| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC | ₹4.5 L | L1 | Accepted-AOC LER |
| 2 | L2₹4.6 LRejected-Finance | ₹4.6 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | T K Srinivasan L2 | DIWAKAR V L1 |
|---|---|---|---|---|---|
| 11.00Part 01: Repairs to P.U.E.SCHOOL Toilet at Thoppanayagam Habitation in Senniyaviduthi Panchayat. | |||||
| 12.00 | Chipping the plastered surface and remove away from the site including all charges complying with standard specification and as directed. | 6.09 | Sqm | 26 ₹158.34 | 25 ₹152.25 |
| 13.00 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm thick complete complying with standard specification and as directed. | 6.09 | Sqm | 170 ₹1,035.30 | 165 ₹1,004.85 |
| 14.00 | White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed. | 6.72 | Sqm | 35 ₹235.20 | 33 ₹221.76 |
| 15.00 | Distempering two coats over one coat of primer inculding cost and conveyance of all materials to site and all labour charges etc complete | 45.68 | Sqm | 150 ₹6,852 | 140 ₹6,395.20 |
| 16.00 | Painting two coats with Emulsion Paint over the one coat of Priming coat inculding cost and conveyance of all materials to site and all labour charges etc complete | 44.78 | Sqm | 260 ₹11,642.80 | 250 ₹11,195 |
| 17.00 | Painting two coats over New steel Door works using synthetic enamel paint inculding cost and conveyance of materials and all labour charges etc.,complete | 15.52 | Sqm | 150 ₹2,328 | 150 ₹2,328 |
| 18.00 | Supply and fixing of steel door including inculding cost and conveyance of materials and all labour charges etc.,complete (Door-0.60mx1.40m) | 2 | No's | 1,800 ₹3,600 | 1,795 ₹3,590 |
| 19.00Part 02: Repairs to P.U.E.SCHOOL Toilet at Thoppanayagam Habitation in Senniyaviduthi Panchayat. | |||||
| 20.00 | Chipping the plastered surface and remove away from the site including all charges complying with standard specification and as directed. | 6.09 | Sqm | 26 ₹158.34 | 25 ₹152.25 |
Tender Value
₹7.6 L
EMD Value
₹7,560
Closing Date
17 Jul 2025, 3:00 pmClosed
Block Development Officer (B.P), Thiruvonam
Panchayat Union Office, Thiruvonam
Part 01 Repairs to PUESCHOOL Toilet at Thoppanayagam Habitation in Senniyaviduthi Panchayat Part 02Repairs to PUESCHOOL Toilet at
2025_RDTN_575218_1
RcNo9052025A2dated27062025
Open Tender
Civil Works
Panchayat Union Office, Thiruvonam
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹7,560
8 Dec 2025
8 Jul 2025
17 Jul 2025
8 Jul 2025
17 Jul 2025
8 Jul 2025
Amount
Part 01: Repairs to P.U.E.SCHOOL Toilet at Thoppanayagam Habitation in Senniyaviduthi Panchayat.
Chipping the plastered surface and remove away from the site including all charges complying with standard specification and as directed.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm thick complete complying with standard specification and as directed.
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Distempering two coats over one coat of primer inculding cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats with Emulsion Paint over the one coat of Priming coat inculding cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over New steel Door works using synthetic enamel paint inculding cost and conveyance of materials and all labour charges etc.,complete
Supply and fixing of steel door including inculding cost and conveyance of materials and all labour charges etc.,complete (Door-0.60mx1.40m)
Part 02: Repairs to P.U.E.SCHOOL Toilet at Thoppanayagam Habitation in Senniyaviduthi Panchayat.
Chipping the plastered surface and remove away from the site including all charges complying with standard specification and as directed.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm thick complete complying with standard specification and as directed.
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Distempering two coats over one coat of primer inculding cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats with Emulsion Paint over the one coat of Priming coat inculding cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over New steel Door works using synthetic enamel paint inculding cost and conveyance of materials and all labour charges etc.,complete
Part 03: Repairs to P.U.E.SCHOOL Toilet at Thoppanayagam Habitation in Senniyaviduthi Panchayat.
Chipping the plastered surface and remove away from the site including all charges complying with standard specification and as directed.
Paving the floor with pre-polished concrete anti-skid step tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick thick complete complying with standard specification and as directed.
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick complete complying with standard specification and as directed.
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Distempering two coats over one coat of primer inculding cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats with Emulsion Paint over the one coat of Priming coat inculding cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over New steel Door works using synthetic enamel paint inculding cost and conveyance of materials and all labour charges etc.,complete
Supply and fixing of steel door including inculding cost and conveyance of materials and all labour charges etc.,complete (Door-0.60mx1.40m)
Part 04: Repairs to P.U.E.School RCC Single Class Room Building(South Facing) at Thoppanayagam Habitation in Senniyaviduthi Panchayat.
Chipping the existing plastered surface and removed away including cost and conveyance of all materials to site and all labour charges etc
Paving the floor with best approved quality fine polished shahabad stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three sand)thick including cost and conveyance of all materials to site and all labour charges etc
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick complying with standard specification and as directed by the departmental officers(Sub Data for pointing)
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete for 10 Sqm
Painting the walls with two coats of Exterior Emulsion Paint over one coat of primer as instructed by the department officers including preparation of surface curing
Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Black board Painting two coats using black oxide for Old blackboard including cost and conveyance of paint and all labour charges etc complete
Provision for Electrification
Provision for TubeLight (4.36W)
Provision for Fan (SD 110)
Provision for Chappal rack
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Plastering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Painting the walls with two coats of Exterior Emulsion Paint over one coat of primer as instructed by the department officers including preparation of surface curing
Supply and providing 20/30 mm tk polished kadappa slab for Lunch box cubboard top, including laying in correct allignment with necessary. cemer morter and black powder etc complete .
Provision for Rain water Harvesting
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Supply and filling Materials as per standard and specification etc complete
60mm dia RCC Ring
60mm dia RCC cover
40mm metal
20mm metal
Supplying and fixing PVC Rain water Down fall pipes of following dia meter etc.., complete
Part 05: Repairs to P.U.E.School RCC Two Class Room Building at Thoppanayagam Habitation in Senniyaviduthi Panchayat.
Chipping the existing plastered surface and removed away including cost and conveyance of all materials to site and all labour charges etc
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers(Sub data for Pointing)
Paving the floor with best approved quality fine polished shahabad stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc.,
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete for 10 Sqm
Painting the walls with two coats of Exterior Emulsion Paint over one coat of primer as instructed by the department officers including preparation of surface curing
Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Black board Painting two coats using black oxide for Old blackboard including cost and conveyance of paint and all labour charges etc complete
Provision for Electrification
Provision for TubeLight (4.36W)
Provision for Light Point (SD 18)
Provision for Fan (SD 110)
Provision for Teachers Cubboard
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved
Provision for Chappal rack
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Plastering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Painting the walls with two coats of Exterior Emulsion Paint over one coat of primer as instructed by the department officers including preparation of surface curing
Supply and providing 20/30 mm tk polished kadappa slab for Lunch box cubboard top, including laying in correct allignment with necessary. cemer morter and black powder etc complete .
Provision for Rain water Harvesting
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Supply and filling Materials as per standard and specification etc complete
60mm dia RCC Ring
60mm dia RCC cover
40mm metal
20mm metal
Supplying and fixing PVC Rain water Down fall pipes of following dia meter etc.., complete
Part 06: Repairs to P.U.E.School RCC Single Class Room Building(North Facing) at Thoppanayagam Habitation in Senniyaviduthi Panchayat.
Chipping the existing plastered surface and removed away including cost and conveyance of all materials to site and all labour charges etc
Pointing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand)including curing etc., complete complying with standard specification and as directed by the departmental officers(Sub data for Pointing)
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete for 10 Sqm
Painting the walls with two coats of Exterior Emulsion Paint over one coat of primer as instructed by the department officers including preparation of surface curing
Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Black board Painting two coats using black oxide for Old blackboard including cost and conveyance of paint and all labour charges etc complete
Provision for Electrification
Provision for TubeLight (4.36W)
Provision for Fan Point (SD 18)
Provision for Chappal rack
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Plastering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Painting the walls with two coats of Exterior Emulsion Paint over one coat of primer as instructed by the department officers including preparation of surface curing
Supply and providing 20/30 mm tk polished kadappa slab for Lunch box cubboard top, including laying in correct allignment with necessary. cemer morter and black powder etc complete .
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
T K Srinivasan (BID ID -1404674)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid