| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-AOC | ₹7.7 L | L1 | Accepted-AOC WO |
| 2 | Rejected-Technical | - | - | Rejected-Technical L5 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical L4 |
Tender Value
₹10.4 L
EMD Value
₹10,424
Closing Date
22 Mar 2026, 5:00 pmClosed
Executive Officer, Balasore Municipality
Executive Officer, Balasore Municipality
EXECUTION OF DIFFERENT ACTIVITIES IN BALASORE ZILLA SCHOOL UNDER PM-SHRI SCHEME FOR THE YEAR 2024-25 AND 2025-26
2026_ORULB_127140_4
BM_14_2025_26
Open Tender
Civil Works - Others
Percentage
60 days
Balasore Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹10,424
Yes
18 Jul 2026
11 Mar 2026
23 Mar 2026
11 Mar 2026
22 Mar 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying all labour, T& P for earthwork in excavation of foundation in Ordinary soil incl rough dressing and levelling the bed, depositing the soil within 50mtr. | 44.33 | Cum | 206.06 | ₹9,134.64 |
| 2 | Filling in foundation and plinth with sand well watered,rammed etc including all cost conveyance roalty ,labour and T&P etc. complete as directed by the Engineer - in Charge. | 29.56 | Cum | 1,399.33 | ₹41,357.2 |
| 3 | Cement concrete (1:2:4) with 12mm hard granite chips(Crusher broken) with all cost conveyance,royalty,taxes etc all complete. | 44.33 | Cum | 8,191.18 | ₹3,63,135.49 |
| 4 | Provision for Pole Net and other Equipments for vollyball, badminton court | 1 | LS | 10,101.16 | ₹10,101.16 |
| 5 | Dismantalling and removing of old tiles cladding walls including racking out joints 12mm deep including all cost in Ground Floor | 1 | Sqm | 75.01 | ₹74.93 |
| 6 | Dismantalling and removing of old tiles cladding walls including racking out joints 12mm deep including all cost in 1st floor | 104.16 | sqm | 78.27 | ₹8,152.21 |
| 7 | Dismantalling and removing of old tiles flooring including removing the base coarse and stacking the useful material incl all cost in Ground Floor | 13.58 | sqm | 144.25 | ₹1,958.92 |
| 8 | Dismantalling and removing of old tiles flooring including removing the base coarse and stacking the useful material incl all cost in 1st Floor | 40.87 | sqm | 150.52 | ₹6,151.75 |
| 9 | Fixing Tiles in floor treads or steps and landing on 25mm thk bed of CM in (1:1) including all cost of vitrified tiles | 54.45 | sqm | 1,442.46 | ₹78,545.55 |
| 10 | Fixing Tiles in Dado/Skirting on 12mm thk Cement plaster in CM in (1:3) including all cost of vitrified tiles | 139.77 | sqm | 1,373.78 | ₹1,92,009.8 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_584700.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .