATING AS PER THE SPECIFICATIONS, TOP COATED GALVANIZED IRON GRATING AND TREADS OF THE APPROVED DESIGN AND PATTERN AND ERECTING AND FIXING OF FABRICATED GRATING ON OPERATING FLOORS, PLATFORMS, STAIR LANDINGS AND TREADS, ETC. INCLUDING SUPPLY OF ALL FIXTURES LIKE EDGE PLATES FOR TREADS, CLIPS, STUDS, BOLTS, ETC, INCLUDING NOSING FOR THE TREADS ETC., COMPLETE, AS PER DRAWINGS, SPECIFICATIONS AND AS DIRECTED BY HPCL EIC. ITEMS INCLUDE GRATINGS IN IRREGULAR CUSTOMIZED SIZES, WITH OR WITHOUT INTERMEDIATE PRE-MEASURED CUT-OUTS AS REQUIRED AS PER HPCL ADVISE. (LAYOUT DRAWING TO BE SUBMITTED BY CONTRACTOR) (STRUCTURAL STEEL TO BE SUPPLIED BY CONTRACTOR) (WEIGHT BASIS = 50 KG/M2 FOR GRATING) ) ALL GRATINGS, NUT AND BOLTS SHALL BE GALVANIZED AS PER SPECIFICATION TOP COATED HOT DIPPED GALVANIZED GRATING SHALL BE OF M.S. STEEL. GALVANIZATION SHALL BE DONE IN ACCORDANCE WITH IS 2629 AND TESTED AS PER IS 2633 AND IS 6745. QUALITY OF ZINC COATING SHALL BE MINIMUM 900 G/SQ.M OF SURFACE AREA. FIXING OF GRATINGS SHALL BE BY WELDING. TOUCHUP REPAIRS SHALL BE DONE TO PORTIONS OF SURFACE WHERE GALVANIZING IS DAMAGED. 373 CHEQ PLATES 42662- Metric Ton 3 995475 Yes PROVIDING, SUPPLYING, DETAILING AND FABRICATION AS PER APPROVED FABRICATION DRAWINGS, TRANSPORTING TO SITE AND ERECTING 6 MM THICK MS CHEQUERED PLATES INCLUDING FABRICATION OF SUPPORTING MEMBERS, COUNTERSUNK FIXING SCREWS ETC. COMPLETE WITH ALL MATERIAL SUPPLY BY CONTRACTOR. RATE SHALL BE INCLUSIVE OF FORMING CUT-OUTS IN CHEQUERED PLATES, REINFORCING BY MS STRIPS OF 6 MM THICKNESS AND 75 MM HEIGHT INCLUDING CUTTING, WELDING, FABRICATING ETC. COMPLETE AS PER DRAWING AND AS DIRECTED BY ENGINEER IN CHARGE. CHEQUERED PLATE SHALL CONFORM TO IS:3502.SURFACE PREPARATION TO ST 2 SUPPLY AND APPLICATION OF ONE COAT OF PROTECTOMASTIC OF 100 MICRONS FOLLOWED BY MIO OF 100 MICRONS FOLLOWED BY TWO COATS OF PU OF 25 MICRONS EACH. TOTAL:250 MICRONS. 374 E & C LPG Pumps 120 M3/Hr 42662- Lump Sum 1 998719 Yes 1. ANY NEW EQUIPMENT OR MATERIAL SUPPLIED HAS TO BE INSTALLED AND COMMISSIONED BY THE VENDOR WHO HAS SUPPLIED THE ITEM.2. VENDOR IS REQUIRED TO PROVIDE A LUMPSUM AMOUNT BASED ON THE NUMBER OF DAYS AND NUMBER OF PERSONS REQUIRED FOR THIS JOB. 375 E & C LPG Pumps 60 M3/Hr 42662- Lump Sum 2 998719 Yes 1. ANY NEW EQUIPMENT OR MATERIAL SUPPLIED HAS TO BE INSTALLED AND COMMISSIONED BY THE VENDOR WHO HAS SUPPLIED THE ITEM.2. VENDOR IS REQUIRED TO PROVIDE A LUMPSUM AMOUNT BASED ON THE NUMBER OF DAYS AND NUMBER OF PERSONS REQUIRED FOR THIS JOB. 376 E & C LPG Compressor 42662- Lump Sum 2 998719 Yes 1. ANY NEW EQUIPMENT OR MATERIAL SUPPLIED HAS TO BE INSTALLED AND COMMISSIONED BY THE VENDOR WHO HAS SUPPLIED THE ITEM.2. VENDOR IS REQUIRED TO PROVIDE A LUMPSUM AMOUNT BASED ON THE NUMBER OF DAYS AND NUMBER OF PERSONS REQUIRED FOR THIS JOB. 377 E & C Air Compressor 42662- Lump Sum 2 998719 Yes 1. ANY NEW EQUIPMENT OR MATERIAL SUPPLIED HAS TO BE INSTALLED AND COMMISSIONED BY THE VENDOR WHO HAS SUPPLIED THE ITEM.2. VENDOR IS REQUIRED TO PROVIDE A LUMPSUM AMOUNT BASED ON THE NUMBER OF DAYS AND NUMBER OF PERSONS REQUIRED FOR THIS JOB. 378 E & C Jockey Air Compressor 42662- Lump Sum 2 998719 Yes 1. ANY NEW EQUIPMENT OR MATERIAL SUPPLIED HAS TO BE INSTALLED AND COMMISSIONED BY THE VENDOR WHO HAS SUPPLIED THE ITEM.2. VENDOR IS REQUIRED TO PROVIDE A LUMPSUM AMOUNT BASED ON THE NUMBER OF DAYS AND NUMBER OF PERSONS REQUIRED FOR THIS JOB. 379 E & C Fire Water Pump 42662- Lump Sum 3 998719 Yes 650M3/Hr 1. ANY NEW EQUIPMENT OR MATERIAL SUPPLIED HAS TO BE INSTALLED AND COMMISSIONED BY THE VENDOR WHO HAS SUPPLIED THE ITEM.2. VENDOR IS REQUIRED TO PROVIDE A LUMPSUM AMOUNT BASED ON THE NUMBER OF DAYS AND NUMBER OF PERSONS REQUIRED FOR THIS JOB. 380 E & C Jockey Pumps 42662- Lump Sum 2 998719 Yes 1. ANY NEW EQUIPMENT OR MATERIAL SUPPLIED HAS TO BE INSTALLED AND COMMISSIONED BY THE VENDOR WHO HAS SUPPLIED THE ITEM.2. VENDOR IS REQUIRED TO PROVIDE A LUMPSUM AMOUNT BASED ON THE NUMBER OF DAYS AND NUMBER OF PERSONS REQUIRED FOR THIS JOB. 381 E & C Weighbridge 42662- Lump Sum 1 998719 Yes 1. ANY NEW EQUIPMENT OR MATERIAL SUPPLIED HAS TO BE INSTALLED AND COMMISSIONED BY THE VENDOR WHO HAS SUPPLIED THE ITEM.2. VENDOR IS REQUIRED TO PROVIDE A LUMPSUM AMOUNT BASED ON THE NUMBER OF DAYS AND NUMBER OF PERSONS REQUIRED FOR THIS JOB. 382 E & C LPG Loading U/L Arms 42662- Lump Sum 16 998719 Yes 1. ANY NEW EQUIPMENT OR MATERIAL SUPPLIED HAS TO BE INSTALLED AND COMMISSIONED BY THE VENDOR WHO HAS SUPPLIED THE ITEM.2. VENDOR IS REQUIRED TO PROVIDE A LUMPSUM AMOUNT BASED ON THE NUMBER OF DAYS AND NUMBER OF PERSONS REQUIRED FOR THIS JOB. 383 E & C Makeup Water Pump 42662- Lump Sum 2 998719 Yes 1. ANY NEW EQUIPMENT OR MATERIAL SUPPLIED HAS TO BE INSTALLED AND COMMISSIONED BY THE VENDOR WHO HAS SUPPLIED THE ITEM.2. VENDOR IS REQUIRED TO PROVIDE A LUMPSUM AMOUNT BASED ON THE NUMBER OF DAYS AND NUMBER OF PERSONS REQUIRED FOR THIS JOB. 384 E & C Ser Water Pump 42662- Lump Sum 2 998719 Yes 1. ANY NEW EQUIPMENT OR MATERIAL SUPPLIED HAS TO BE INSTALLED AND COMMISSIONED BY THE VENDOR WHO HAS SUPPLIED THE ITEM.2. VENDOR IS REQUIRED TO PROVIDE A LUMPSUM AMOUNT BASED ON THE NUMBER OF DAYS AND NUMBER OF PERSONS REQUIRED FOR THIS JOB. 385 E & C Cooling Water Pump 42662- Lump Sum 2 998719 Yes 1. ANY NEW EQUIPMENT OR MATERIAL SUPPLIED HAS TO BE INSTALLED AND COMMISSIONED BY THE VENDOR WHO HAS SUPPLIED THE ITEM.2. VENDOR IS REQUIRED TO PROVIDE A LUMPSUM AMOUNT BASED ON THE NUMBER OF DAYS AND NUMBER OF PERSONS REQUIRED FOR THIS JOB. 386 E & C LPG KOD 42662- Lump Sum 1 998719 Yes 1. ANY NEW EQUIPMENT OR MATERIAL SUPPLIED HAS TO BE INSTALLED AND COMMISSIONED BY THE VENDOR WHO HAS SUPPLIED THE ITEM.2. VENDOR IS REQUIRED TO PROVIDE A LUMPSUM AMOUNT BASED ON THE NUMBER OF DAYS AND NUMBER OF PERSONS REQUIRED FOR THIS JOB. 387 E & C Air Receiver 42662- Lump Sum 1 998719 Yes 1. ANY NEW EQUIPMENT OR MATERIAL SUPPLIED HAS TO BE INSTALLED AND COMMISSIONED BY THE VENDOR WHO HAS SUPPLIED THE ITEM.2. VENDOR IS REQUIRED TO PROVIDE A LUMPSUM AMOUNT BASED ON THE NUMBER OF DAYS AND NUMBER OF PERSONS REQUIRED FOR THIS JOB. 388 E&C Miscellaneous equipment’s 42662- Metric Ton 10 998714 Yes EQUIPMENT ERECTION, UPTO 1T, VENDOR TRAN, PROVIDE NECESSARY TOOLS AND TACKLES, SKILLED MANPOWER FOR RIGGING, SUPERVISION AND TRANSPORTATION FOR SAFE ERECTION, ALIGNMENT AND LEVELING OF EQUIPMENT, UPTO 1 TONNE WEIGHT, COMPLETE WITH COMMISSIONING SUPPORT. EQUIPMENT INCLUDES VARIOUS DRUMS, TOWERS, PUMPS, EXCHANGERS, ETC. THIS CATEGORY IS APPLICABLE WHERE ARRANGEMENT OF FLAT BED/TRUCK FOR NECESSARY TRANSPORTATION OF THE EQUIPMENT WITHIN PLANT PREMISES AS PER HPCL REQUIREMENT IS MADE BY THE VENDOR. HOWEVER, IF CRANE IS REQUIRED FOR THE JOB THE SAME SHALL BE PROVIDED BY HPCL ON ADVANCE INTIMATION BY VENDOR AND FREE OF ANY CHARGE.PAYMENT SHALL BE MADE PER METRIC TONNE OF ACTUAL WEIGHT OF THE EQUIPMENT BEING HANDLED. 389 Backfilng usng excavated earth 42662- Cubic Meters 250 995433 Yes EARTHWORK: EARTHWORK IN EXCAVATION UPTO 1.5M DEPTH FOR FOUNDATIONS OF STRUCTURAL SHED, PIPE SUPPORTS/ SLEEPERS, PIPE BRIDGES, TRENCHES, CULVERT, DRAIN, RCC BUILDING FOUNDATION, PARKING AREA ETC. OR ANY OTHER PLACE AS REQUIRED AND DIRECTED, IN ORDINARY SOILS INCLUDING SOFT ROCK / DISINTEGRATED ROCK, IN BOTH DRY AND WET CONDITIONS, INCLUDING PUMPING AND BAILING OUT SURFACE AND SUBSOIL WATER, SHORING, STRUTTING, SLUSH REMOVAL, INCLUDING BACKFILLING IN ALL POSITIONS, IN LAYERS OF 150MM AT ALL HEIGHTS AND DEPTHS AS PER DRAWING AND SPECIFICATIONS WHEREVER REQUIRED, IN FOUNDATION PITS AND OTHER PLACES WITH EXCAVATED SUITABLE APPROVED SURPLUS EARTH, INCLUDING RECLAIMING FROM SPOIL HEAPS KEPT ELSEWHERE INCLUDING DRESSING AND LEVELING, WATERING AND MECHANICAL COMPACTION ETC., TRANSPORTING AND DISPOSAL OF SURPLUS EXCAVATED EARTH WITHIN/ OUTSIDE PLANT BOUNDARY AS DIRECTED BY THE ENGINEER. (THE MEASUREMENT FOR PAYMENT SHALL BE FOR THE THEORETICAL EXCAVATION VOLUME ONLY AS PER DRAWING I.E. FOR VOLUME OF BLOCK OF EXCAVATION HAVING THE ACTUAL DEPTH AND MAXIMUM BOTTOM DIMENSIONS OF THE FOUNDATION/ STRUCTURE).THE CONTRACTOR SHOULD TAKE INTO ACCOUNT IN HIS RATE THE PROVISION FOR ANY EXCESS EXCAVATION FOR NECESSARY WORKING SPACE, STEPS, SLOPING, ETC., REQUIRED FOR EXCAVATION, SAFETY AND OTHER ALLIED WORKS AND REFILLING THE SIDE SLOPES/ WORKING SPACE, STEPS, ETC.) 390 Excavation upto 3M depth 42662- Cubic Meters 250 995433 Yes EARTHWORK: EARTHWORK IN EXCAVATION UPTO 1.5M DEPTH FOR FOUNDATIONS OF STRUCTURAL SHED, PIPE SUPPORTS/ SLEEPERS, PIPE BRIDGES, TRENCHES, CULVERT, DRAIN, RCC BUILDING FOUNDATION, PARKING AREA ETC. OR ANY OTHER PLACE AS REQUIRED AND DIRECTED, IN ORDINARY SOILS INCLUDING SOFT ROCK / DISINTEGRATED ROCK, IN BOTH DRY AND WET CONDITIONS, INCLUDING PUMPING AND BAILING OUT SURFACE AND SUBSOIL WATER, SHORING, STRUTTING, SLUSH REMOVAL, INCLUDING BACKFILLING IN ALL POSITIONS, IN LAYERS OF 150MM AT ALL HEIGHTS AND DEPTHS AS PER DRAWING AND SPECIFICATIONS WHEREVER REQUIRED, IN FOUNDATION PITS AND OTHER PLACES WITH EXCAVATED SUITABLE APPROVED SURPLUS EARTH, INCLUDING RECLAIMING FROM SPOIL HEAPS KEPT ELSEWHERE INCLUDING DRESSING AND LEVELING, WATERING AND MECHANICAL COMPACTION ETC., TRANSPORTING AND DISPOSAL OF SURPLUS EXCAVATED EARTH WITHIN/ OUTSIDE PLANT BOUNDARY AS DIRECTED BY THE ENGINEER. (THE MEASUREMENT FOR PAYMENT SHALL BE FOR THE THEORETICAL EXCAVATION VOLUME ONLY AS PER DRAWING I.E. FOR VOLUME OF BLOCK OF EXCAVATION HAVING THE ACTUAL DEPTH AND MAXIMUM BOTTOM DIMENSIONS OF THE FOUNDATION/ STRUCTURE).THE CONTRACTOR SHOULD TAKE INTO ACCOUNT IN HIS RATE THE PROVISION FOR ANY EXCESS EXCAVATION FOR NECESSARY WORKING SPACE, STEPS, SLOPING, ETC., REQUIRED FOR EXCAVATION, SAFETY AND OTHER ALLIED WORKS AND REFILLING THE SIDE SLOPES/ WORKING SPACE, STEPS, ETC.) 391 Sup & Lay 230MM Thk Rubble 42662- Cubic Meters 30 995456 Yes Providing and laying dry trap rubble stone soling 230 mm thick including hand packing, filling the interstices with chips, spalls and binding with grit and selected murrum, watering, compacting complete. 392 PCC 1:5:10 42662- Cubic Meters 15 995454 Yes PCC M5 (1:5:10) CAST-IN-SITU WITH 150 MM PLUMS: PROVIDING, MIXING, LAYING AND COMPACTING LAYERS OF PLUM CONCRETE IN PCC OF GRADE M5 (1:5:10) WITH 40 MM AND DOWNGRADED COARSE AGGREGATES OF REQUIRED THICKNESS AND 150 MM DOWNGRADED PLUMS AS SHOWN ON DRAWING, WHERE REQUIRED, ETC, INCLUDING CURING, SHUTTERING, ETC. COMPLETE AS PER SPECIFICATIONS DRAWINGS AND AS DIRECTED BY ENGINEER-IN-CHARGE. 393 RCC M25 42662- Cubic Meters 30 995454 Yes withWaterProofingadmix Providing and Laying in position Machine batched and machine mixed Design mix/ Ready mixed M-25 grade concrete forReinforced Cement Concrete work ,using cement content as per approved design mix, manufactured in fully automatic batchingplant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as permix design of specified grade for reinforced cement concrete work, including pumping of R.M.C as applicable, from finishingand reinforcement, including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/retard setting ofconcrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. Ratesincludes for providing shuttering also 394 RCC M25 42662- Cubic Meters 30 995454 Yes W/OWaterProofingadmix Providing and Laying in position Machine batched and machine mixed Design mix/ Ready mixed M-25 grade concrete forReinforced Cement Concrete work ,using cement content as per approved design mix, manufactured in fully automatic batchingplant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as permix design of specified grade for reinforced cement concrete work, including pumping of R.M.C as applicable, from finishingand reinforcement, including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/retard setting ofconcrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. Ratesincludes for providing shuttering also 395 REINF STEEL Fe 500 42662- Metric Ton 3 995454 Yes HYSD TMT BARS FE 500-SUPPLYING AND FABRICATING AND FIXING IN POSITION STEEL REINFORCEMENTS AT ALL LEVELS AND POSITIONS INCLUDING THE COST OF TRANSPORT, STRAIGHTENING, CUTTING, BENDING, CRANKING, BINDING, WELDING, PROVISION OF NECESSARY CHAIRS AND SPACERS, PREPARATION OF BAR BENDING SCHEDULE DRAWINGS, GETTING THE SAME APPROVED ETC., AS PER DRAWINGS AND SPECIFICATIONS AND INCLUDING COST OF BINDING WIRE, LABOUR ETC., ALL COMPLETE FOR REINFORCED CONCRETE AND REINFORCED BRICK WORK AND ANY OTHER PLACE AS SPECIFIED WITH HCR TMT BARS (HCR FE500 TMT FROM SAIL/ FE500-TISCON-TMT BARS FROM TATA ). THE CHAIRS AND SPACER BARS PROVIDED WILL NOT BE MEASURED FOR PAYMENT. HIGH CORROSION RESISTANT TMT BARS CONFORMING TO GRADE FE-500 OF IS1786-1985. 396 Sup & Lay PVC Pipe75 MM Dia 42662- Running Meter 35 995424 Yes 80 MM DIA UPVC PIPE FOR WEEP HOLESPROVIDING AND FIXING OF 80 DIA UPVC PIPE WITH 2.7MM THICKNESS (AS PER IS: 13592) AS WEEP HOLES IN CULVERT/DRAIN WALLS WITH GEOTEXTILE WRAPPED STONE AGGREGATE (SIZE 63MM DOWN AGGREGATE) AS FILTER MEDIA PREVENT INGRESS OF SOIL INTO PIPE INCLUDING EXCAVATION, BACKFILLING, PROTECT THE PIPES DURING CONSTRUCTION, CLEARING AFTER CONCRETING ETC AT ALL LOCATIONS AS PER DRAWINGS AND DIRECTION OF THE ENGINEER.COST TOWARDS GEOTEXTILE, AGGREGATE, EXCAVATION, BACKFILLING ETC., SHALL BE DEEMED TO HAVE INCLUDED IN THE QUOTED RATE. FOR THE MEASUREMENT FOR PAYMENT PURPOSE LENGTH OF PIPE EMBEDDED IN WALL SHALL BE CONSIDERED. 397 BRICKWORK (superstructure) 42662- Cubic Meters 100 995456 Yes abo PROVIDING AND CONSTRUCTING BRICK MASONRY SUPER-STRUCTURE IN CM 1:5 USING 50B CLASS BRICKS OF MINIMUM COMPRESSIVE STRENGTH 50 KG/SQ.CM AND CONFORMING TO IS: 1077-1986 INCLUDING PROVIDING ALL OPENINGS AND PROJECTIONS AS PER THE DRAWING, RAKING THE JOINTS TO 1 CM DEEP, SCAFFOLDING, SOAKING OF BRICKS PRIOR TO USE AND CURING ETC COMPLETE AS PER SPECIFICATIONS. MEASUREMENT OF MASONRY WILL BE BASED ON ACTUAL THICKNESS OF WALL CONSTRUCTED. (A)BRICK FOR MASONRY IN FOUNDATION, WALLS AND OTHER LOCATION SHALL BE HAND OR MACHINE MOULDED AND MADE FROM SUITABLE SOIL AND KILN BURNT. THEY SHALL HAVE REGULAR AND UNIFORM SIZE AND COLOUR, SHARP STRAIGHT AND RIGHT ANGELED EDGES AND DEEP CHERRY RED COLOUR, UNIFORMITY WELL BURNT THROUGHOUT BUT NOT OVER BURNT. THEY SHALL HAVE SMOOTH RECTANGULAR FACES WITH PALLET SIDES AND SHARP CORNERS. 398 BRICKWORK (substructure) 42662- Cubic Meters 20 995456 Yes below PROVIDING AND CONSTRUCTING BRICK MASONRY SUB-STRUCTURE IN CM 1:5 USING 50B CLASS BRICKS OF MINIMUM COMPRESSIVE STRENGTH 50 KG/SQ.CM AND CONFORMING TO IS: 1077-1986 INCLUDING PROVIDING ALL OPENINGS AND PROJECTIONS AS PER THE DRAWING, RAKING THE JOINTS TO 1 CM DEEP, SCAFFOLDING, SOAKING OF BRICKS PRIOR TO USE AND CURING ETC COMPLETE AS PER SPECIFICATIONS. MEASUREMENT OF MASONRY WILL BE BASED ON ACTUAL THICKNESS OF WALL CONSTRUCTED. (A)BRICK FOR MASONRY IN FOUNDATION, WALLS AND OTHER LOCATION SHALL BE HAND OR MACHINE MOULDED AND MADE FROM SUITABLE SOIL AND KILN BURNT. THEY SHALL HAVE REGULAR AND UNIFORM SIZE AND COLOUR, SHARP STRAIGHT AND RIGHT ANGELED EDGES AND DEEP CHERRY RED COLOUR, UNIFORMITY WELL BURNT THROUGHOUT BUT NOT OVER BURNT. THEY SHALL HAVE SMOOTH RECTANGULAR FACES WITH PALLET SIDES AND SHARP CORNERS. 399 Ext PLASTR 20MM 42662- Square Meters 700 995472 Yes PROVIDING AND LAYING OF 20 MM THICK EXTERNAL SAND FACED CEMENT PLASTER IN C.M. 1:6, IN TWO LAYERS ON R.C.C. OR MASONRY TO ALL HEIGHTS, INCLUDING SCAFFOLDING, RAKING OUT OF JOINTS, MOULDINGS AND PROVIDING GROOVES IN PLASTER 12 MM WIDE AND 12 MM DEEP WHERE 2 DIFFERENT MATERIALS ARE IN LINE (E.G. R.C.C. AND BRICKWORK, ETC.) INCLUDING CURING ETC. COMPLETE AS PER THE SPECIFICATIONS, DRAWINGS AND AS DIRECTED BY HPCL EIC. CEMENT SHALL BE EITHER 43 GRADE OPC OR PPC FLY ASH BASED OF APPROVED MANUFACTURER. 400 GP2 grouting 42662- Cubic Meters 6 995454 Yes SUPPLY AND INJECTING OF CEMENTITIOUS GROUT FOR STRUCTURAL BASE PLATES AND EQUIPMENT BASE FRAMESPROVIDING AND LAYING NON-SHRINKING CEMENTITIOUS GROUT OF HPCL APPROVED MANUFACTURER UNDER BASE PLATES OF MACHINE FRAMES, STEEL COLUMNS, ETC., FOR GROUTS OF THICKNESS SHOWN IN DRAWINGS AND FILLING OF POCKETS OF FOUNDATIONS AND CURING, CLEANING OUT POCKETS, ETC., COMPLETE AND AS PER THE SPECIFICATIONS AND DRAWINGS. THE NONSHRINKING GROUT SHALL BE LAID AS PER MANUFACTURER''S SPECIFICATIONS. 401 SUP LAY 450 mm dia. R.C.C. pip 42662- Meters 80 995423 Yes NP-3 CLASS HUME PIPE/450 MILLIMETER/ROAD CROSSING-HUME PIPE 450 MILLIMETER NB SUPPLYING AND LAYING RCC HUME PIPES OF NP3 CLASS AT DESIGNATED PLACES OR AS DIRECTED BY ENGINEER-IN-CHARGE. JOB TO INCLUDE COLLARS/JOINTS JOINTED WITH STIFF MIXTURE OF CM 1:2 PROPORTION, CURING, ALIGNING AND JOINING ETC. TO CORRECT LINE, LEVEL, SLOPE AND GRADIENT COMPLETE. JOB ALSO TO INCLUDE EXCAVATION IN ANY TYPE OF SOIL/SOFT ROCK/HARD ROCK (A MIN. OF 300 MILLIMETER MORE IN ALL DIRECTIONS), 200 MILLIMETER THICK SAND BEDDING, FOLLOWED BY 150 MILLIMETER THICK PCC 1:2:4 (WITH 20 MILLIMETER DOWN AGGREGATE), LAYING OF HUME PIPE AND BACKFILLING THE TRENCH WITH APPROVED QUALITY SAND TO A DEPTH OF 150 MILLIMETER AND THEN PLACING MURRUM AND COMPACTING USING A SURFACE VIBRATOR AND COMPLETING THE TOP OF THE FINISHED SURFACE BELOW THE LEVEL OF BITUMEN CARPET/WBM LAYER WITH 100 MILLIMETER THICK RCC 1:2:4 WITH PROVISION OF REINFORCEMENT OF 8 MILLIMETER 200 C/C INCLUDING BACKFILLING AT ALL DEPTHS AND JOB TO BE EXECUTED AS PER ATTACHED TECHNICAL SPECIFICATION AND DIRECTIONS OF ENGINEER-IN-CHARGE COMPLETE. ANY DISMANTLING OF RCC/PCC, IF ENCOUNTERED DURING EXCAVATION WILL BE PAID SEPARATELY UNDER RELEVANT ITEM. NOTE: PAYMENT TO BE MADE FOR RUNNING METER LENGTH OF HUME PIPE LAID ONLY. PARTY TO QUOTE FOR THE ITEM INCLUDING THE ENTIRE SCOPE OF THE ABOVE JOB AS ONE JOB AND NO SEPARATE PAYMENT WILL BE MADE. JOB TO BE CARRIED OUT AS PER DETAILED “STANDARD SPECIFICATION FOR SUPPLYING AND LAYING HUME PIPES” PROVIDED UNDER TECHNICAL SPECIFICATIONS SECTION OF THIS TENDER AND AS DIRECTED BY ENGINEER-IN-CHARGE COMPLETE. 402 SUP LAY 600 mm dia. R.C.C. pip 42662- Meters 80 995423 Yes NP-3 CLASS HUME PIPE/450 MILLIMETER/ROAD CROSSING-HUME PIPE 450 MILLIMETER NB SUPPLYING AND LAYING RCC HUME PIPES OF NP3 CLASS AT DESIGNATED PLACES OR AS DIRECTED BY ENGINEER-IN-CHARGE. JOB TO INCLUDE COLLARS/JOINTS JOINTED WITH STIFF MIXTURE OF CM 1:2 PROPORTION, CURING, ALIGNING AND JOINING ETC. TO CORRECT LINE, LEVEL, SLOPE AND GRADIENT COMPLETE. JOB ALSO TO INCLUDE EXCAVATION IN ANY TYPE OF SOIL/SOFT ROCK/HARD ROCK (A MIN. OF 300 MILLIMETER MORE IN ALL DIRECTIONS), 200 MILLIMETER THICK SAND BEDDING, FOLLOWED BY 150 MILLIMETER THICK PCC 1:2:4 (WITH 20 MILLIMETER DOWN AGGREGATE), LAYING OF HUME PIPE AND BACKFILLING THE TRENCH WITH APPROVED QUALITY SAND TO A DEPTH OF 150 MILLIMETER AND THEN PLACING MURRUM AND COMPACTING USING A SURFACE VIBRATOR AND COMPLETING THE TOP OF THE FINISHED SURFACE BELOW THE LEVEL OF BITUMEN CARPET/WBM LAYER WITH 100 MILLIMETER THICK RCC 1:2:4 WITH PROVISION OF REINFORCEMENT OF 8 MILLIMETER 200 C/C INCLUDING BACKFILLING AT ALL DEPTHS AND JOB TO BE EXECUTED AS PER ATTACHED TECHNICAL SPECIFICATION AND DIRECTIONS OF ENGINEER-IN-CHARGE COMPLETE. ANY DISMANTLING OF RCC/PCC, IF ENCOUNTERED DURING EXCAVATION WILL BE PAID SEPARATELY UNDER RELEVANT ITEM. NOTE: PAYMENT TO BE MADE FOR RUNNING METER LENGTH OF HUME PIPE LAID ONLY. PARTY TO QUOTE FOR THE ITEM INCLUDING THE ENTIRE SCOPE OF THE ABOVE JOB AS ONE JOB AND NO SEPARATE PAYMENT WILL BE MADE. JOB TO BE CARRIED OUT AS PER DETAILED “STANDARD SPECIFICATION FOR SUPPLYING AND LAYING HUME PIPES” PROVIDED UNDER TECHNICAL SPECIFICATIONS SECTION OF THIS TENDER AND AS DIRECTED BY ENGINEER-IN-CHARGE COMPLETE. 403 Service Water Overhead Tank 42662- Each 1 998732 Yes SUPPLY AND FIXING OF TRIPLE LAYER WATER TANK (500 LITERS) INCLUDING ALL FITTINGS COMPLETE ALL AS SPECIFIED AND DIRECTED BY ENGINEER IN-CHARGE OF APPROVED MAKE. 404 S/PREP&PRIMR-LPG&NON 42662- Inch Meter 60000 998539 Yes LPG P/L SURFACE PREPARATION AND PAINTING: SURFACE PREPARATION TO SA 2 1/2 BY SHOT/COPPER SLAG BLASTING, SUPPLY AND APPLICATION OF 1 COAT OF INORGANIC ZINC SILICATE PRIMER AT 65-75 MICRONS DFT/COAT BY AIRLESS SPRAY ALL COMPLETE AS PER INSTRUCTIONS OF HPCL SITE-IN-CHARGE. QUOTED RATES ARE DEEMED TO INCLUDE ALL NECESSARY QC, TESTING, CHECKING DFT, HANDLING OF PIPES ETC., ALL COMPLETE.NOTE: CONTRACTOR TO ARRANGE AND KEEP AT SITE THE RELEVANT SWEDISH PHOTOGRAPHIC STANDARDS FOR INSPECTION BY HPCL SITE IN CHARGE FAILING WHICH PERMISSION TO PROCEED WITH THE WORK WILL NOT BE GRANTED. IF THE COATING IS DAMAGED WHILE HANDLING THE PIPES PATCH REPAIRS NEEDS TO BE & COST OF SUCH PATCH REPAIRS IS DEEMED TO BE INCLUDED IN THE QUOTED RATES. 405 INT COAT-MIO-1 COAT 42662- Inch Meter 60000 995473 Yes PAINTING OF INTERMEDIATE COAT-SUPPLY AND PAINTING ONE COAT OF 100 MICRON OF EPOXY POLYAMIDE BASED MIO OF APPROVED MAKE (AFTER APPLYING TWO COATS OF ZINC RICH HB PRIMER ALONG WITH METAL CONDITIONING SOLUTION) FOR A LENGTH OF 75MM ON EITHER SIDE OF WELD JOINT AFTER BUFFING/WIRE BRUSHING; TESTING FOR THICKNESS ETC., COMPLETE AND APPLYING WITH CONVENTIONAL SPRAY/AIR LESS SPRAY GUN TILL REQUIRED DFT OF PAINT THICKNESS IS OBTAINED, TESTING FOR THICKNESS, ETC. ALL COMPLETE. LENGTH WILL BE MEASURED INCLUSIVE OF PAINTED FITTINGS/VALVES/FLANGES.NOTE:1.THE PAINT USED SHALL BE OF APPROVED MAKE BY HPCL.2.THE COLOUR SHADE CODE FOR PRODUCT (WATER) WILL BE CONFIRMING TO IS 5- 1978 EXECUTION OF THE JOB AS PER LATEST CODAL PROVISIONS, ATTACHED TECHNICAL SPECIFICATIONS AND AS DIRECTED BY EIC. 406 SUPLY & PAINTING OF FINAL 42662- Square Meters 7000 995473 Yes COAT SYNTHETIC ENAMEL PAINT-NEW WORK: PAINTING TWO OR MORE COATS ON NEW WORK WITH SYNTHETIC ENAMEL PAINT OF APPROVED BRAND AND MANUFACTURE TO GIVE AN EVEN SHADE. 407 SUPLY & PAINT ETCH PRIMER 42662- Square Meters 1500 995473 Yes SUPPLY AND BRUSH APPLICATION OF ONE COAT OF ETCH PRIMER, ETC COMPLETE IN ALL RESPECTS AS PER TENDER TECHNICAL SPECIFICATIONS, TERMS AND CONDITIONS ETC TO THE BEST SATISFACTION OF HPCL. | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20000711-HD-10157.pdf
TENDER_DOCUMENT • 25.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .