Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 LAccepted-Finance | 1 | Accepted-Finance LOWEST | |
| 2 | 2₹3.2 L+₹8,127.88 (2.60%)Rejected-Finance | 2 | Rejected-Finance ABOVE | |
| 3 | 3₹3.3 L+₹16,218.41 (5.19%)Rejected-Finance 1087 LASKARHAT KOLKATA 700039 | KOLKATA | WEST BENGAL | 700039 | 3 | Rejected-Finance ABOVE |
| Sl No | Description | Qty | Unit | KGN ENTERPRISE L2 | S R ENTERPRISE L3 | Maa Jyotsnamoyee Enterprise L1 |
|---|---|---|---|---|---|---|
| 1.00 | Silver Sand | 27 | Cum | 406 ₹10,962 | 415 ₹11,205 | 400 ₹10,800 Lowest |
| 2.00 | Hire charges of Shuttering plank (25mm-30mm thick) with Prop including all fittings | 63 | Sqm | 310 ₹19,530 Lowest | 330 ₹20,790 | 324 ₹20,412 |
| 3.00 | Polythene sheet (150 gm per sqm) | 423 | Kg | 24 ₹10,152 Lowest | 26 ₹10,998 | 24 ₹10,152 Lowest |
| 4.00 | Thermocol 12.5 mm thick. | 31.15 | Sqm | 72 ₹2,242.8 Lowest | 75 ₹2,336.25 | 74 ₹2,305.1 |
| 5.00 | Stone Aggregate(single size): 10 mm nominal size | 17.53 | Cum | 1,482 ₹25,981.09 | 1,550 ₹27,173.21 | 1,459 ₹25,577.87 Lowest |
| 6.00 | Stone Aggregate(single size):20 mm nominal size | 35.69 | Cum | 1,602 ₹57,172.66 | 1,650 ₹58,885.7 | 1,590 ₹56,744.4 Lowest |
| 7.00 | Portland Cement | 25.55 | Tonne | 6,002 ₹1,53,322.89 | 6,100 ₹1,55,826.33 | 5,717 ₹1,46,042.48 Lowest |
| 8.00 | Carriage of Stone aggregate below 40 mm nominal size | 53.22 | Cum | 284 ₹15,114.28 | 285 ₹15,167.5 | 279.5 ₹14,874.79 Lowest |
| 9.00 | Loading unloading & stacking Sand/ stone aggregate (less than 40mm nominal size) | 53.22 | Cum | 75 ₹3,991.45 Lowest | 80 ₹4,257.54 | 77 ₹4,097.89 |
| 10.00 | Coarse Sand | 26.61 | Cum | 823 ₹21,899.78 | 820 ₹21,819.95 | 798 ₹21,234.54 Lowest |
Tender Value
₹3.1 L
EMD Value
₹6,245
Closing Date
31 Jul 2026, 5:00 pmClosed
PRADHAN
DEULPOTA GP
Construction of Cement Concrete Roads for Community from Saktipada Bhunia house to Ashok Bhuia House at Sapua under Deulpota Gram Panchayat
2026_ZPHD_1034244_2
321/DEULPOTA/2026
Open Tender
CIVIL WORKS
Percentage
15 days
SAPUA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
₹6,245
Yes
5 Aug 2026
25 Jul 2026
3 Aug 2026
25 Jul 2026
31 Jul 2026
25 Jul 2026
25 Jul 2026 - 31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silver Sand | - | Cum | 400 | - |
| 2 | Hire charges of Shuttering plank (25mm-30mm thick) with Prop including all fittings | - | Sqm | 324 | - |
| 3 | Polythene sheet (150 gm per sqm) | - | Kg | 24 | - |
| 4 | Thermocol 12.5 mm thick. | 1 | Sqm | 74 | ₹73.99 |
| 5 | Stone Aggregate(single size): 10 mm nominal size | 0.4 | Cum | 1,459 | ₹583.45 |
| 6 | Stone Aggregate(single size):20 mm nominal size | 0.2 | Cum | 1,590 | ₹317.84 |
| 7 | Portland Cement | 0.2 | Tonne | 5,717 | ₹1,143.4 |
| 8 | Carriage of Stone aggregate below 40 mm nominal size | 0.2 | Cum | 279.5 | ₹55.87 |
| 9 | Loading unloading & stacking Sand/ stone aggregate (less than 40mm nominal size) | - | Cum | 77 | - |
| 10 | Coarse Sand | 0.8 | Cum | 798 | ₹638.4 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_2540174.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .