Tender Value
₹43.4 L
EMD Value
₹44,000
Closing Date
3 Sept 2026, 3:00 pm
Registrar, SPPU
Registrar Office, SPPU
As per Schedule B
2026_UOFP_1327699_1
C.A.No.2026-27/SPPU/ESTATE/EE/ CIVIL/05
Open Tender
Civil Works
Percentage
180 days
Campus of SPPU
i)Single similar Building Work/ Building Maintenance or Concrete work done in last 3 financial years(i.e. 23-24, 24-25, 25-26 ii)Avg. annual turnover for last three financial years in all classes of civil Engineering Work (i.e. 23-24, 24-25, 25-26)
7 documents required · 7 mandatory
₹2,000
₹44,000
13 Aug 2026
13 Aug 2026
4 Sept 2026
13 Aug 2026
3 Sept 2026
13 Aug 2026
13 Aug 2026 - 3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material upto adistance of 50m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 100 | One Cubic Metre | 1 | ₹99.9 |
| 2 | Excavation for foundation in Hard murum and boulders including removing the excavated material upto adistance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5m.) By Mechanical Means | 100 | One Cubic Metre | - | - |
| 3 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto adistance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary backfilling with available earth/murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means | 20 | One Cubic Metre | 1 | ₹19.98 |
| 4 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto adistance of 50 metres beyond the building area stacking as directed, dewatering and backfilling with available earth/murum watering, ramming etc. complete. (Liftupto1.5m). By Mechanical Means | 20 | One Cubic Metre | 1 | ₹19.98 |
| 5 | Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20cm thick including hand packing and compacting etc. complete. | 40 | One Cubic Metre | 1 | ₹39.96 |
| 6 | Providing and laying Cast in situ/ Ready Mix cement concrete in M-15 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding/ steps including steel centering, formwork, laying/ pumping, compacting, roughning them if special finishis to be provided, finishing uneven and honey com bed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface, only. | 40 | One Cubic Metre | 1 | ₹39.96 |
| 7 | Providing and laying Cast in situ/ Ready Mix cement concrete M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. work in foundations like raft, strip foundations, grill age and footings of R.C.C. columns and steel stanchions etc. including bailing out water, Steel centering, formwork, cover blocks, laying/ pumping, compaction and curing roughening the surface if special finishis to be provided (Excluding reinforcement and structural steel etc. complete | 2 | One Cubic Metre | 1 | ₹2 |
| 8 | Providing and laying Cast in situ/ Ready Mix cement concrete M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/ pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete, (Excluding reinforcement and structural steel). | 2 | One Cubic Metre | 1 | ₹2 |
| 9 | Providing and laying Cast in situ/ Ready Mix cement concrete in M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/ pumping, compaction and roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel). | 2.5 | One Cubic Metre | 1 | ₹2.5 |
| 10 | Providing and laying Cast in situ/ Ready Mix cement concrete in M-20 of trap/ granite/ quartzite/ gneiss metal for R.C.C. coping to plinth or parapet and sill of doors and windows moulded as per detailed drawings or chamfered as approved by the Engineer including steel centering, form work, cover blocks, laying/ pumping, compacting, curing, finishing and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel). | 50 | One Cubic Metre | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
T1_BhashaCompound.pdf
Tender Documents • 2.40 MB
BOQ_2273539.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].