Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Fee/PreQual/Technical/Finance | -14.15% | ₹4.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.4 L+₹7,752.30 (1.81%)Admitted-Fee/PreQual/Technical/Finance | -12.60% | ₹4.4 L+₹7,752.30 (1.81%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.8 L+₹55,216.36 (12.9%)Admitted-Fee/PreQual/Technical/Finance AJMER | RAJASTHAN | 305001 | -3.11% | ₹4.8 L+₹55,216.36 (12.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Fee not submitted |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
9 Jul 2026, 6:00 pmClosed
Commissioner
Municipal Council Kishangarh
Construction of Community Hall Near Pabuji Mandir in Ward No. 47 (MP-LAD)
2026_DLB_572525_1
04/2026-2027/Vikas
Open Tender
Civil Works
Percentage
180 days
Kishangarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Commissioner
₹10,000
Yes
17 Jul 2026
3 Jul 2026
10 Jul 2026
3 Jul 2026
9 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out theexcavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt,clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 18.59 | Cum | 229.5 | ₹4,266.41 |
| 2 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centring and shuttering - All work upto plinthlevel Code) 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40mm nominal size). | 8.39 | Cum | 4,575 | ₹38,384.25 |
| 3 | Random rubble masonry with hard stone in foundation and plinth : 25.1.1 Cement mortar 1:6 (1 cement : 6 coarse sand) | 8.3 | Cum | 4,860 | ₹40,338 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size | 4.81 | Cum | 6,340 | ₹30,495.4 |
| 5 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete. | 20.38 | Sqm | 236.5 | ₹4,819.87 |
| 6 | Centring and shuttering upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform, etc. for mass concrete | 92.45 | Sqm | 456 | ₹42,157.2 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, helves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto two stories excluding the cost of centring, shuttering, finishing and reinforcement.M-20 rade Concrete (1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) -As per design mix) | 10.53 | Cum | 7,660 | ₹80,659.8 |
| 8 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Thermo twisted bars | 1,204.61 | Kg | 83.3 | ₹1,00,344.01 |
| 9 | Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) | 1.42 | Cum | 5,600 | ₹7,952 |
| 10 | Plastering with cement mortar (1:3) on Brick/stone work in substructure/ super structure at any height complete as per clause 1312 of MoRT&H specification including all material, labour, scaffolding etc. 20 mm plaster on stone work | 122.04 | Sqm | 262 | ₹31,974.48 |
stage.html
html • 0.02 MB
finance_1018483.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Annexure.pdf
Tender Documents • 0.43 MB
BOQ_1018483.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .