Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical CHITRA DEOGHAR | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical BASDIHA DUMARIYA SONARAYTHADI DEOGHAR | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical DUMKA | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical GOPIKANDAR DUMKA | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical DEOGHAR | JHARKHAND | 814112 | Admitted-Fee/PreQual/Technical |
Tender Value
₹4.5 Cr
EMD Value
₹9.0 L
Closing Date
5 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
RURAL DEVELOPMENT SPECIAL DIVISION DUMKA
CONSTRUCTION OF HL RCC BRIDGE OVER NUNBIL RIVER BETWEEN ASTAJORA AND BELIYAJOR UNDER KUSUMGHATA PANCHAYAT IN MASLIYA BLOCK DUMKA DISTRICT
2026_RDSPL_119594_1
RDSD/DMK/MMGSY/02/26-27_Gr.01
Open Tender
Civil Works - Bridges
Percentage
540 days
Dumka
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹9.0 L
7 Nov 2026
5 Oct 2026
7 Nov 2026
5 Oct 2026
5 Nov 2026
5 Oct 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for strucutres
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Depth upto 3 m (a) Bridge - 1377.30 m3 (b) Guard wall - 150.40 m3 (c)Retaininwall - 414.00 m3 (d) Culvert - 227.63 m3 -------------------------------------- Total = 2169.33 m3 | 2,169.33 | Cum | 69.7 | ₹1,51,202.3 |
| 2 | Depth 3 m to 6 m | 1,715.23 | Cum | 76.8 | ₹1,31,729.66 |
| 3 | Excavation for strucutres
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Ordinary Rock ( not requiring blasting)
Mechanical Means | 321.37 | Cum | 374.9 | ₹1,20,481.61 |
| 4 | Filling Annular Space around footing in rock | 72.13 | Cum | 3,790.3 | ₹2,73,394.34 |
| 5 | PCC 1:3:6 in Foundation
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (a) Bridge - 38.86 m3 (b) Guard wall - 40.48 m3 (c)Retaininwall - 27.60 m3 (d) Culvert - 18.73 m3 --------------------------------------- Total = 125.67 m3 | 125.67 | Cum | 3,790.3 | ₹4,76,327 |
| 6 | Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications.
RCC Grade M25
RCC Grade M25 using batching plant,transit mixer & Concrete pump (a) Bridge - 532.21m3 (b)Retaininwall - 151.05 m3 - -------------------------------------- Total = 683.26 m3 | 683.26 | Cum | 4,676 | ₹31,94,923.76 |
| 7 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. (a) Bridge - 40.46m3 (b)Retaininwall - 7.74 m3 - -------------------------------------- Total = 48.20 m3 | 48.2 | mt | 67,457 | ₹32,51,427.4 |
| 8 | Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications
RCC Grade M25
RCC Grade M25 using batching plant, transit mixer & concrete pump
Sub-Total For Upto 5 m= (a) Bridge - 190.88m3 (b)Retaininwall - 76.65 m3 - -------------------------------------- Total = 267.53 m3 | 267.53 | Cum | 4,945.8 | ₹13,23,149.87 |
| 9 | Sub-Total For 5 m to 10 m= | 312.25 | Cum | 5,107.7 | ₹15,94,879.33 |
| 10 | Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications (a) Bridge - 73.62 mt (b)Retaininwall - 10.08 mt - -------------------------------------- Total = 83.70 mt | 83.7 | MT | 67,635.4 | ₹56,61,082.98 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BOQ_161846.xls
BOQ • 0.32 MB
Astajora_SBD.pdf
Tender Documents • 1.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .