Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC NOT SPECIFIED | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.5 L+₹7,941 (3.28%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.9 L+₹48,323 (20.0%)Rejected-Finance GOVT CONTRACTOR DISTT CHAMBA HP 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Jitender Kumar L1 | Darshan Lal L2 | NARENDER KUMAR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations, trenches etc. in earth work, lift upto 1.50 metres stacking the excavated soil not more than 3 metres clear from the edge of excavation and then returning the stacked soil in 15cm layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within a lead of 20m in (100% pick work & 0% jumper work) | 6.94 | Cum | 650 ₹4,511 Lowest | 680 ₹4,719.2 | 700 ₹4,858 |
| 2.00 | Providing and laying cement concrete 1:4:8 (1 Cement : 4 Sand : 8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in Foundation and plinth complete as per direction and to the entire satisfaction of Engineer-in-Charge. | 4.57 | Cum | 10,000 ₹45,700 Lowest | 10,500 ₹47,985 | 18,600 ₹85,002 |
| 3.00 | Random rubble masonry/Polygonal rubble masornry ( uncoursed/ brought to courses) with hard stone of approved quality in foundation and plinth i/c levelling up with cement conrete 1:6:12 (1cement:6 sand :12 graded stone aggregate 20 mm nominal size ) at plinth level in cement motar 1:6 ( 1cement:6 sand) including curing complete as per direction and to the antire satiafaction of the Engineer-in- charge in all lead and lifts. | 11.56 | Cum | 9,500 ₹1,09,820 Lowest | 9,800 ₹1,13,288 | 9,900 ₹1,14,444 |
| 4.00 | Providing and laying cement concrete 1:2:4 (1 Cement : 2 Sand : 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in Foundation and plinth complete as per direction and to the entire satisfaction of Engineer-in-Charge. | 4.5 | Cum | 13,000 ₹58,500 Lowest | 13,200 ₹59,400 | 13,500 ₹60,750 |
| 5.00 | 40 mm thick cement concrete flooring 1:2:4 (1 Cement : 2 Sand : 4 graded stone aggregate 20mm nominal size) laid in one layer finished with a floating coat of neat cement complete as per direction and to the entire satisfaction of Engineer-in-Charge. | 36 | Sqmt | 650 ₹23,400 Lowest | 680 ₹24,480 | 700 ₹25,200 |
Tender Value
₹1.9 L
EMD Value
₹3,870
Closing Date
20 Feb 2026, 5:00 pmClosed
Executive Engineer
O/o Jal Shakti Division Keylong
Construction and repair of various stand posts in GP Madgran SDF 2025/25
2026_HPIPH_128096_1
15062-15112 dated 10.02.2026 Stand Post Udaipur
Open Tender
Civil Works - Water Works
Item Rate
31 days
JSV Sub Division Udaipur
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
EE Keylong
₹3,870
10 Mar 2026
10 Feb 2026
21 Feb 2026
11 Feb 2026
20 Feb 2026
11 Feb 2026
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .