Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.0 LAccepted-AOC | 1 | Accepted-AOC accepted | |
| 2 | 2₹7.7 L+₹1.7 L (29.1%)Rejected-Finance | 2 | Rejected-Finance Not Responsive |
| Sl No | Description | Qty | Unit | R.RANGASAMY L2 | Murugesan R L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. | 892 | M3 | 500 ₹4,46,000 | 308 ₹2,74,736 Lowest |
| 2.00Cost and Supply of PVC Pipe 6kgsc/cm2 and GI pipes ISI Quality including loading and unloading charges etc., complete as per Specifiction. | |||||
| 2.10 | 90 mm PVC 6kgsc/cm2 PVCPipes | 275 | M | 150 ₹41,250 | 142 ₹39,050 Lowest |
| 2.20 | 75 mm PVC 6kgsc/cm2 PVCPipes | 1,925 | M | 101.5 ₹1,95,387.5 Lowest | 101.5 ₹1,95,387.5 Lowest |
| 3.00Lowering PVC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste. | |||||
| 3.10 | 90 mm PVC 6kgsc/cm2 PVCPipes | 275 | M | 22 ₹6,050 Lowest | 22 ₹6,050 Lowest |
| 3.20 | 75 mm PVC 6kgsc/cm2 PVCPipes | 1,925 | M | 22 ₹42,350 Lowest | 22 ₹42,350 Lowest |
| 4.00 | Refilling the excavated earth for pipe line trench including all labour charges etc., complete. | 892 | M3 | 42.5 ₹37,910 Lowest | 42.5 ₹37,910 Lowest |
Tender Value
₹7.3 L
EMD Value
₹7,250
Closing Date
26 Sept 2025, 3:00 pmClosed
Executive Officer, Mopperipalayam Town Panchayat
Mopperipalayam Town Panchayat Office, Vagarayampalayam
Extension of Pipeline at Ward No.13 Ponnandampalayam OHT to Ponnandampalayam end, Ward No.7 Annur Main Road to SS Garden OHT, Ward No.1 Karupparayan Kovil OHT to Thiruvalluvar Street in Mopperipalayam Town Panchayat.
2025_DTP_601741_1
431/2025
Open Tender
Pipe Laying Works
Works
90 days
Work
As Per Norms
2 documents required · 2 mandatory
₹0
₹7,250
Yes
27 Sept 2025
8 Sept 2025
26 Sept 2025
8 Sept 2025
26 Sept 2025
8 Sept 2025
Amount
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications.
Cost and Supply of PVC Pipe 6kgsc/cm2 and GI pipes ISI Quality including loading and unloading charges etc., complete as per Specifiction.
90 mm PVC 6kgsc/cm2 PVCPipes
75 mm PVC 6kgsc/cm2 PVCPipes
Lowering PVC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.
90 mm PVC 6kgsc/cm2 PVCPipes
75 mm PVC 6kgsc/cm2 PVCPipes
Refilling the excavated earth for pipe line trench including all labour charges etc., complete.
R.RANGASAMY (BID ID -1473286)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .