Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 CrAccepted-AOC | ₹16.3 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹17.8 CrRejected-Finance | ₹17.8 Cr | L2 | Rejected-Finance Not Admitted |
| 3 | L3₹17.8 CrRejected-Finance 24 JEEVAN PLAZA VIRAM KHAND 5 GOMTI NAGAR LUCKNOW UTTAR PRADESH | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹17.8 Cr | L3 | Rejected-Finance Not Admitted |
| 4 | L4₹18.0 CrRejected-Finance | ₹18.0 Cr | L4 | Rejected-Finance Not Admitted |
| 5 | L5₹18.4 CrRejected-Finance 230 NIZAMUDDINPURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH MAU UTTAR PRADESH 275101 | MAU | UTTAR PRADESH | 275101 | ₹18.4 Cr | L5 | Rejected-Finance Not Admitted |
Tender Value
₹25.1 Cr
EMD Value
₹37.7 L
Closing Date
20 Dec 2024, 12:00 pmClosed
SE, JAUNPUR GHAZIPUR CIRCLE, PWD, JAUNPUR
SE, JAUNPUR GHAZIPUR CIRCLE, PWD, JAUNPUR
Widening and Strengthening of Manihari Jakhania Faddopur Marg Ch. 0.000 to 14.000 in Distt Ghazipur. Under Pandit Deen Dayal Yojna (With 5 Year Maintenance)
2024_CEUVZ_975377_2
81/Camp/SE Tender/jnp-gzp circle/24 date 14-10-2024
Open Tender
Civil Works
450 days
JAUNPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,590
₹37.7 L
Yes
SE, JAUNPUR GHAZIPUR CIRCLE, PWD, JAUNPUR
29 Jan 2025
27 Nov 2024
20 Dec 2024
27 Nov 2024
20 Dec 2024
27 Nov 2024
27 Nov 2024
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead (Including Cost of All Matarial T&P, Taxes, Labour Cess etc but Excluding GST )
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
Construction of embankment with approved material obtained from ROW with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. without lead. (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST ) as per direction of engineer-in-charge
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (WMM) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST ) as per direction of engineer-in-charge
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with 1% OPC cement ^ 3.5% emulsion in uniform layer with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (ETA) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST ) as per direction of engineer-in-charge
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
Providing and laying tack coat with bitumen VG-10 using emulsion distributer at the rate of 0.20 Kg / Sqm. on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause no. 503 (I) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST )
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST )
Providing and Laying of Rubber moulded (Red Colour) Interlocking Concrete Block Pavements having thickness 80 mm including leveling and dressing of surface to required level and slope, spreading and moisting 30m thick local sand on bend, filling joints with local sand on bend, filling joints with local sand etc. for proper completion of the work as per drawings and Technical Specification Clause 1504. Rate As per SOR
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling
Plain cement concrete 1:3:6 (M-10) nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Reinforced Cement Concrete (M-20) in Open Foundation complete as per Drawing and Technical Specifications.
Supplying, fitting, and placing MS bar reinforcement in Drain complete as per drawing and technical specifications Clauses 1002, 1010 and 1202, for Bars below 36 mm dia including over laps and wastage, where they are not welded.
Construction of sub-grade and earthen shoulders with approved material obtained from R.O.W. with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No. 300-2
Plain cement concrete 1:4:8 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
RCC Hume Pipes NP-3 (600mm) inculidng collars/spigot iointed with stiff mixture of cement in the proportion of 'l:2 (1 cement : 2 find sand) including testing of joints.
RCC Hume Pipes NP-3 (900mm) inculidng collars/spigot iointed with stiff mixture of cement in the proportion of 'l:2 (1 cement : 2 find sand) including testing of joints.
Struck pointing with cement mortar consisting of 1 part cement and 2 parts of fine sand of 1.25 fineness modulous including supply of all materials, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. SI
PART B Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly.
1st year- maintainance cost 0% on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
2nd year- maintainance cost 0.25% on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
3rd year- maintainance cost 0.50 % on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
4th year- maintainance cost 0.75% on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
5th year- maintainance cost 1.00 % on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
ANUKTA CONSTRUCTION (BID ID -4776136)
SHIVANSH CONSTRCUTION (BID ID -4792517)
V S Y INTERNATIONAL PRIVATE LIMITED (BID ID -4768010)
M/s. PRAKASH CONSTRUCTION (BID ID -4798680)
ganga sagar singh (BID ID -4775345)
ASHTBHUJA CONSTRUCTION (BID ID -4776198)
UMA ASSOCIATES INFRATECH DEVELOPERS PVT LTD (BID ID -4776373)
M/S VINOD KUMAR RAI (BID ID -4771606)
JAI SHAKTI CONSTRUCTION (BID ID -4775540)
M/S M V D INFRA DEVELOPERS PRIVATE LIMITED (BID ID -4796469)
M/S RAM KUMAR PRASAD (BID ID -4797147)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid