| 1 | L1₹43.1 LAccepted-AOC | ₹43.1 L | L1 | Accepted-AOC WORK ORDER |
| 2 | L2₹45.6 LRejected-Finance SOUTH THOTTAM PALAKKANTHU PO DINDIGUL WEST TALUK DINDIGUL 624 019 TAMIL NADU | 624019 | ₹45.6 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | S PRABHU SELVARAJ CONTRACTOR L2 | S.RAVI CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.0002) Construction of Minor Bridge at Konur Sankankulam H/ O Konur ESTIMATE COST : 32.14 Lakhs | |||||
| 2.00 | Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B | 91.67 | Cum | 278 ₹25,484.26 | 262 ₹24,017.54 |
| 3.00 | Cemant Concrete 1:4:8 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc, (Foundation) | 32.95 | Cum | 5,730 ₹1.9 L | 5,410 ₹1.8 L |
| 4.00 | CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Super structure) | 130.01 | Cum | 6,000 ₹7.8 L | 5,684 ₹7.4 L |
| 5.00Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes | |||||
| 6.00 | Sub Structure | 286.21 | Sqm | 578 ₹1.7 L | 546 ₹1.6 L |
| 7.00 | Super Structure | 84.58 | Sqm | 1,160 ₹98,112.80 | 1,094 ₹92,530.52 |
| 8.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor. | 4.35 | MT | 97,400 ₹4.2 L | 91,930 ₹4.0 L |
| 9.00 | RCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block) | 6.21 | Cum | 9,000 ₹55,890 | 8,495 ₹52,753.95 |
| 10.00 | Rein Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. | 25.65 | Cum | 9,500 ₹2.4 L | 9,040 ₹2.3 L |
Tender Value
Refer Docs
EMD Value
₹44,000
Closing Date
6 Jan 2026, 3:00 pmClosed
The Project Director DRDA Dindigul
The Project Director DRDA Dindigul
Construction of Minor Bridge and Culvert in Reddiyarchatram block of Dindigul District TN05-31
2025_RDTN_637269_1
Roc.No.6746-2025-Tender
Open Tender
Civil Works
180 days
DRDA DINDIGUL
Construction of Minor Bridge and Culvert in Reddiyarchatram block of Dindigul District TN05-31
2 documents required · 2 mandatory
₹0
₹44,000
DRDA DINDIGUL
20 Feb 2026
29 Dec 2025
6 Jan 2026
29 Dec 2025
6 Jan 2026
29 Dec 2025
2 Jan 2026
02) Construction of Minor Bridge at Konur Sankankulam H/ O Konur ESTIMATE COST : 32.14 Lakhs
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
Cemant Concrete 1:4:8 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc, (Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Super structure)
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub Structure
Super Structure
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
RCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Rein Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Wearing Coat with CC 1 : 1.5 : 3 mix using 65% of 25mm, 25% of 12mm, and10% of 6mm IRC metal including cost of all materials and labour charges for mixing, laying, compacting and curing etc. complete. - 75mm uniform thickness
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Providing Weep Holes in Brick masonary reinforced cc with 100mm Dia AC pipe extending through the full witdth of the struction with standard specification
Provision for Expansion joint inbetween the dirt wall & Deck in Abutment and inbetween deck in Pier in standard specification
Providing and fixing Kraft paper full width of deck slab and including cost and conveyance to work site, labour for fixing the same in corect position and all other incidental charges etc.,complete as per standard specifications.
Name Board cgarges
Construction of Retaining wall
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
Cemant Concrete 1:4:8 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc, (Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Super structure)
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub Structure
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
01) Construction of 3.0m Span RCC Slab Culvert at Thasavanayakanpatty near Sivamani Thottam H/O Pudhuchatram ESTIMATE COST : 11.54 Lakhs
Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation.
Providing and laying for plain cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Providing and laying for plain cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials at site and watering and compacting etc.,complete complying with standard specifications
Providing and laying Plain cement concrete 1:2:4 using 20mm ISS HBG metal in superstructure as per drawings and MORD technical specification clauses 800,1250.4 & 1205.5 Design mix M25 for Bed block & Dirt wall
Providing and laying Reinforced cement concrete 1:1.5:3 using 20mm ISS HBG metal in superstructure as per drawings and MORD technical specification clauses 800,1250.4 & 1205.5 Design mix M25 for Deck slab
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete. for Below sill
Centering : Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm fo
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Providing and fixing PVC EXPANSION JOINT in between Deck slabs over abutment and pier as shown in the Drawing including cost and conveyance of expansion Joints including Shalimar pad and joint sealant etc., Complete 1 joint.
Providing and fixing Kraft paper full width of deck slab and including cost and conveyance to work site, labour for fixing the same in corect position and all other incidental charges etc.,complete as per standard specifications.
Gravel filling behind the Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, including labour charges for filling in layers, watering, tamping under optimum moisture content to get the maximum density all other incidental charges etc., complete.
Providing and fixing 100 mm Dia PVC Seepage pipes of required lengths for abutment and retaining walls including cost and conveyance of all materials to work site. Cost and labour for semispherical back fill arrangements with 100 mm size broken granite chips at the periphery and labour charges for fixing etc complete to drain the backfill as per standard specification.
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_762693.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid