Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹9.5 L+₹51,569.47 (5.75%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹10.9 L+₹1.9 L (21.7%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹29,200
Closing Date
23 Jul 2026, 4:00 pmClosed
Er. Mohammad Waseem
Office of the Executive Engineer RnB Ang
CO Protection bund near Ho late Ali Mohd Mir Ward No 16 Kadipora Anantnag.
2026_PWDJK_316557_1
NIT 48 of RnB/Ang/2026-27/4140-49 Dt 17/07/26
Open Tender
Civil Works
Percentage
20 days
Anantnag
Please refer Tender documents.
4 documents required · 4 mandatory
₹600
Executiver Engineer rnB Division Anantnag
₹29,200
28 Jul 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
23 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation by manual means exceeding 30 cms in depth , 1.5 m in width as well as 10 m2 on plan) incl disposal of excavated earth lead upto 10 kms and lift upto 1.5 m as directed by eic all kinds of soil | 203.87 | cum | - | - |
| 2 | Providing and laying of stone soling of tightly hand packed in bed including carriage | 7.62 | cum | - | - |
| 3 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M7.5 mix. (1:4:8) and by using 20 mm down aggregates incl carriage | 8.97 | cum | - | - |
| 4 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using (1:2:4) and by using 20 mm down aggregates incl carriage | 4.53 | cum | - | - |
| 5 | Centering shuttering incl. strutting propping etc and removal of form work fro foundations , footings. Bases of columns for mass concrete | 7.43 | sqm | - | - |
| 6 | supply and filling of stone boulders in wire crates incl cost of crates 4mm annealed | 500.57 | cum | - | - |
| 7 | Carriage of head load 70 mtrs | - | - | - | - |
| 8 | stone boulders | 457.37 | cum | - | - |
| 9 | crates | 2.8 | tonne | - | - |
| 10 | cement | 5.77 | tonne | - | - |
stage.html
html • 0.02 MB
finance_1032900.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_1032900.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .