Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.2 L MOEI and Fans i/c PUMP set, Street light in phase II Sector VII, Antop Hill Mumbai 37 SH:- Provision and commissioning of time based automated lighting control equipment and related electrical works in GPRA Residential Buildings, Phase II, Sector VII,Antop Hill,Mumbai 37. | MOEI and Fans i/c PUMP set, Street light in phase II Sector VII, Antop Hill Mumbai 37 SH:- Provision and commissioning of time based automated lighting control equipment and related electrical works in GPRA Residential Buildings, Phase II, Sector VII,Antop Hill,Mumbai 37. | L1 | - | |
| 2 | L2₹4.3 L+₹3,017.91 (0.71%) MOEI and Fans i/c PUMP set, Street light in phase II Sector VII, Antop Hill Mumbai 37 SH:- Provision and commissioning of time based automated lighting control equipment and related electrical works in GPRA Residential Buildings, Phase II, Sector VII,Antop Hill,Mumbai 37. | MOEI and Fans i/c PUMP set, Street light in phase II Sector VII, Antop Hill Mumbai 37 SH:- Provision and commissioning of time based automated lighting control equipment and related electrical works in GPRA Residential Buildings, Phase II, Sector VII,Antop Hill,Mumbai 37. | L2 | - | |
| 3 | L3₹4.4 L+₹18,323.03 (4.32%)Financial bid opened MOEI and Fans i/c PUMP set, Street light in phase II Sector VII, Antop Hill Mumbai 37 SH:- Provision and commissioning of time based automated lighting control equipment and related electrical works in GPRA Residential Buildings, Phase II, Sector VII,Antop Hill,Mumbai 37. | MOEI and Fans i/c PUMP set, Street light in phase II Sector VII, Antop Hill Mumbai 37 SH:- Provision and commissioning of time based automated lighting control equipment and related electrical works in GPRA Residential Buildings, Phase II, Sector VII,Antop Hill,Mumbai 37. | L3 | Financial bid opened | |
| 4 | L4₹4.5 L+₹22,116.97 (5.22%) MOEI and Fans i/c PUMP set, Street light in phase II Sector VII, Antop Hill Mumbai 37 SH:- Provision and commissioning of time based automated lighting control equipment and related electrical works in GPRA Residential Buildings, Phase II, Sector VII,Antop Hill,Mumbai 37. | MOEI and Fans i/c PUMP set, Street light in phase II Sector VII, Antop Hill Mumbai 37 SH:- Provision and commissioning of time based automated lighting control equipment and related electrical works in GPRA Residential Buildings, Phase II, Sector VII,Antop Hill,Mumbai 37. | L4 | - | |
| 5 | - | - | - |
| Sl No | Description | Qty | Unit | NEW STAR ELECTRIC WORKS L1 | RUDRAPELLI SHIVA KUMAR L2 | BHUPENDRA SINGH L4 | SHIV ELETRICALS L3 |
|---|---|---|---|---|---|---|---|
| 1 | ELECTRICAL | - | - | -1.7 ₹4,23,800.79 Lowest | -1 ₹4,26,818.7 | 3.43 ₹4,45,917.76 | 3 ₹4,42,123.82 |
Tender Value
₹4.3 L
EMD Value
₹8,623
Closing Date
3 Dec 2025, 4:00 pmClosed
AE-E-2
Gaurav Sharma
O/o Executive Engineer (E), MUMBAI-IV, CPWD, 4th Floor, Nirman Sadan,
MOEI and Fans i/c PUMP set, Street light in phase II Sector VII, Antop Hill Mumbai 37 SH:- Provision and commissioning of time based automated lighting control equipment and related electrical works in GPRA Residential Buildings, Phase II, Sector VII,Antop Hill,Mumbai 37.
134558
123/AE(E)II/MUMBAI IV/2025-26
OPEN
Electrical Works
NCB
1 months
Mumbai, Maharashtra
11 documents required · 11 mandatory
₹8,623
Not Applicable
3 Dec 2025
26 Nov 2025
3 Dec 2025
3 Dec 2025
3 Dec 2025
stage.html
html • 0.08 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT+123.pdf
document • 0.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .