| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.5 LAccepted-AOC | ₹41.5 L | L1 | Accepted-AOC Work Order Issued |
| 2 | L2₹41.7 L+₹21,812 (0.53%)Rejected-Finance | ₹41.7 L+₹21,812 (0.53%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹47.0 L+₹5.5 L (13.3%)Rejected-Finance KANAKALAPETA YANAM | ₹47.0 L+₹5.5 L (13.3%) | L3 | Rejected-Finance Rejected |
Tender Value
₹49.0 L
EMD Value
₹98,024
Closing Date
22 Aug 2023, 4:00 pmClosed
EE, PWD, Yanam
Chinta Street, PWD, Yanam
Construction of balance protection wall around the 7th GLR in Dariyalathippa water works campus in Yanam
2023_PWDC2_13414_1
72/EEY/2023-24
Open Tender
Civil Works
Item Rate
120 days
Yanam
Please refer Tender documents.
2 documents required · 2 mandatory
₹525
₹98,024
21 Sept 2023
11 Aug 2023
22 Aug 2023
11 Aug 2023
22 Aug 2023
11 Aug 2023
Amount
20.2.1 Boring , providing and installing bored cast -in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring , with bentonite solution and temporary casing of appropriate lenghth for setting out and removal of same and the lenghth of the pile to be embedded in the pile cap etc. all complete , including removal of excavated earth with all lifts and leads (length of pile for payment shall be measured upto bottom of pile cap) - 300 mm dia piles.
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavation) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and lift upto 1.5m - all kinds of soil
2.27 Supplying and filling in plinth with river sand under floors, including watering ,ramming consolidating and dressing complete
4.1.10 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40mm nominal size).
5.9.1 Centering and shuttering including strutting, propping etc and removal of form for - foundations, footings, bases of columns etc for mass concrete.
5.1.2 Providing and laying in position specified grade of reinforced cement concrete , excluding the cost of centering , shuttering , finsishing and reinforcement -All work upto plinth level 1:1.5:3 (1cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.6 Centering and shuttering including strutting , propping etc and removal of form for - Columns , Pillars , Piers , Abutments , Posts and Struts.
5.2.2 Reinforced cement concrete work in walls (any thickness) , including attached pilasters, buttresses, plinth and sting courses , fillets, columns ,pillars , piers, abutments posts and struts etc. upto floor five level excluding cost of centering , shuttering, finishing and reinforcement - 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size).
6.3.1 Brick work with common burnt clay machine moulded perforated bricks of class designation 12.5 conforming to IS : 2222 in superstructure above plinth level upto floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) - with F.P.S (non - modular) bricks.
16.19 Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction of 10 cm length and drilling holes upto 10mm dia etc. complete.
13.1.2 12mm Cemen plaster of Mix 1:6 (1 Cement: 6 fine sand)
13.2.2 15mm cement plaster on the rough side of single or half brick wall of mix - 1:6 (1cement : 6 fine sand)
13.48.1 Finishing with deluxe multi surface paint system for interiors and exteriors using primer as per manufacture's specification - Two or more coats applied on walls @ 1.25 ltr / 10 sqm over and including one coat of special primer applied @ 0.75 ltr / 10 sqm.
13.48.3 Painting steel work with deluxe multi surface paint to give an even shade. Two or more coat applied @ 0.90 ltr / 10 sqm over an under coat of primer applied @ 0.80 ltr / 10 sqm of approved brand and manufacture.
5.22.7 Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars (ISI BRAND OF APPROVED MAKE) Fe - 415 or more.
kondamuri venkatarao
sekhar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .