Tender Value
₹2.4 Cr
EMD Value
₹4.9 L
Closing Date
28 Jul 2026, 6:00 pm6d left
EE WR Division I Ajmer
EE WR Division I Ajmer
Construction of anicut near Chhipa Culvert on masuda-kharwa Road P.S. Masuda District Beawar.
2026_WRDAS_573510_1
NIT 01/2026-27_Chhipa Culvert
Open Tender
Civil Works
Percentage
365 days
under jurisdiction of EE Ajmer Division I
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
as per nit
₹4.9 L
Yes
7 Jul 2026
7 Jul 2026
29 Jul 2026
7 Jul 2026
28 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. | 3,763.04 | Sqm | 220 | ₹8,27,868.8 |
| 2 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete) | 439.12 | Cum | 140 | ₹61,476.8 |
| 3 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 27,977.37 | Kg. | 78 | ₹21,82,234.86 |
| 4 | Drilling holes of 35 mm diameter for anchor rods.Upto 1.50 m. depth | 737 | meter | 128 | ₹94,336 |
| 5 | Labour charges for Fixing of anchor bars in neat cement grout including cost of cement and curing etc. complete | 491 | Each | 216 | ₹1,06,056 |
| 6 | Supply of Tor steel anchor bars of required diameter, length and shape at site of work complete. | 3,119.08 | Kg | 61.02 | ₹1,90,326.26 |
| 7 | Preparation of foundation of structure including removal of all loose stones, silt and final washing. By manual labour | 1,038.9 | Sqm | 23 | ₹23,894.7 |
| 8 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary | 4,000 | Sqm | 1.45 | ₹5,800 |
| 9 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum
Add extra over item No. 1 to 5 for excavation under water for all type of strata including dewatering charges. (Quantity under water during actual work is only to be considered) Quantity of excavation below water level in foundation area during continous pump running should only be considered. | 2,394.82 | Cum | 122.5 | ₹2,93,365.45 |
| 10 | Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required | 4,490.28 | cum | 25.5 | ₹1,14,502.14 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_1020195.xls
BOQ • 0.40 MB
FinancialbidChhipaculvert.pdf
Tender Documents • 1.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].