Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹357.3 CrAccepted-AOC | ₹357.3 Cr | L-1 | Accepted-AOC L-1 bidder |
| 2 | L-2₹425.9 CrRejected-Finance 702 7 FLOOR PANCHWATI PLAZA KUTCHERY ROAD RANCHI JHARKHAND 834001 | ₹425.9 Cr | L-2 | Rejected-Finance Not found L-1 |
| 3 | L-3₹442.0 CrRejected-Finance DEE VEE HOUSE MAULSHREE VIHAR IN FRONT OF HOTEL BABYLON INTERNATIONAL VIP ROAD RAIPUR 492006 CHHATTISGARH | ₹442.0 Cr | L-3 | Rejected-Finance Not found L-1 |
| 4 | Rejected-Technical 401 THE GRAND MALL OPP STATE BANK ZONAL OFFICE S M ROAD AMBAWADI AHMEDABAD 380015 | AHMADABAD | GUJARAT | 380015 | - | - | Rejected-Technical Does not fulfil the PQ criteria. |
Tender Value
₹331.8 Cr
EMD Value
₹3.6 Cr
Closing Date
21 Apr 2022, 2:00 pmClosed
AGM Engg (C)
AGM (E-C), Airports Authority of India, Cabin No.-262, Operational Offices, Rangpuri, New Delhi-110037
Detailed Designing, Engineering, Procurement and Construction of Terminal Building, ATC Tower cum Technical Block i/c Utility Building and Associated Works for Civil, Electrical,Airport System, IT, etc. Including Maintenance, Operation and AICMC.
2022_AAI_105804_1
AAI/CHQ/ENGG(C)/IMPHAL/NITB
Open Tender
Construction Works
730 days
Imphal
Please refer Tender documents.
4 documents required · 4 mandatory
₹11,800
₹3.6 Cr
Yes
6 Jul 2022
17 Feb 2022
22 Apr 2022
18 Feb 2022
21 Apr 2022
28 Mar 2022
18 Feb 2022 - 21 Mar 2022
Amount
Detailed Designing, Engineering, Procurement and Construction of Terminal Building, ATC Tower cum Technical Block, Utility buildings, Car Park, etc i/c all Civil, Electrical, Mechanical, Plumbing, Fire Fighting & Fire Alarm, Interior ,Facade , HVAC, Airport System, IT, BMS, PA, CCTV, Signage, Elevator, Escalator, Furniture and Furnishing, Internal roads and car park , landscape, Drainage works, STP, Solar i/c Civil repair, maintenance of Electrical Mechanical , IT,ACS,SCS, Airport system Installations during 2 years Defect Liability Period for New Airport, Imphal, Manipur as per Master plan, Specifications, Codes & Practices contained in the Tender Document. The design of facilities shall confirm to standard specified by FAA, ICAO, DGCA, AAI, MORTH, IRC, NBC, CPWD, IS etc. wherever required and in conformity with ATM / CNS / IMD / BCAS regulations regarding permissible heights, locations requirements etc. i/c all other works covered under Scope of work and meeting all relevant statutory requirements complete as required. Construction of the Project/Work on the Site set forth in Schedule A and as specified in Schedule-B together with provision of Project Facilities as specified in Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D and Special Conditions of Contract, if any. Performance and fulfilment of all other obligations of the Contractor and ensuring compliance to all provisions contained elsewhere in the contract and in accordance with the provisions of this Agreement and matters incidental thereto or necessary for the performance of any or all of the obligations of the Contractor under this Agreement
CIVIL WORKS as per Item no. 1.0
ELECTRICAL & MECHANICAL (E&M) WORKS as per Item no. 1.0
AIRPORT SYSTEM WORKS as per Item no. 1.0
IT SYSTEM WORKS as per Item no. 1.0
Maintenance of the Constructed Project in accordance with the provisions of this Agreement and in conformity with the requirements set forth in Schedule-N Performance and fulfilment of all other obligations of the Contractor and ensuring compliance to all provisions contained elsewhere in the contract and in accordance with the provisions of this Agreement and matters incidental thereto or necessary for the performance of any or all of the obligations of the Contractor under this Agreement.
Operational and Service Charges for maintaining all assets including required materials and T&P (All civil works but excluding horticulture works) constructed under the project for 02 years during Defect liability period.
1st year during DLP
2nd year during DLP
Operational and Service Charges including preventive maintenance , annual repairs and maintaining all assets including all consumables, materials, T&P, and other machineries etc., (All civil works but excluding horticulture works) constructed under the project for 05 years after expiry of Defect liability period of two years.
1st year after DLP
2nd year after DLP
3rd year after DLP
4th year after DLP
5th year after DLP
Operational and Service Charges including preventive maintenance , annual maintenance and maintaining all horticulture works constructed under the project for 07 years.
1st year during DLP
2nd year during DLP
3rd year after DLP
4th year after DLP
5th year after DLP
6th year after DLP
7th year after DLP
PREVENTIVE MAINTENANCE OF COMPLETE E&M INSTALLATION (GENERAL SHIFT) Periodical Preventive Maintenance of Electrical & Mechanical Installations as provided under the main contract and specified in the Special conditions of the contract involving repairs & maintenance & attending to complaints / faults/ breakdowns and taking rectification action, ensuring serviceability / satisfactory working condition of the systems, preventive maintenance, maintenance of records / documentations etc., as per the detailed specifications, terms & conditions covered under this contract.
First year of Defect Liability Period (DLP)
Second year of Defect Liability Period (DLP)
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
OPERATION & ROUTINE MAINTENANCE OF COMPLETE E&M INSTALLATIONS EXCEPT SUB-STATION EQUIPMENTS, DG SETS (2 SHIFTS) Operation and routine Maintenance of complete E&M installations as provided under the main contract except sub-station equipments, DG sets and specified in the Special conditions of the contract involving repairs & maintenance & attending to complaints / faults/ breakdowns and taking rectification action, ensuring serviceability / satisfactory working condition of the systems, preventive maintenance, maintenance of records / documentations etc., as per the detailed specifications, terms & conditions covered under this contract.
First year of Defect Liability Period (DLP)
Second year of Defect Liability Period (DLP)
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
OPERATION & ROUTINE MAINTENANCE OF SUB-STATION EQUIPMENTS, DG SETS (3 SHIFTS) Operation and routine Maintenance of complete sub-station equipments, DG sets and specified in the Special conditions of the contract involving repairs & maintenance & attending to complaints / faults/ breakdowns and taking rectification action, ensuring serviceability / satisfactory working condition of the systems, preventive maintenance, maintenance of records / documentations etc., as per the detailed specifications, terms & conditions covered under this contract.
First year of Defect Liability Period (DLP)
Second year of Defect Liability Period (DLP)
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of Internal & External Installations, i/c Water Bubbler, Water Dispenser, Sliding Doors, Air Curtain, Hand Drier & ATC Tower Beacon, etc. as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 08 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of Lightening Protection System (LPS), etc. as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 08 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of Signages System (Internal & External), etc. as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 08 hours)
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of Power Supply i/c Sub Station Equipments, DG & UPS System, etc. as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 08 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of Elevators & Escalators as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 08 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of HVAC & BMS, etc. as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 08 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of Addressable Fire Alarm & Aspiration System, etc as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 08 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of Fire Protection system i/c Fire Hydrant System, Automatic Sprinkler System, Portable fire Extinguishers, Gas Suppression System, etc. as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 08 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of Sewage Treatment Plant (STP) as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 08 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of Water Treatment Plant and Pumping System as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 08 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of PA & Voice Alarm System (PAVA) as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours).
First year after DLP
Second year after DLP
Third year after DLP
Fourth year after DLP
Fifth year after DLP
All inclusive Comprehensive Maintenance of Grid Connected Solar System as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified (the response time in case of breakdown shall not be more than 8 hours).
First year after DLP
Second year after DLP
AIRPORT SYSTEM
CAMC of Airport System complete of 1st year after 3 years warranty period
CAMC of Airport System complete of 2nd year after 3 years warranty period
CAMC of Airport System complete of 3rd year after 3 years warranty period
CAMC of Airport System complete of 4th year after 3 years warranty period
AIRPORT SYSTEM & IT SYSTEM
Operation & Minor Maintenance of Airport System & IT System complete of 1st year after completion date of work
Operation & Minor Maintenance of Airport System & IT System complete of 2nd year after completion date of work
Operation & Minor Maintenance of Airport System & IT System complete of 3rd year after completion date of work
Operation & Minor Maintenance of Airport System & IT System complete of 4th year after completion date of work
Operation & Minor Maintenance of Airport System & IT System complete of 5th year after completion date of work
Operation & Minor Maintenance of Airport System & IT System complete of 6th year after completion date of work
Operation & Minor Maintenance of Airport System & IT System complete of 7th year after completion date of work
IT SYSTEM
AICMC of Complete IT works 1st year after Defect Liability Period
AICMC of Complete IT works 2nd year after Defect Liability Period
AICMC of Complete IT works 3rd year after Defect Liability Period
AICMC of Complete IT works 4th year after Defect Liability Period
AICMC of Complete IT works 5th year after Defect Liability Period
RAM KRIPAL SINGH CONSTRUCTION PRIVATE LIMITED
DEE VEE PROJECTS LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid