| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.9 Cr+₹2,144 (<0.01%)Admitted-Finance | ₹2.9 Cr+₹2,144 (<0.01%) | L2 | Admitted-Finance |
| 3 | L3₹3.2 Cr+₹32.6 L (11.5%)Admitted-Finance | ₹3.2 Cr+₹32.6 L (11.5%) | L3 | Admitted-Finance |
| 4 | L4₹3.3 Cr+₹43.9 L (15.4%)Admitted-Finance NH 3 A 145 VINDHYANAGAR SINGRAULI MADHYA PRADESH 486885 | SINGRAULI | MADHYA PRADESH | 486885 | ₹3.3 Cr+₹43.9 L (15.4%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S KUMAR ENGINEERING COMPANY L1 | M/s Krishna Engineering Works L4 | MS BASANT LAL L3 | Deen Dayal L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Round the clock Cleaning of equipment’s, Chocking Removal, Collection and Transportation of coal/ coal dust and other miscellaneous works in the CHP ‘A’TPS, 3x210 MW, Anpara. (01 Job = 01 month, see details in scope of work). | 24 | Month | 4,13,700 ₹99,28,800 Lowest | 4,82,000 ₹1,15,68,000 | 4,60,000 ₹1,10,40,000 | 4,13,717 ₹99,29,208 |
| 2.00 | Round the clock checking and operation of Primary and secondary crushers with auxiliaries and equipment installed at TP-1, TP-3, TP-4, TP-6, and 54 Meter including Travelling Trippers installed in Coal Handling Plant of 3X210 MW, ATPS, Anpara. (01 Job = 01 month, see details in scope of work). | 24 | Month | 3,60,370 ₹86,48,880 Lowest | 4,45,403.65 ₹1,06,89,687.6 | 4,30,000 ₹1,03,20,000 | 3,60,373 ₹86,48,952 |
| 3.00 | Round the clock checking /Breakdown/preventive maintenance and operation of dust extraction/dust suppression system, ventilation fans, sump pumps, Air conditioning System & other miscellaneous work of the CHP, 3 x210 MW, A’ TPS, Anpara”. (01 Job = 01 month, see details in scope of work). | 24 | Month | 74,415 ₹17,85,960 | 87,000 ₹20,88,000 | 70,000 ₹16,80,000 Lowest | 74,426 ₹17,86,224 |
| 4.00 | Removal of coal chocking from the grating of T/H and assistance in feeding at the time of coal feeding from bulldozers as well as fire quenching & dust suppression by spraying water in Primary coal yard of CHP, 3x210 MW, A’TPS, Anpara. (01 Job = 01 month, see details in scope of work). | 24 | Month | 2,99,400 ₹71,85,600 Lowest | 3,08,763 ₹74,10,312 | 3,25,000 ₹78,00,000 | 2,99,415 ₹71,85,960 |
| 5.00 | Engagement of JCB machine on hour rental basis for segregation of foreign materials/ stones/shifting and digging of coal in Primary Coal Yard.( 1 Job=One hours, see details in scope of work). | 1,040 | Hour | 925 ₹9,62,000 | 1,100 ₹11,44,000 | 900 ₹9,36,000 Lowest | 926 ₹9,63,040 |
Tender Value
₹3.6 Cr
EMD Value
₹7.2 L
Closing Date
16 May 2023, 6:00 pmClosed
Superintending Engineer-V, ATPS, Anpara, Sonebhadr
Office of Superintending Engineer-V, ATPS, Anpara, Sonebhadra. mob 9415900587,9415903068
The work of complete general AN Round the clock wise cleaning , shifting of spilled/slurry coal to coal yards , cleaning of bunkers and track hoppers from inside, removal of chocking chutes, crushers etc, checking and operation assistance of all
2023_RVUNL_798565_1
ET-01/CHD-I/ATPS/2023-2024
Open Tender
Miscellaneous Works
Fixed-rate
730 days
CHP ATPS ANPARA
As Per PQC
3 documents required · 3 mandatory
₹11,800
Dy CAO CFA and BO ATPS
₹7.2 L
ANPARA THERMAL POWER PLANT
8 Jun 2023
22 Apr 2023
19 May 2023
22 Apr 2023
16 May 2023
22 Apr 2023
22 Apr 2023 - 16 May 2023
10 May 2023
Amount
Round the clock Cleaning of equipment’s, Chocking Removal, Collection and Transportation of coal/ coal dust and other miscellaneous works in the CHP ‘A’TPS, 3x210 MW, Anpara. (01 Job = 01 month, see details in scope of work).
Round the clock checking and operation of Primary and secondary crushers with auxiliaries and equipment installed at TP-1, TP-3, TP-4, TP-6, and 54 Meter including Travelling Trippers installed in Coal Handling Plant of 3X210 MW, ATPS, Anpara. (01 Job = 01 month, see details in scope of work).
Round the clock checking /Breakdown/preventive maintenance and operation of dust extraction/dust suppression system, ventilation fans, sump pumps, Air conditioning System & other miscellaneous work of the CHP, 3 x210 MW, A’ TPS, Anpara”. (01 Job = 01 month, see details in scope of work).
Removal of coal chocking from the grating of T/H and assistance in feeding at the time of coal feeding from bulldozers as well as fire quenching & dust suppression by spraying water in Primary coal yard of CHP, 3x210 MW, A’TPS, Anpara. (01 Job = 01 month, see details in scope of work).
Engagement of JCB machine on hour rental basis for segregation of foreign materials/ stones/shifting and digging of coal in Primary Coal Yard.( 1 Job=One hours, see details in scope of work).
Deen Dayal
MS BASANT LAL
M/s Krishna Engineering Works
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Tendernotice_2.pdf
PDF • 0.50 MB
BOQ_1334695.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .