Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.2 LAccepted-AOC SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹19.8 L+₹56,238 (2.92%)Rejected-AOC BHUCHO | L2 | Rejected-AOC L2 | |
| 3 | L3₹20.0 L+₹75,588 (3.93%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
4 Jan 2022, 4:00 pmClosed
EE, UDEYCE, SRE
OFFICE OF THE EE, UDEYCE, SRE
Construction of Quarter of opreting man,boundry wall,plateform,sump well on Nalhera DY. At K.M. 26.200 and PDBFC (42.518km) for project of Providing 35 Cusec water to Nalhera Dy. AT 26.200km from PDBFC (42.518 km)
2021_UPIDC_658610_1
06/EE/2021-22
Open Tender
Civil Works
Item Rate
21 days
SAHARANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹40,000
18 Jan 2022
22 Dec 2021
5 Jan 2022
22 Dec 2021
4 Jan 2022
22 Dec 2021
Amount
Earth work in excavation in foundation in all type of soil i/c lift upto 1.50 m & lead upto 30 m & including filling, watering & ramming excavated earth into the trenches or into the space between the structure & the side of foundation trenches or into the plinth with removal & disposal of surplus earth as directed by the Engineer-in-Charge. i/c all labour, T&P etc. for proper completion of work.
Laying C.C. 12:4 with stone ballast i/c cost of all material, labour,T&p etc. but excluding cost of centring & shuttering for proper completion of work.
Centering and shuttering of R.C.C. work i/c all labour, T&P etc. for proper completion of work.
Supply & laying Steel reinforcement i/c bending ,binding, cutting, placinf of reinforcement i/c cost of bindidng wire but including cost of all material, labour, T&P etc. for proper completion of work.
Laying of R.C.C M25 (1:1:2) with stone ballast i/c cost of all material, labour & T&P etc but excluding cost of centring & shuttering and steel etc. for proper completion of work.
Laying C.C. 1:3:6 with stone ballast i/c cost of all material, labour,T&p etc. but excluding cost of centring & shuttering for proper completion of work.
Ist class Brick work in 1:4 cement mortar upto 3.00 m height with 60 m. lead of material i/c cost of all material, labour, T&P etc. for proper completion of work.
Laying of R.C.C 1:1½:3 with stone ballast i/c cost of all material, labour & T&P etc but excluding cost of centring & shuttering and steel etc. for proper completion of work.
12 mm thick cement plaster 1:4 on brick masonry including cost of all meterial, labour, T&p etc. for proper completion of work.
S/F Sal wood chokhat/frame with hold fast i/c all cost of material,labour,tools, etc comp
Supply and fixing of 32 mm flush doors commercial quality confirming to I.S. Partl(1983) i/c of wooden cleats, stoppers , fixing adjustment of hingies,boltds,lockes,handle springs fitting withneccessary screws to be supplied departmentaly
S/F Galvanized mosquitos proof heavy qulity over windows and including supply shisham wood batton 8 cmx1 cm at iron 25 mmx4 mm and i/c supply of necessary screws all materials labour tools & plants etc. required for proper completion of the work.
Finishing walls with watrer proofing oncement paint of approved make such as super snowcem durocem, robiacem,guttucem supercem quality and of required shade on undecorated wall surfaces (two coat) overone and i/c one coat white cement primer to give an even shade afterr throughhly brushing the surface to powderd materials.
Painting two coat over priming coat on steel or new wood work with one coat(one is ready mix primerpaint and one coat of approved superior quality ready mixed paint or vanish i/c supply of all materrial, labour,tools & paints etc. com.
Laying C.C. 1:4:8 with stone ballast i/c cost of all material, labour,T&p etc. but excluding cost of centring & shuttering for proper completion of work.
Sanitary work i/c cost of all material, labour,tools etc.
Electrification work i/c cost of all material, labour,tools etc.
Supply& laying of thick precast cement concrete l-Shape inerlocking paver blocks ISI mark confirming to IS:15658-2006 with top layer of min. 5 mm thickness having plan dimension 200x(160+120) of O.P. cement, smooth high gloss linsh,skid resistant manufactured from rubber moulds thtough vibro-cmpression machanism.The compressive strength of concrete paver block shall not be less than 40 Mpa and weight 4.5 kg per i/c cost of material with blaket layer (4.00 cm thick fine sand i/c labour , T&P etc required for proper complition of the work as directed by Engineer -in-charge
SURESH KUMAR CONTRACTOR
SANJEEV SINGH PUNDIR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .