| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.9 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹32.7 L+₹80,630 (2.53%)Rejected-AOC | L2 | Rejected-AOC Not Lowest | |
| 3 | L3₹32.8 L+₹88,000 (2.76%)Rejected-AOC | L3 | Rejected-AOC Not Lowest | |
| 4 | L4₹33.0 L+₹1.1 L (3.40%)Rejected-AOC | L4 | Rejected-AOC Not Lowest | |
| 5 | L5₹36.1 L+₹4.2 L (13.3%)Rejected-AOC DOOR NO 43 2 BESIDES VIZAG DEFENCE ACADEMY 104 AREA KAPPARADA VISAKHAPATNAM 530013 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530013 | L5 | Rejected-AOC Not Lowest |
Tender Value
₹47 L
EMD Value
₹94,000
Closing Date
8 Jul 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE UTILITY SECUNDERABAD
GE UTILITY, MUDFORT, SECUNDERABAD-500003
MANNING AND OPERATION OF OUT SOURCING OF SERVICES FOR ELECTRIC SUPPLY SYSTEM AT VARIOUS LOCATIONS OF ZONE 1A AND IB UNDER AGE EM NO I OF GE UTILITY SECUNDERABAD
2020_MES_351918_1
GE(U)/SEC/TOKEN/16 OF 2020-21
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
SECUNDERABAD
As per NIT
7 documents required · 7 mandatory
₹500
GE UTILITY SECUNDERABAD
₹94,000
Yes
22 Jul 2020
11 Jun 2020
10 Jul 2020
11 Jun 2020
8 Jul 2020
26 Jun 2020
60 days
Amount
Manning and operation of electric supply system in three shifts, each shift of 08(eight) hours including Sundays and holidays by deploying the manpower as mentioned below for entire system comprising of HT VCBs, substation transformers, GODs, LT panels supply received, supply breakdown/shut down etc including receiving the complaints and detailing the break down party and maintaining necessary records and documents, complaints including cleaning the E/M installations and transformer yards complete all as specified and directed in respect of Zone IA & IB Areas:- (a) Shift timings are as under :- (i) 1st Shift : 0600 hrs to 1400 hrs (ii) 2nd Shift : 1400 hrs to 2200 hrs (iii) 3 rd Shift : 2200 hrs to 0600 hrs (b) Man Power to be employed :- (i) Electrician-03 Nos, 01 No for each shift.
Manning and operation of electric supply system in two shifts, each shift of 08(eight) hours including Sundays and holidays by deploying the manpower as mentioned below for entire system comprising of HT and LT, OH switch gear, panel board, UG cables, street lights, transformers, GODs/Drop out fuse assembly, HT/LT OH lines, stringing of OH lines, laying of cables etc including maintenance of necessary records and documents at Trishul line area, SF Qtrs, MES Key personal Qtrs, TLPH HT/LT feeders, T&ASA, T&ASA Signal Centre, 76 Infantry Brigade, 76 Infantry Bde Signal Coy, Old Allenby lines, New Allenby lines,MAP Ammuguda areas including cleaning the E/M installations and transformer yards complete all as specified and directed in respect of Zone IA & IB Areas:- (a) Shift timings are as under :- (i) 1st Shift: 0700 hrs to 1500 hours (ii) 2nd Shift : 1500 hrs to 2300 hours (b) Man Power to be employed :- (i) Electrician -02 Nos, 01 No for each shift. (ii) SK (Mate) - 02 Nos, 01 No for each shif
Manning and operation of electric supply system in three shifts, each shift of 08(eight) hours including Sundays and holidays by deploying the manpower as mentioned below for entire system comprising of HT VCBs, substation transformers, GODs, LT panels supply received, supply breakdown/shut down etc at Chruch Lines, Arcot lines, 3 TB, CDM, Dhruva Enclave, CDM OTM, Ammuguda Area, 96 Hav Accn ,CTW, T&ASA Signal Coy HT & LT feeders including receiving the complaints and detailing the break down party and maintaining necessary records and documents, complaints including cleaning the E/M installations and transformer yards complete all as specified and directed in respect of Zone IA & IB Areas:- (a) Shift timings are as under :- (i) 1st Shift : 0600 hrs to 1400 hrs (ii) 2nd Shift : 1400 hrs to 2200 hrs (iii) 3 rd Shift : 2200 hrs to 0600 hrs (b) Man Power to be employed :- (i) Electrician -03 Nos, 01 No for each shift. (ii) SK (Mate) - 03 Nos, 01 No for each shift
Manning and operation of electric supply system in two shifts, each shift of 08(eight) hours including Sundays & holidays by deploying the manpower as mentioned below for entire system comprising of HT and LT, OH switch gear, panel boards, UG cables, street lights, transformers GODs/Drop out fuse assembly, HT/LT OH lines, stringing of OH lines, laying of cables etc including maintenance of necessary records and documents at 26 Madras, 202 Engr Regt, 54 Inf Div Pro Unit, 54 Inf Div Area, 1 TB, 54 Inf Div Postal Unit, 54 Inf Div Camp, Haig Line, Lake line, Kargil line, Sanjay line, BEPTA qtrs areas including cleaning the E/M installations and transformer yards complete all as specified and directed in respect of Zone IA & IB Areas:- (a) Shift timings are as under :- (i) 1st Shift : 0700 hrs to 1500 hrs (ii) 2nd Shift : 1500 hrs to 2300 hrs (b) Man Power to be employed :- (i) Electrician -02 Nos, 01 No for each shift. (ii) SK (Mate) - 02 Nos, 01 No for each shift.
Notes for Sl item No1 to 4 :- (a) Submission of proof of crediting the wages into the bank account / payment made to the employees by the Contractor shall be a pre-requisite to release subsequent payments to contractors. The contractor shall also provide the details of individual’s EPF and ESI account No to claim the RAR / FB payment from time to time. Register for wages, complaints and identity of workers will be maintained by the contractor and will be submitted to the department on monthly basis. (b) The rate quoted is deemed to be inclusive of the cost of complaint slips and registers, cost of T&P for maint work of all plants and minor consumables such as gland packing, grease, nut, bolts, PVC insulation tape, screws, fuse wire, clips etc for day to day maintenance including maintaining the records/registers such as Log Sheets, break down register, Plant Running Record Book including Fuel consumption records, area cleaning and maintenance of sub-stations including earth pits near sub-stations and prunning of tree branches near the eletric over head lines etc for day to day maintenance.
(c) The rate quoted is deemed to be inclusive of providing mobile communication system in the complaint cell so that the complaint can be lodged and feed back can be obtained. (d) Stores viz fitting/fixtures, cable etc shall be issued by the department for replacing unserviceable fittings/fixtures, cables etc where required at no extra cost to the Government. The stores to the extent available in the stores shall be issued. (e) The contractor has to supply uniform to their employees for wearing during the working hours. The unit rate is deemed to include for the uniform. The uniform shall be in blue colour pant and shirt.The pattern of the uniform shall be as decided by the Engineer-in-Charge.
(f) Technician/employees employed by the contractor will not work contineously for 07 days. The employees worked for six days contineously should be given one day off with payment as per the contract labour act as referred in condition 58 of IAFW-2249. (g) The contractor is responsible for submitting the documents of qualification / experience certificate of employees before commencement of work. (h) The rate considered is deemed to include for 1st hour maintenance including cleaning and replacement of minor spare parts of unserviceable bolts, nuts and twin washers as and when required. (j) The rate considered is deemed to include the cost towards maintenance of hygienic condition and around the installations. The contractor is fully responsible towards the health of staff employed.
M Laxmana Rao and Sons
The Deccan Engineering and Refrigeration Company
Jahnavi enterprices
Mavee Syndicate
omsai thermax engineers
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .