Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹96.9 L
EMD Value
₹1.9 L
Closing Date
23 Mar 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER, WDSC, BAYANA
Construction of PT, MPT, SSB and Other Water Harvesting Structure PS Bayana Under MJSA 2-2
2026_WDSC_545972_1
NIT 07/2025-26/Bayana Bharatpur
Open Tender
Civil Works
Percentage
180 days
Bayana
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
As per Nit/Tender doc
₹1.9 L
1 Apr 2026
14 Mar 2026
24 Mar 2026
14 Mar 2026
23 Mar 2026
14 Mar 2026
Item Description
Dag belling 2.5 cm to 5 cm Deep
Jungle clearance by scaping of grass and shrubs
15 से.मी. तक औसत मिटटी काटकर जमीन की सतह को संवारना (Dressing) तथा वनस्पती तथा छोटे पौधों को हटाना तथा तुच्छ पदार्थ और कुडा करकट को 1.5 मीटर उठान तथा 50 मीटर दूरी तक डालना।
Add extra over item No. 2 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required Cut off Wall (From 3 m depth to 4.5 m depth)
Watering of earth including cost of carriage of water when source of water is up to 1km
Add extra over item No. 2 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required Cut of Wall (From 4.5 m depth to 6.0 m depth)
Compaction of earth or highly weathered strata by manually or plain roller. (Density 90% proctor)
Add extra over item No. 2 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required Cut of Wall (From 6 m depth to 6.5 m depth)
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Soft Soil) I
Supplying, laying & spreading of LDPE film of 250 micronon bed and sides including jointing etc. complete as per specifications including cost of LDPE film, overlapping, adhesive tape etc. with transportation charges upto work site complete. Item No. 39 Ch No IX, WRD 2023
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil)
Benching base and depositing the excavated material including dressing etc. complete within initial lead up to 50 mt and lift up to 1.5 m
Re- handling excavation earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water including loading and un-loading wherever required with cost of dewatering wherever required.
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. Hard / dense soil
मिटटी का विभिन्न दूरी के लिए परिवहन सामग्री को चढ़ाना, उतारना व स्टेकिंग सहित | (परिवहन की लम्बाई निकटतम रूट से गणना की जावेगी न कि सड़क मार्ग से) 2 कि.मी.
Side shuttering including propping etc. complete (to achieve finish F 2 for : (a) Block joints of foundation stilling basins buckets, aprons etc. (non-suspended horizontally laid mass concrete)
कल्वर्ट/पुलिया निर्माण हेतु आरसीसी.(रेन्फोसमेंट सीमेंट कंक्रीट)NP3 ह्युम पाइप एक पंक्ति में आवश्यक ढलान देते हुए सीमेंट मसाला 1:2 में बिछाने/लगाने का कार्य मय कोलर सहित |(मिटटी खुदाई,कंक्रीट व चिनाई कार्य के अलावा) 450/500 mm
Board Display
Dry stone pitching using 15 to 30 cm thick dressed stone including all lift and supply of material etc.
नींव तथा कुर्सी में पत्थर की वे रद्धा-ढोका सीमेंट-बजरी मसाले में, मय बगल की झिरी बन्द करना तथा तराई आदि सहित।(1:6 RATIO)
1:4:8 (i) 40 एमएम क्रेशर ब्रोकन पत्थर की गिटटी के स्थान पर हाथ से टूटी हुई रोडी के उपयोग करने पर वही मात्रा देय होगी परन्तु गिटटी की दर में 30 प्रतिशत की कटौती की जावेगी।(ii) Vibratar and mixure का उपयोग नहीं करने पर 3% कटौती की जावे
stage.html
html • 0.03 MB
technical_973584.pdf
cancelled_1.pdf
pdf • 0.10 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_973584.xls
BOQ • 0.30 MB
tenderdoc.pdf
Tender Documents • 6.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .