SE M1
NCTPS II
CA-CWPH - Unit-II- Attending the leakages in the condenser cooling water inlet A B passes of GRP pipeline joints in the pipeline by well point jetting, dewatering, excavation and laminating with GRP material during the AOH for the year 2026-27
2026_EB_707088_1
NCTPS_II_UII_Spec_112_26_27
Open Tender
Maintenance Works
Works
NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,400
Yes
23 Sept 2026
23 Sept 2026
30 Sept 2026
23 Sept 2026
29 Sept 2026
23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour charges for laying the header pipeline for dewatering pump (well point/jetting pump) in the GRP pipeline for attending the leakage work upto -7 mtrs under ground level so as to dewater the seepage water from the soil and dismantling the dewatering pump on completion of work including hire charges for dewatering pump,discharge pipeline and well point pipeline etc. | 16 | Days | - | - |
| 2 | Labour charges for evacuation of all soils such as sand,silt or other loose soil, light black cotton soil and ordinary earth including depositing the excavated earth away from site with 4 KM lead over an initial lead of 10 m and lift of 2m, levelling the area including cost of all labour, lead, lift etc., complete using coir and nails for attending the leakage in the cooling water carrying GRP pipeline upto -8 mtrs from ground level. | 1,000 | m3 | - | - |
| 3 | Charges for arresting the leak from in the pipe by filling the seepage area with clay, gunny bags, aeroseal powder, stopping the seepage,grinding the joint area, making surface finish for making one number of lamination and pasting with resins for the 2.8 m dia pipe including cost of consumables and T &P's etc., | 230 | m2 | - | - |
| 4 | Labour charges for re-filling with excavated soil complying with standard specification for filling with a head load lead of 100 m,rooling/ compaction,all labour,lift, etc.,complete as directed by the engineer incharge at the location of cooling water carrying GRP pipeline upto ground level. | 1,000 | m3 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_849805.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .