Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹12.2 LAccepted-AOC PIPARIYA ROAD PARASIA TEH PARASIA DISTT CHHINDWARA M P PIN 480441 | PARASIA | CHHINDWARA | MADHYA PRADESH | 480441 | ₹12.2 L Quoted ₹10.3 L | L-1 | Accepted-AOC Lowest Rate |
| 2 | L-2₹12.4 LRejected-Finance | ₹12.4 L | L-2 | Rejected-Finance Higher Rate |
| 3 | L-3₹12.6 LRejected-Finance OPPOSITE PAWAR PETROL PUMP KHAJRI CHHINDWARA PIN 480001 | CHHINDWARA | CHHINDWARA | MADHYA PRADESH | 480001 | ₹12.6 L | L-3 | Rejected-Finance Higher Rate |
| Sl No | Description | Qty | Unit | AAVED SHEIKH L2 | TAJ Group L1 | SHIV SHAMBHU CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation work by manual means in foundation or drains including dressing of sides and ramming of bottom, including getting out the excavated soil and disposal of same within lead of 50M in ordinary rock (i) IC Seam :12.31 Cu.Mtr., (ii) III Seam : 9.36 Cu.Mtr., Total : 21.672 Cu.Mtr. | 21.67 | Cu. Mtr. | 3,500 ₹75,852 | 2,800 ₹60,681.60 | 2,127 ₹46,096.34 |
| 2.00 | Reinforcement Cement Concrete work in walls (any thickness), including attached plasters, buttresses, plinth & string courses, fillets, columns, pillars, piers abutments posts and struts cases upto floor V level excuding the cost of centering and shuttering finishing & reinforcement 1:2:4 (1Cement, 2Coarse Sand, 4Stone aggregate 20mm nominal size) (i) IC Seam : 32.44 Cu.Mtr. (ii) III Seam : 23.04 Cu.Mtr., Total : 55.476 Cu.Mtr. | 55.48 | Cu. Mtr. | 9,900 ₹5.5 L | 9,400 ₹5.2 L | 11,270.27 ₹6.3 L |
| 3.00 | Reinforcement for R.C.C. work including straightening, cutting, bending placing in position and binding all complete Cold twisted bars (i) IC Seam : 2108.34 Kg. (ii) III Seam : 1497.60 Kg., Total : 3605.94 Kg. | 3,605.94 | Kg. | 100 ₹3.6 L | 85 ₹3.1 L | 117.27 ₹4.2 L |
| 4.00 | Centering and shuttering including strutting, propping etc. removal of form for : foundations, footing, bases of columns etc. for mass concrete (i) IC Seam : 134.16 Sq.Mtr. (ii) III Seam : 91.20 Sq.Mtr. Total : 225.36 Sq.Mtr. | 225.36 | Sq. Mtr. | 900 ₹2.0 L | 250 ₹56,340 | 327 ₹73,692.72 |
| 5.00 | 12mm thick of Cement Plaster of mix : 1:4 (i) IC Seam : 124.08 Sq.Mtr. (ii) III Seam : 88.60 Sq.Mtr. Total : 212.68 Sq.Mtr. | 212.68 | Sq. Mtr. | 250 ₹53,170 | 410 ₹87,198.80 | 427 ₹90,814.36 |
| 6.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹16.8 L
EMD Value
₹21,000
Closing Date
29 Jan 2026, 5:00 pmClosed
Staff Officer (Mining), WCL, Pench Area
Office of the Area General Manager Western Coalfields Limited Pench Area Parasia District Chhindwara
Construction of 11 Nos Isolation Stoppings by RCC 6 Nos to isolate the Depillaring Panel D3 of IC Seam and 5 Nos to isolate bunker IC Seam to III Seam at Vishnupuri Underground Mine No II of Pench Area
2026_WCL_351407_1
pe3350-min-e0051-2025-26
Open Tender
Civil Works - Others
365 days
Vishnupuri Underground Mine No. II of Pench Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹21,000
11 May 2026
17 Jan 2026
31 Jan 2026
19 Jan 2026
29 Jan 2026
19 Jan 2026
19 Jan 2026 - 22 Jan 2026
Excavation work by manual means in foundation or drains including dressing of sides and ramming of bottom, including getting out the excavated soil and disposal of same within lead of 50M in ordinary rock (i) IC Seam :12.31 Cu.Mtr., (ii) III Seam : 9.36 Cu.Mtr., Total : 21.672 Cu.Mtr.
Reinforcement Cement Concrete work in walls (any thickness), including attached plasters, buttresses, plinth & string courses, fillets, columns, pillars, piers abutments posts and struts cases upto floor V level excuding the cost of centering and shuttering finishing & reinforcement 1:2:4 (1Cement, 2Coarse Sand, 4Stone aggregate 20mm nominal size) (i) IC Seam : 32.44 Cu.Mtr. (ii) III Seam : 23.04 Cu.Mtr., Total : 55.476 Cu.Mtr.
Reinforcement for R.C.C. work including straightening, cutting, bending placing in position and binding all complete Cold twisted bars (i) IC Seam : 2108.34 Kg. (ii) III Seam : 1497.60 Kg., Total : 3605.94 Kg.
Centering and shuttering including strutting, propping etc. removal of form for : foundations, footing, bases of columns etc. for mass concrete (i) IC Seam : 134.16 Sq.Mtr. (ii) III Seam : 91.20 Sq.Mtr. Total : 225.36 Sq.Mtr.
12mm thick of Cement Plaster of mix : 1:4 (i) IC Seam : 124.08 Sq.Mtr. (ii) III Seam : 88.60 Sq.Mtr. Total : 212.68 Sq.Mtr.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_364173.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.29 MB
BOQ_364173.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid