Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
2 Sept 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
OFFICE OF THE EXECUTIVE ENGINEER REW DIVISION BAND
OFFICE OF THE EXECUTIVE ENGINEER REW DIVISION BAND
Construction of road along with drain path culverts and R Wall at different spots
2022_RDPR_184901_29
NIT 64
Open Tender
Civil Works
Item Rate
BANDIPORA
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Rural Development and Panchayati Raj
₹30,000
3 Sept 2022
22 Aug 2022
3 Sept 2022
22 Aug 2022
2 Sept 2022
22 Aug 2022
Amount
Earth work in excavation for foundation in trenches including dressing of sides, ramming of bottom & disposal of excavated soil up to an avg. lead of 50 Mtrs & lift up to 1.5 Mtrs
Providing and laying of dry stone soling, tightly hand packed and incl. all carriages involved
Providing and laying in position plain cement concrete 1:4:8 mix ratio M7.5 using 40 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level)
Providing and laying in position plain cement concrete 1:3:6 mix ratio M10with 20% plum using 40 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level) incl. carriage
Providing and laying in position reinforced cement concrete 1:2:4 mix ratio M15 using 40 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level)
FormWork/ Shuttering i/c propping, centering and removal. Complete job.
suspended floors both culverts
Reinforcement for RCC work incl cutting bending ,binding placing in position complete job.
Construction of approacs by way earth filling incl carriage 10 kms
Supply ,spreading ,of water bound macadam of graded stone agg of G1 size 90 to 45 mm crushed incl, conslodation with road roller of 8-10 ton capacity , screening watering , binding material ,incl carriage from safapora 38 km average
Supply ,spreading ,of water bound macadam of graded stone agg of G2 size 63 to 45 mm crushed incl, conslodation with road roller of 8-10 ton capacity , screening watering , binding material ,incl carriage from safapora 38 km average
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand)
Dry stone masonary
Providing , installation and fabrication of sign Board 3'x2' ( 1MM) M.S sheet mounted on Angle Iron frame 40 x40 x3 mm 5 feet height embeded in cement concrete 1:2:4
M/s Mohammad Aamir Khan
ALM MAN POWER AND CONSTRUCTION SERVICES PRIVATE LIMITED
nisar ahmad lone
ABDUL AHAD GANIE
M/s Khalid Ahmad Khan
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .