| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED AOC | |
| 2 | L2₹18.9 L+₹18,036.67 (0.96%)Rejected-AOC | L2 | Rejected-AOC REJECTED AOC | |
| 3 | Rejected-Technical | - | Rejected-Technical DOCUMENT INCOMPLETE | |
| 4 | Rejected-Technical | - | Rejected-Technical DOCUMENT INCOMPLETE | |
| 5 | Rejected-Technical | - | Rejected-Technical DOCUMENT INCOMPLETE |
Tender Value
₹23.4 L
EMD Value
₹47,000
Closing Date
16 Feb 2019, 12:00 pmClosed
EE ICD KARWI
OFFICE OF THE EE ICD KARWI
Construction of Boundary Wall at Tinduhi Center Store At Tinduhi Village Mahoba.
2019_UPIDC_306805_5
06/EE/2018-19
Open Tender
Civil Works
Item Rate
90 days
KARWI
AS PER NIT
2 documents required · 2 mandatory
₹1,154
EE ICD
₹47,000
1 Mar 2021
11 Feb 2019
16 Feb 2019
11 Feb 2019
16 Feb 2019
11 Feb 2019
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work.
E/W in excavation in foundation in MKR soil including lead up to 30 m and lift up to 1.5 m etc.
Laying Course sand in foundation including all cost of material, labour T&P etc.
Laying C.C. in 1:3:6 in foundation with 25 to 50mm stone ballast and approved courase sand including all cost of material, labour T&P etc.
R.C.R. stone masonry in 1:4 cm with approved coase sand including all cost of material, labour T&P etc.
Laying C.C. in 1:1.5:3 in over plinth with 6 mm stone grit and approved courase sand including all cost of material, labour T&P etc.
Ist Class brick work in 1:4 cm with approved courase sand including all cost of material, labour T&P etc.
Centering & shuttering for C.C. work including all cost of material, labour T&P etc.
S/F Angle Iron and jali post for Fencing over wall including temping etc. size (50 x 50 x 5) mm length = (0.30+0.45+0.30) = 1.05 RM
Steel Renforcement for Lintel including cutting, bending, binding etc all complete
S/F of bar bed wire for fencing including all cost of material labour T&P etc.
12.5 mm thick plaster in 1:4cm over B/W including all cost of material labour T&P etc.
Providing of priming coat on new wall including all cost of material, labour T&P etc all complete.
Two coat Distemper painting in New wall including all cost of material, labour T&P etc all complete.
Enamel painting two coat over Iron Angle Post including all cost of material, labour T&P etc all complete.
Supply & Fixing main Gate of Boundary wall including all cost of material, labour T&P etc all complete.
AKHILESH KUMAR SHARMA
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .