Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance | -55.10% | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.4 Cr+₹29.3 L (13.9%)Admitted-Finance | -48.88% | ₹2.4 Cr+₹29.3 L (13.9%) | L2 | Admitted-Finance |
| 3 | L3₹3.3 Cr+₹1.1 Cr (53.7%)Admitted-Finance A 7 62 SECTOR 15 ROHINI DELHI 110089 | NORTH WEST | DELHI | 110089 | -30.99% | ₹3.3 Cr+₹1.1 Cr (53.7%) | L3 | Admitted-Finance |
| 4 | L4₹3.4 Cr+₹1.3 Cr (61.4%)Admitted-Finance | -27.51% | ₹3.4 Cr+₹1.3 Cr (61.4%) | L4 | Admitted-Finance |
Tender Value
₹4.7 Cr
EMD Value
₹9.4 L
Closing Date
1 Apr 2025, 3:00 pmClosed
Executive Engineer
Executive Engineer West Road Division-2/M-112N, PWD, GNCTD, Sainik Vihar, Delhi-110034
Construction of RCC drain under main carriageway after shifting of various underground services from Railway New RCC Drain (Rama road starting point) to Zakhira flyover, Rohtak road under Sub Division WR-21, PWD Division WR-2, New Delhi
2025_PWD_270046_1
42/SE /WMC/2024-25 (80/EE/PWD M-112N/WR-2/2024-25)
Open Tender
Civil Works
Works
240 days
Sub Division WR-21
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹9.4 L
5 Apr 2025
25 Mar 2025
1 Apr 2025
25 Mar 2025
1 Apr 2025
25 Mar 2025
eTendering System Government of NCT of Delhi Created By: Bichittar Singh Created Date/Time: 05-Apr-2025 05:08 PM Tender Title: Construction of RCC drain under main carriageway after shifting of various underground services from Railway New RCC Drain (Rama road starting point) to Zakhira flyover, Rohtak road under Sub Division WR-21, PWD Division WR-2, New Delhi Tender ID: 2025_PWD_270046_1
Tender Inviting Authority: Executive Engineer, PWD DivisionWest Road-2/M-112N, Delhi
Name of Work:Construction of RCC drain under main carriageway after shifting of various underground services from Railway New RCC Drain (Rama road starting point) to Zakhira flyover, Rohtak road under Sub Division WR-21, PWD Division WR-2, New Delhi
NIT No. 42/ SE/WMC/PWD/2024-25 (80/EE/PWD M-112N/WR-2/2024-25)
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 SHIVASHAKTI (ENT) PRIVATE LIMITED (GSTN-07ABHCS6925P1ZK) BID ID -1572929 47166175.00 -48.88 24111348.66 Two Crore Fourty One Lakh Eleven Thousand Three Hundred and Fourty Eight
2.00 ASHOK BUILDERS (GSTN-07ABEPK5920A1Z6) BID ID -1573055 47166175.00 -55.10 21177612.58 Two Crore Eleven Lakh Seventy Seven Thousand Six Hundred and Tweleve
3.00 KAURA CONSTRUCTION COMPANY (GSTN-NA) BID ID -1573170 47166175.00 -30.99 32549377.37 Three Crore Twenty Five Lakh Fourty Nine Thousand Three Hundred and Seventy Seven
4.00 Dinesh Kumar (GSTN-NA) BID ID -1573137 47166175.00 -27.51 34190760.26 Three Crore Fourty One Lakh Ninty Thousand Seven Hundred and Sixty
Lowest Amount Quoted BY: ASHOK BUILDERS(21177612.58)
BOQ Summary Details Tender Title: Construction of RCC drain under main carriageway after shifting of various underground services from Railway New RCC Drain (Rama road starting point) to Zakhira flyover, Rohtak road under Sub Division WR-21, PWD Division WR-2, New Delhi Tender ID: 2025_PWD_270046_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 ASHOK BUILDERS (BID ID -1573055) 21177612.58 L1
2 SHIVASHAKTI (ENT) PRIVATE LIMITED (BID ID -1572929) 24111348.66 L2
3 KAURA CONSTRUCTION COMPANY (BID ID -1573170) 32549377.37 L3
4 Dinesh Kumar (BID ID -1573137) 34190760.26 L4
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.48 MB
BOQ_354484.xls
BOQ • 0.38 MB
BOQ.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .