| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-AOC HIMACHAL PRADESH HP | SHIMLA | HIMACHAL PRADESH | 171226 | ₹8.7 L | L1 | Accepted-AOC Accept |
| 2 | L2₹10.5 L+₹1.8 L (21.3%)Rejected-Finance | ₹10.5 L+₹1.8 L (21.3%) | L2 | Rejected-Finance Reject |
| 3 | L3₹10.7 L+₹2.0 L (23.6%)Rejected-Finance | ₹10.7 L+₹2.0 L (23.6%) | L3 | Rejected-Finance Reject |
| 4 | L4₹10.9 L+₹2.2 L (25.4%)Rejected-Finance OFFICE AT CHARRI TEH SHAHPUR DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | ₹10.9 L+₹2.2 L (25.4%) | L4 | Rejected-Finance Reject |
| 5 | L5₹11.6 L+₹2.9 L (33.7%)Rejected-Finance | ₹11.6 L+₹2.9 L (33.7%) | L5 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | SURAJ KUMAR PARMAR L3 | Shashi Kumar L7 | Monika Chandel L5 | AMAN CHAUHAN L2 | SURINDER KUMAR L4 | Mr. Sanjeev Kumar L1 | Vijay Kumar L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Hiring of earth cutting/excavating machineries to be deployed for earth cutting excavating or filling marking diversion bandh and channel wherever required including cost of fuel oil lubricant and wage of operational staff any repair brakage during operation will be carried out by the owner at his own risk and cost including shifting of machinary one place to another place at required location. Actual working house will accounted for the payment and six hours working per day will required average minimum 20cm excavation in all kinds of woil including loading in topper trucks, dewatering and disposal of excavation earth with in all leads and lifts will have to be ensured in one hours. | 135 | Cum | 238 ₹32,130 | 562 ₹75,870 | 550 ₹74,250 | 230 ₹31,050 | 250 ₹33,750 | 95 ₹12,825 Lowest | 559 ₹75,465 |
| 2.00 | Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone aggregate 40mm nominal size and curing complete excluding the cost of form work in foundation and plinth complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 5.4 | Cum | 5,350 ₹28,890 | 72 ₹388.8 | 65 ₹351 Lowest | 5,200 ₹28,080 | 5,500 ₹29,700 | 4,860 ₹26,244 | 70 ₹378 |
| 3.00 | Providing and laying cement concrete work 1:2:4 (1 Cement: 2 sand :4 graded stone aggregate 20mm nominal size ) and curing complete excluding the cost of form work and reinfocement for reinforced concrete work in :Foundations, footings bases of columns and the like and mass concrete as per direction and to the direction of Engineer-in-Charge. | 82.8 | Cum | 6,900 ₹5,71,320 | 8,007 ₹6,62,979.6 | 8,000 ₹6,62,400 | 6,800 ₹5,63,040 | 7,000 ₹5,79,600 | 5,515 ₹4,56,642 Lowest | 8,005 ₹6,62,814 |
| 4.00Providing form work with steel plated 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring,shuttering,strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for insitu-reinforced concrete and plain. | ||||||||||
| 4.01 | Vertical surfaces such as walls(any thickness) partitions and the like including attached pilasters, buttresses, plinth and string courses and the like complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 240 | Sqmt | 380 ₹91,200 | 317 ₹76,080 | 310 ₹74,400 | 380 ₹91,200 | 400 ₹96,000 | 235 ₹56,400 Lowest | 315 ₹75,600 |
| 4.02 | Providing mild or tor steel reinforcement for RCC. Work including bending binding and placing in position complete upto floor two level Tor steel complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 3,312 | Kg | 105 ₹3,47,760 | 112 ₹3,70,944 | 105 ₹3,47,760 | 102 ₹3,37,824 | 105 ₹3,47,760 | 95 ₹3,14,640 Lowest | 110 ₹3,64,320 |
Tender Value
₹11.1 L
EMD Value
₹22,110
Closing Date
9 Mar 2026, 5:00 pmClosed
Executive Engineer
Executive Engineer Jal Shakti Division Bhoranj
CO cut off wall of 40 Rmt. near dyke at RD 3220
2026_HPIPH_130300_1
19707-19766 dt. 03.03.2026
Open Tender
Civil Works
Item Rate
120 days
Executive Engineer Jal Shakti Division Bhoranj
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
EE Bhoranj
₹22,110
9 Sept 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
9 Mar 2026
3 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hiring of earth cutting/excavating machineries to be deployed for earth cutting excavating or filling marking diversion bandh and channel wherever required including cost of fuel oil lubricant and wage of operational staff any repair brakage during operation will be carried out by the owner at his own risk and cost including shifting of machinary one place to another place at required location. Actual working house will accounted for the payment and six hours working per day will required average minimum 20cm excavation in all kinds of woil including loading in topper trucks, dewatering and disposal of excavation earth with in all leads and lifts will have to be ensured in one hours. | 135 | Cum | - | - |
| 2 | Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone aggregate 40mm nominal size and curing complete excluding the cost of form work in foundation and plinth complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 5.4 | Cum | - | - |
| 3 | Providing and laying cement concrete work 1:2:4 (1 Cement: 2 sand :4 graded stone aggregate 20mm nominal size ) and curing complete excluding the cost of form work and reinfocement for reinforced concrete work in :Foundations, footings bases of columns and the like and mass concrete as per direction and to the direction of Engineer-in-Charge. | 82.8 | Cum | - | - |
| 4Providing form work with steel plated 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring,shuttering,strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for insitu-reinforced concrete and plain. | |||||
| 4.01 | Vertical surfaces such as walls(any thickness) partitions and the like including attached pilasters, buttresses, plinth and string courses and the like complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 240 | Sqmt | - | - |
| 4.02 | Providing mild or tor steel reinforcement for RCC. Work including bending binding and placing in position complete upto floor two level Tor steel complete in all respect as per direction and to the entire satisfaction of the Engineer-in-charge. | 3,312 | Kg | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_192662.xls
BOQ • 0.23 MB
Termsandconditions.pdf
Tender Documents • 0.22 MB
Form6.pdf
Tender Documents • 0.56 MB
PWD8.pdf
Tender Documents • 3.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .