| Sl No | Description | Qty | Unit | V.Balasubramaniyan L2 | B. GNANAPANDITHAN L1 |
|---|---|---|---|---|---|
| 1.00 | Boring, providing and installing Bored cast-in-situ reinforced cement Concrete pile of specified diametre and length below the pile cap in cement concrete 1 :1.5:3 ( 1 cement, 1 .5 Coarse sand,& 3 graded stone aggregate of 20 mm nominal size) to than specified excluding the cost of steel reinforcement but including Bentonite solution machinery charges labour charges etc., complete. as per standard specification. 300mm Dia TNBP No. 23, & 30 | 123 | RM | 1,53,724.17 ₹1.5 L | 1,53,724.17 ₹1.5 L |
| 2.00 | Earthwork excavation for foundation in all soils and sub soils in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and to full depth as may be directed,except in hard rock,requiring blasting including shoring and shuttering and bailing out of water wherever necessary,refilling the sides of foundation with excavated earth or sand in layer of not more than 15cm thick.well rammed and consolidated and depositing on bank with initial lead and lift of 10m & initial lift of 2m and depositing the surplusr earth within the compound in places shown by the departmental officers with iniital lead and lifts,clearing and levelling the site etc., complete as per SS20B and as directed by departmental Engineers(TNBP No.17,23,24). - 1 M3 | 15 | M3 | 3,451.5 ₹3,451.50 | 3,361.5 ₹3,361.50 |
| 3.00 | Supplying and Filling in foundation and basement with Filling STONE DUST in layers of not more than 15cm thick well rammed,watered consolidated including cost and conveyance of materials and labour charges etc., complete as per Standard Specification and as directed by departmental Engineers(TNBP No.24&25). | 3 | M3 | 1,845 ₹1,845 | 1,845 ₹1,845 |
| 4.00 | Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers (TNBP No.28). | 4.5 | M3 | 24,934.91 ₹24,934.91 | 24,934.91 ₹24,934.91 |
| 5.00 | Vibrated Reinforced Cement concrete 1:1 1/2:3 (One cement, one and half sand and Three aggregate) using machine crushed 20mm gauge hard broken stone jelly for all RCC items of work excluding centering strutting, and reinforcement grills placed in position but including mixing concrete, laying and vibrations charges, curing, etc complete and including providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary etc. complete complying with standard specification ( TNBP No:30) - Foundation and basement | 6.9 | M3 | 63,166.05 ₹63,166.05 | 63,166.05 ₹63,166.05 |
| 6.00 | Above basement | 4 | M3 | 36,778 ₹36,778 | 36,778 ₹36,778 |
| 7.00 | Supplying and erecting centering for sides and soffits including supports and strutting uptp 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90cmx60cm and 10 gauge stiffened, welded with mild steel angles of size 25mmx25x3mm for boarding laid over silver oak (country wood) joist of size 10cmx6.5cm dia spaced about 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre tocentre etc.complete complying with standard specification and as directed by the departmental engineers. TNBP No.30 - Without Strutting | 60 | M2 | 22,768.2 ₹22,768.20 | 22,768.2 ₹22,768.20 |
| 8.00 | Column | 67.9 | M2 | 69,315.04 ₹69,315.04 | 69,315.04 ₹69,315.04 |
| 9.00 | Supplying, fabricating and placing in position mild steel or ribbed tor steel for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30 | 1,308.48 | kg | 1,16,284.62 ₹1.2 L | 1,16,284.62 ₹1.2 L |
| 10.00 | Brick Work in CM 1:5 (One part of cement & five parts of M-sand) mix using Third Class Country Brick Kiln Burnt bricks 8 ¾ " x 4 ¼ " x 2 ¾" including cost and conveyance of materials to work site and including all labour charges for mixing, laying, curing the concrete etc., complete as per standard specifications and as directed by departmental Engineers – TNBP No:31 - Aove basement | 37.5 | M3 | 2,16,469.5 ₹2.2 L | 2,16,469.5 ₹2.2 L |
Tender Value
Refer Docs
EMD Value
₹11,000
Closing Date
12 Aug 2025, 3:00 pmClosed
Executive Officer, Perumagalur Town Panchayat
Executive Officer, Perumagalur Town Panchayat
Providing Compound wall at Veterinary Hospital in Perumagalur Town Panchayat Thanjavur District.
2025_DTP_590828_1
93/2025
Open Tender
Civil Works
Perumagalur Town Panchayat Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,000
Yes
20 Dec 2025
8 Aug 2025
12 Aug 2025
8 Aug 2025
12 Aug 2025
8 Aug 2025
Boring, providing and installing Bored cast-in-situ reinforced cement Concrete pile of specified diametre and length below the pile cap in cement concrete 1 :1.5:3 ( 1 cement, 1 .5 Coarse sand,& 3 graded stone aggregate of 20 mm nominal size) to than specified excluding the cost of steel reinforcement but including Bentonite solution machinery charges labour charges etc., complete. as per standard specification. 300mm Dia TNBP No. 23, & 30
Earthwork excavation for foundation in all soils and sub soils in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and to full depth as may be directed,except in hard rock,requiring blasting including shoring and shuttering and bailing out of water wherever necessary,refilling the sides of foundation with excavated earth or sand in layer of not more than 15cm thick.well rammed and consolidated and depositing on bank with initial lead and lift of 10m & initial lift of 2m and depositing the surplusr earth within the compound in places shown by the departmental officers with iniital lead and lifts,clearing and levelling the site etc., complete as per SS20B and as directed by departmental Engineers(TNBP No.17,23,24). - 1 M3
Supplying and Filling in foundation and basement with Filling STONE DUST in layers of not more than 15cm thick well rammed,watered consolidated including cost and conveyance of materials and labour charges etc., complete as per Standard Specification and as directed by departmental Engineers(TNBP No.24&25).
Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers (TNBP No.28).
Vibrated Reinforced Cement concrete 1:1 1/2:3 (One cement, one and half sand and Three aggregate) using machine crushed 20mm gauge hard broken stone jelly for all RCC items of work excluding centering strutting, and reinforcement grills placed in position but including mixing concrete, laying and vibrations charges, curing, etc complete and including providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary etc. complete complying with standard specification ( TNBP No:30) - Foundation and basement
Above basement
Supplying and erecting centering for sides and soffits including supports and strutting uptp 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90cmx60cm and 10 gauge stiffened, welded with mild steel angles of size 25mmx25x3mm for boarding laid over silver oak (country wood) joist of size 10cmx6.5cm dia spaced about 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre tocentre etc.complete complying with standard specification and as directed by the departmental engineers. TNBP No.30 - Without Strutting
Column
Supplying, fabricating and placing in position mild steel or ribbed tor steel for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30
Brick Work in CM 1:5 (One part of cement & five parts of M-sand) mix using Third Class Country Brick Kiln Burnt bricks 8 ¾ " x 4 ¼ " x 2 ¾" including cost and conveyance of materials to work site and including all labour charges for mixing, laying, curing the concrete etc., complete as per standard specifications and as directed by departmental Engineers – TNBP No:31 - Aove basement
Plastering with CM 1:5 (One part of cement & five parts of P-sand) mix for 12mm thick including cost and conveyance of all materials to work site and including all labour charges for mixing, laying, curing,finishing etc., complete as per standard specifications and as directed by departmental Engineers – TNBP No:56&57
Painting two coats with ready mixed Plastic Emulsion Paint S.I.358 Plastic emulison paint of'approved quality and colour over a priming coat, including thorough scraping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required including cost and conveyance of all materials etc.and all lobour charges etc.complete as per Standard specification and as directed by the departmental officers. TNBP No:66-A.
V.Balasubramaniyan (BID ID -1425164)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_705680.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid