| 1 | L1₹19.1 LAccepted-AOC AT KANIHA TALCHER ANGUL ODISHA 759117 | KANIHA | ANGUL | ODISHA | 759117 | ₹19.1 L | L1 | Accepted-AOC AOW ISSUED |
| 2 | L2₹19.9 L+₹83,053.85 (4.35%)Rejected-Finance | ₹19.9 L+₹83,053.85 (4.35%) | L2 | Rejected-Finance BEING L2 |
| 3 | L3₹20.0 L+₹88,461.79 (4.63%)Rejected-Finance AT PO BARIHAPUR PS PARJANG DIST DHENKANAL PIN 759120 | DHENKANAL | ODISHA | 759120 | ₹20.0 L+₹88,461.79 (4.63%) | L3 | Rejected-Finance BEING L3 |
| Sl No | Description | Qty | Unit | LIKU SAHOO L1 | DIPAK KUMAR SAHOO L3 | M/s. MAA HINGULA ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00 | Operation and maintenance of ETP by operating the pump and morter,adding alum,lime to the flash mixture tank and watch and ward of the plant as and when required as per the instruction of Engineer incharge.NOTE:-1) Engaigng 03 nos.of unskilled labour(male) for per day , 2)LABOUR ARE TO BE PAID THROUGH NATIONALISED SCHEDULE BANKS BY THE CONTRACTOR. | 730 | DAYS | 1,380 ₹10,07,400 Lowest | 1,800 ₹13,14,000 | 1,550 ₹11,31,500 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil | 3,784.56 | cum | 80.2 ₹3,03,521.71 | 59 ₹2,23,289.04 Lowest | 60 ₹2,27,073.6 |
| 3.00 | Extra rates (%) for quantities of works, executed: or under water and/or liquid mud, including pumping out water as required. Note for item no. 2.24:- The extra percentage rate is applicable in respect of each item but limited to quantities of work executed in these dificult conditions. The unit, namely, metre depth, to be considered for payment, shall be the depth measured from the sub soil water level up to the centre of gravity of the qty executed in dificult conditions. The depth shall be reckoned correct to 0.10 m, 0.05 m or more shall be taken as 0.10 m and less than 0.05 m ignored. | 5,676.84 | metre depth | 17.59 ₹99,855.62 | 9.5 ₹53,929.98 Lowest | 19 ₹1,07,859.96 |
| 4.00 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 15,813.06 | sqm | 1.5 ₹23,719.59 Lowest | 2.4 ₹37,951.34 | 4 ₹63,252.24 |
| 5.00 | By Mechanical Transport including loading,unloading and stackingManure or sludge Lead - 1 k.m | 3,784.56 | cum | 80.34 ₹3,04,051.55 | 59 ₹2,23,289.04 Lowest | 70 ₹2,64,919.2 |
| 6.00 | Supply of Ferric Alum at work site etc complete.for two years.(THREE LOCATION) | 15 | TONNE | 10,255 ₹1,53,825 | 8,500 ₹1,27,500 Lowest | 12,000 ₹1,80,000 |
| 7.00 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | 1 | Nos | 18,923.73 ₹18,923.73 Lowest | 19,799.59 ₹19,799.59 | 19,746.05 ₹19,746.05 |
Tender Value
₹34.3 L
EMD Value
₹42,900
Closing Date
16 Apr 2026, 5:00 pmClosed
STAFF OFFICER CIVIL KANIHA AREA MCL
STAFF OFFICER CIVIL KANIHA AREA MCL TALCHER ANGUL ODISHA 759117
OPERATION AND MAINTENANCE OF 02 NOS ETP AND 01 NOS WHEEL WASH SYSTEM AT KOCP UNDER KA. FOR A PERIOD OF 730 DAYS
2026_MCL_357926_1
MCL/GM(KA)/SO(C)/26-27/07 DT. 02.04.2026
Open Tender
Civil Works - Others
Item Rate
730 days
KANIHA OCP
AS PER NIT
3 documents required · 3 mandatory
₹42,900
4 Aug 2026
2 Apr 2026
17 Apr 2026
6 Apr 2026
16 Apr 2026
6 Apr 2026
6 Apr 2026 - 9 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Operation and maintenance of ETP by operating the pump and morter,adding alum,lime to the flash mixture tank and watch and ward of the plant as and when required as per the instruction of Engineer incharge.NOTE:-1) Engaigng 03 nos.of unskilled labour(male) for per day , 2)LABOUR ARE TO BE PAID THROUGH NATIONALISED SCHEDULE BANKS BY THE CONTRACTOR. | - | DAYS | - | - |
| - | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | 1 | ₹1 |
| - | Extra rates (%) for quantities of works, executed: or under water and/or liquid mud, including pumping out water as required. Note for item no. 2.24:- The extra percentage rate is applicable in respect of each item but limited to quantities of work executed in these dificult conditions. The unit, namely, metre depth, to be considered for payment, shall be the depth measured from the sub soil water level up to the centre of gravity of the qty executed in dificult conditions. The depth shall be reckoned correct to 0.10 m, 0.05 m or more shall be taken as 0.10 m and less than 0.05 m ignored. | - | metre depth | - | - |
| - | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 1 | sqm | - | - |
| - | By Mechanical Transport including loading,unloading and stackingManure or sludge Lead - 1 k.m | 1 | cum | - | - |
| - | Supply of Ferric Alum at work site etc complete.for two years.(THREE LOCATION) | - | TONNE | - | - |
| - | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.58 MB
Tendernotice_2.pdf
PDF • 2.44 MB
BOQ_370798.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .